NRC ILE Outline and Operating Test Submittal Comments 2017 Perry Retake Examination CE: RD Baker Outline Submittal Comment Facility Action/Response General Outline No Comments N/A Comment 1 of 3

NRC ILE Outline and Operating Test Submittal Comments 2017 Perry Retake Examination CE: RD Baker Operating Test Submittal Comments Admin JPMs Licensee Response/Resolution ADMIN 1A COO1 It appears that we are we asking the applicant a Licensee - agreed.

question (Step 5-NC) which is a direct lookup from the in Removed Step 5 from the JPM.

use procedure.

ADMIN 1B COO2 The JPM should specify which minimum FENOC shift Licensee - agreed.

staffing must be met by the oncoming crew. Changed Initiating Cue to read . . . meet all minimum FENOC shift staffing requirements.

ADMIN 2 EC No Comments None ADMIN 3 RC 1) How is the resetting of the Rad Monitor Setpoint tied Licensee - ORM requirement 6.2.6.

to TS 3.7.5?

2) Step 6 should not be a Critical Step; if the applicant Licensee - agreed.

takes no action, the step is successfully completed. Changed Step 5 to Non-Critical.

ADMIN 4 EP The procedural requirement is a time-sensitive action, Licensee - agreed.

but the JPM itself is not time critical. Removed the Time Critical designation from the JPM; Step is still a Critical Step for the JPM.

2 of 3

NRC ILE Outline and Operating Test Submittal Comments 2017 Perry Retake Examination CE: RD Baker Operating Test Submittal Comments Simulator/CR/IP System JPMs Licensee Response/Resolution SIM JPM a Do we need to provide the applicant with IOI-12 to use Licensee - No; IOI-12 tells the applicant for monitoring Reactor Temperature? Does he which instruments to use to monitor reactor document monitoring anywhere? Part of JPM? temperature and maintain < 200oF. (Step 12)

SIM JPM b Do we provide a copy of EOP-SPI 3.2 to the applicant? Licensee - Yes SIM JPM c Do we provide a copy of SOI-M25/26 to the applicant? Licensee - Yes IP JPM i Do we provide a copy of ONI-D51, Attachment 3 to the Licensee - Yes. The basis for the TCOA will applicant? be provided.

Please provide the TCOA reference for this Time Critical Operator Action.

IP JPM j Do we provide a copy of SOI-P54 (WTR), Attachment 14 Licensee - Yes to the applicant?