ML22139A307
| ML22139A307 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 07/24/2019 |
| From: | Randy Baker NRC/RGN-III/DRS/OLB |
| To: | Exelon Generation Co |
| Baker R | |
| Shared Package | |
| ML19161A059 | List: |
| References | |
| Download: ML22139A307 (1) | |
Text
ES-301 Transient and Event Checklist Form ES-301-5 I
Facility: Q\\6~~ C,-\\-\\eS Date of Exam: 7lzs-u'=1 Operating Test No.: '2.Olq--;o 1 I A
E Scenarios p
V 1
2 3
4 T
M p
E L
N CREW CREW POSITION CREW POSITION CREW POSITION 0
I I
T POSITION T
N I
C s
A B
s A
B s
A B
s A
B A
M A
T R
T 0
R T
0 R
T 0
R T
0 L
u N
y 0
C p
0 C
p 0
C p
0 C
p M(*)
T p
E R
I u RO RX
- ),
\\
3-1
- 1 0
NOR l
\\
1 1
1 SRO-I
~
I/C
~,~,e
~3/4,
(.p 4
4 2
SRO-U MAJ 7
,s
")..
2 2
1 TS 1, 1-j 7,..
0 2
2 RO RX 1
1 0 NOR 1
1 1
SRO-I I/C 4
4 2
SRO-U MAJ 2
2 1
TS 0
2 2
RO RX 1
1 0 NOR 1
1 1 SRO-I I/C 4
4 2
SRO-U MAJ 2
2 1
TS 0
2 2
RO RX 1
1 0 NOR 1
1 1 SRO-I I/C 4
4 2
SRO-U MAJ 2
2 1
TS 0
2 2
Instructions:
- 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (1/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one 1/C malfunction can be credited toward the two 1/C malfunctions required for the ATC position.
- 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D.
(*) Reactivity and normal evolutions may be replaced with additional 1/C malfunctions on a one-for-one basis.
- 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.
- 4.
For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301, Page 26 of 33