Kairos Power LLC, Submittal of Response to NRC Questions 2.5-1, 2.5-2, 2.5-3, and 2.5-4 for PSAR Section 2.5 on Hermes Construction Permit Application
ML22040A337
Person / Time
Site: Hermes File:Kairos Power icon.png
Issue date: 02/09/2022
From: Hastings P
Kairos Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML22040A336 List:
References
KP-NRC-2202-002
Download: ML22040A337 (2)


Text

KP-NRC-2202-002 February 9, 2022 Docket No. 50-7513 US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Kairos Power LLC Kairos Power Response to NRC Questions 2.5-1, 2.5-2, 2.5-3, and 2.5-4 for PSAR Section 2.5 on Hermes Construction Permit Application

References:

1. Email, Nuclear Regulatory Commission, Benjamin Beasley to Darrell Gardner, Preliminary questions on the Hermes PSAR, email #1, January 10, 2022 This letter provides a response to NRC questions 2.5-1, 2.5-2, 2.5-3, and 2.5-4 provided in Reference 1 on the Kairos Power Hermes Test Reactor Preliminary Safety Analysis Report Section 2.5, Geology, Seismology, and Geotechnical Engineering. Kairos Power requests NRC review of the response in support of continued review of the Hermes non-power test reactor construction permit application.

The response is provided as Enclosure 1 to this letter.

If you have any questions or need any additional information, please contact Marty Bryan at bryan@kairospower.com or at (704) 317-7278, or Darrell Gardner at gardner@kairospower.com or (704) 769-1226.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on February 9, 2022 Sincerely, Peter Hastings, PE Vice President, Regulatory Affairs and Quality

Enclosures:

1) Kairos Power Response to NRC Questions 2.5-1, 2.5-2, 2.5-3, and 2.5-4 Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE, Unit A 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211

KP-NRC-2202-002 Page 2 xc (w/enclosure):

William Kennedy, Acting Chief, NRR Advanced Reactor Licensing Branch Benjamin Beasley, Project Manager, NRR Advanced Reactor and Licensing Branch