Kairos Power, LLC - Transmittal of Reponses to NRC Questions 3.2-1, 3.2-3, 3.2-4, and 3.5-1 on Hermes Preliminary Safety Analysis Report
ML22069B098
Person / Time
Site: Hermes File:Kairos Power icon.png
Issue date: 03/10/2022
From: Hastings P
Kairos Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML22069A097 List:
References
KP-NRC-2203-004
Download: ML22069B098 (2)


Text

KP-NRC-2203- 004

March 10, 2022 Docket No. 50- 7513

US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Kairos Power LLC Transmittal of Reponses to NRC Questions 3.2 -1, 3.2-3, 3.2-4, and 3.5-1 on Hermes Preliminary Safety Analysis Report

References:

1. Email, Nuclear Regulatory Commission, Benjamin Beasley to Darrell Gardner, Additional NRC Questions for February 9 Public Meeting, February 9, 2022, ML22062B324

This letter transmits a response to NRC questions 3.2-1, 3.2-3, 3.2-4, and 3.5-1 provided in Reference 1 on the Kairos Power Hermes Test Reactor Preliminary Safety Analysis Report. Kairos Power requests NRC review of the response in support of continued review of the Hermes non-power test reactor construction permit application.

The response is provided in Enclosure 1.

If you have any questions or need any additional information, please contact Margaret Ellenson at ellenson@kairospower.com or at (510) 755-1861, or Darrell Gardner at gardner@kairospower.com or (704) 769-1226.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on March 10, 2022.

Peter Hastings, PE Vice President, Regulatory Affairs and Quality

Enclosures:

1) Kairos Power Response to NRC Questions 3.2-1, 3.2-3, 3.2-4, and 3.5-1

Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE, Unit A 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211

KP-NRC-2203- 004 Page 2

xc (w/enclosure):

William Kennedy, Acting Chief, NRR Advanced Reactor Licensing Branch Benjamin Beasley, Project Manager, NRR Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, Non-Power Production and Utilization Facility Licensing Branch