ML22158A346

From kanterella
Jump to navigation Jump to search
Fer 2020 Ile ES-301-5 Transient and Events Checklist
ML22158A346
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/21/2020
From:
NRC/RGN-III/DRS/OLB
To:
DTE Energy
Baker R
Shared Package
ML19128A202 List:
References
Download: ML22158A346 (3)


Text

ES-301 Transient and Event Checklist Form ES-301-5 Facility: Fermi 2 Date of Exam: 12/7/2020 Operating Test No.: 2020-1 A E Scenarios P V 1 2 3 4 T M P E O I L N CREW CREW POSITION CREW POSITION CREW POSITION T N I T POSITION I

C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)

T P E R I U SRO-U1 RX 1 5 2 1 1 0 RO NOR 1 1 1 1 1

SRO-I I/C 234 648 10 4 4 2 679 3 SRO-U MAJ 58 7 3 2 2 1

TS 43 62 4 0 2 2 SRO-U2 RX 1 1 1 1 0 RO NOR 1 1 1 1 1

SRO-I I/C 234 63 8 4 4 2 679

SRO-U MAJ 58 7 3 2 2 1 TS 43 2 0 2 2 SRO-U3 RX 5 1 1 1 0 RO NOR 1 1 1 1 1

SRO-I I/C 47 648 7 4 4 2 9 3 SRO-U MAJ 58 7 3 2 2 1

TS 62 2 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: Fermi 2 Date of Exam: 12/7/2020 Operating Test No.: 2020-1 A E Scenarios P V 1 2 3 4 T M P E O I L N CREW CREW POSITION CREW POSITION CREW POSITION T N I T POSITION I

C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)

T P E R I U SRO-D1 RX 1 5 2 1 1 0 RO NOR 0 1 1 1

SRO-I I/C 234 48 8 4 4 2 679 SRO-U MAJ 58 7 3 2 2 1

TS 43 2 0 2 2 SRO-D2 RX 1 5 2 1 1 0 RO NOR 1 1 1 1 1

SRO-I I/C 236 648 7 4 4 2 3

SRO-U MAJ 58 7 3 2 2 1 TS 62 2 0 2 2 RO1 RX 5 1 1 1 0 RO NOR 0 1 1 1

SRO-I I/C 47 48 5 4 4 2 9

SRO-U MAJ 58 7 3 2 2 1

TS 0 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: Fermi 2 Date of Exam: 12/7/2020 Operating Test No.: 2020-1 A E Scenarios P V 1 2 3 4 T M P E O I L N CREW CREW POSITION CREW POSITION CREW POSITION T N I T POSITION I

C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)

T P E R I U RO2 RX 5 1 1 1 0 RO NOR 0 1 1 1

SRO-I I/C 47 48 5 4 4 2 9

SRO-U MAJ 58 7 3 2 2 1

TS 0 0 2 2 RO3 RX 1 1 1 1 0 RO NOR 1 1 1 1 1

SRO-I I/C 236 63 5 4 4 2 MAJ 58 7 3 2 2 1 SRO-U TS 0 0 2 2 RO4 RX 1 1 1 1 0 RO NOR 1 1 1 1 1

SRO-I I/C 236 63 5 4 4 2 MAJ 58 7 3 2 2 1 SRO-U TS 0 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.