LACBWR LTP Change Matrix Revision 2 Chapter Section Change Reason 1
1.6 Revised Section 1.6, Regulatory Notice of Changes, 5th, 7th and 8th bullets.
Changes made to address minor inconsistencies between Revision 0 to the LTP and the SER approving the LTP.
5 Figure 5-1 Revised Figure 5-1 Addresses an evaluation performed for the RPGPA excavation as documented in LC-FS-TSD-004, Rev. 0 Draft.
6 6.5.2 Revised Section 6.5.2 Revised to address an evaluation performed for the RPGPA excavation as documented in LC-FS-TSD-004, Revision 0 Draft.
6.23 Added LC-FS-TSD-004 to list of references To support change to 6.5.2.
LACBWR LTP Change Matrix Revision 3 Chapter Section Change Reason 1
1.3.1 Revised to reflect dismantlement and decommissioning activities have been completed; inserted use of past tense D&D activities have been completed. The LTP is updated to reflect the current status.
1.3.4 Added site to differentiate between the actual Reactor Building and the site in general.
The Reactor Building, along with most other buildings on site, has been removed.
1.3.7 Replaced Facility with site.
Facility connotates the entire site along with all buildings on site. Most buildings have been removed from site.
1.4 Revised to reflect dismantlement and decommissioning activities have been completed; inserted use of past tense D&D activities have been completed. The LTP is updated to reflect the current status.
1.5.3 Revised to reflect dismantlement and decommissioning activities have been completed; inserted use of past tense D&D activities have been completed. The LTP is updated to reflect the current status.
1.5.4 Revised to reflect dismantlement and decommissioning activities have been completed; inserted use of past tense D&D activities have been completed. The LTP is updated to reflect the current status.
1.5.5 Revised to reflect dismantlement and decommissioning activities have been completed; inserted use of past tense D&D activities have been completed. The LTP is updated to reflect the current status.
2 2
Revised to reflect dismantlement and decommissioning activities have been completed; inserted use of past tense D&D activities have been completed. The LTP is updated to reflect the current status.
2.4 Revised to reflect dismantlement and decommissioning activities have been completed; inserted use of past tense D&D activities have been completed. The LTP is updated to reflect the current status.
3 3.1 Section 3.1, is revised to reflect dismantlement and decommissioning activities have been completed.
Dismantlement and decommissioning activities have been completed. The LTP is updated to reflect the current status. Table 3-1 was updated to reflect status of systems as of November, 2021.
3.2.1 Added Solutions and its subcontractors have completed all decommissioning and demolition activities.
Added to provide updated status of the decommissioning project.
3.2.3 Added Demolition of the Reactor Building was completed on May 23, 2019.
Added to provide updated status of the decommissioning project.
3.2.4 Added Demolition of the Turbine Building was completed on February 28, 2018.
Added to provide updated status of the decommissioning project.
3.2.5 Added The WTB was demolished on August 11, 2017.
Added to provide updated status of the decommissioning project.
3.2.5 Added was loaded into appropriate containers Added for consistency and to better describe the waste loadout and transfer process.
3.3 Added Solutions expects the 10 CFR Part 50 license to be reduced to the area around the ISFSI during the first quarter of 2022. After the partial site release the site will be transferred back to Dairyland under the 10 CFR Part 50 license. It is expected that the ISFSI and surrounding environs will be decommissioned in the distant future.
Added to provide updated status of the decommissioning project.
3.3 Section 3.3, is revised to reflect dismantlement and decommissioning activities have been completed.
Dismantlement and decommissioning activities have been completed. The LTP is updated to reflect the current status. Decommissioning activities in this section were moved into Section 3.2 and updated to reflect completion.
3.4 Section 3.4, was updated to describe data presented in Tables 3-2 and 3-3. The tables were updated in Revision 3.
Dismantlement and decommissioning activities have been completed. The LTP is updated to reflect the current status.
3.4 Added All LACBWR site required environmental monitoring, other than for the LACBWR ISFSI, was terminated as of October 2019.
The termination of environmental monitoring followed completion of both the final status surveys field work and independent verification survey field work by ORAU of the radiologically restricted area.
Added to provide updated status of the decommissioning project.
3.4.2 Updated the actual and estimated doses and changed the estimated total dose from 13.22 to 10.97 person-rem.
Added to provide updated status of the decommissioning project.
3.4.4 Updated the low-level radioactive waste projections from 393,696 to 876,453 cubic feet.
Added to provide updated status of the decommissioning project.
Tables Tables 3-1 thru 3-4 were updated to reflect the current status or actual data as dismantlement and decommissioning activities have been completed.
Dismantlement and decommissioning activities have been completed. Tables in the LTP reflect the current status or actuals.
4 4
Revised to reflect dismantlement and decommissioning activities have been completed; inserted use of past tense D&D activities have been completed. The LTP is updated to reflect the current status.
4.1 Revised to reflect dismantlement and decommissioning activities have been completed; inserted use of past tense D&D activities have been completed. The LTP is updated to reflect the current status.
4.2 Revised to reflect dismantlement and decommissioning activities have been completed; inserted use of past tense D&D activities have been completed. The LTP is updated to reflect the current status.
4.3 Revised to reflect dismantlement and decommissioning activities have been completed; inserted use of past tense D&D activities have been completed. The LTP is updated to reflect the current status.
4.4 Revised to reflect dismantlement and decommissioning activities have been completed; inserted use of past tense D&D activities have been completed. The LTP is updated to reflect the current status.
4.4.1 Changed LACBWR to Solutions.
Changed to better describe the entity that did the actual work 5
5.0 Revised to reflect dismantlement and decommissioning activities have been completed; inserted use of past tense D&D activities have been completed. The LTP is updated to reflect the current status.
5.1 Revised to reflect dismantlement and decommissioning activities have been completed; inserted use of past tense D&D activities have been completed. The LTP is updated to reflect the current status.
6 6.3 Revised to reflect dismantlement and decommissioning activities have been completed; inserted use of past tense D&D activities have been completed. The LTP is updated to reflect the current status.
6.3 Deleted All other LACBWR buildings will be fully removed, including above and below grade portions.
The statement is redundant. A more accurate statement is made directly after this removed statement.
6.5.1 The calculation of the final compliance dose is to be documented in the partial site release request.
This change ensures any and all potential modifications to the release records are captured in the final calculation.
6.5.5 Revised to reflect dismantlement and decommissioning activities have been completed; inserted use of past tense D&D activities have been completed. The LTP is updated to reflect the current status.
6.10.1.1 Revised to reflect dismantlement and decommissioning activities have been completed; inserted use of past tense D&D activities have been completed. The LTP is updated to reflect the current status.
6.10.1.2 Revised to reflect dismantlement and decommissioning activities have been completed; inserted use of past tense D&D activities have been completed. The LTP is updated to reflect the current status.
6.22 Replaced final FSS Report for the site with partial site release request.
The partial site release request is a more suitable report to place the final compliance dose.
7 N/A 8
8.3 Replace entire section with Solutions and its subcontractors have completed all decommissioning and demolition activities, as of November 2021.
Added to provide updated status of the decommissioning project.