ML22025A188

From kanterella
Jump to navigation Jump to search
Biennial Submittal of Diablo Canyon Independent Spent Fuel Storage Installation Updated Final Safety Analysis Report
ML22025A188
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 12/15/2021
From: Zawalick M
Pacific Gas & Electric Co
To:
Document Control Desk, Division of Fuel Management
Shared Package
ML22025A179 List:
References
DIL-21-004
Download: ML22025A188 (2)


Text

Pacific Gas and Electric Company*

Maureen R. Zawalick Diablo Canyon Power Plant Vice President Mail code 104/6/608 Generation Business P.O. Box 56 and Technical Services Avila Beach, CA 93424 805.545.4242 Internal: 691.4242 PG&E Letter DIL-21-004 10 CFR 72.70 ATTN: Document Control Desk Director, Division of Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Materials License No. SNM-2511, Docket No. 72-26 Diablo Canyon Independent Spent Fuel Storage Installation Biennial Submittal of Diablo Canyon Independent Spent Fuel Storage Installation Updated Final Safety Analysis Report

Dear Commissioners and Staff:

Pursuant to 10 CFR 72.70, and in accordance with 10 CFR 72.4, Pacific Gas and Electric Company (PG&E) hereby submits the Diablo Canyon Independent Spent Fuel Storage Installation (ISFSI) Updated Final Safety Analysis Report (UFSAR),

Revision 9. Revision 9 incorporates changes to the Diablo Canyon ISFSI UFSAR from February 6, 2020, through December 1, 2021. There were no changes in this revision resulting from a license amendment or a 10 CFR 72.48 evaluation.

The Enclosure contains Diablo Canyon ISFSI UFSAR, Revision 9 which includes a list of revised pages in accordance with 10 CFR 72.70(c)(2).

PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.

If you have any questions regarding this submittal, please contact Mr. Jim Morris at (805) 305-9775.

This certifies that Revision 9 of the Diablo Canyon ISFSI UFSAR accurately presents changes made since the previous submittal.

December 15, 2021 Executed on ________________.

Sincerely, Maureen R. Zawalick A m em b e r o f t h e S TAR S A lli an ce C allaway

  • D i ab lo C an yo n
  • P alo Ve r de
  • Wo lf C r ee k

Document Control Desk PG&E Letter DIL-21-004 Page 2 Enclosure cc: Diablo Canyon Distribution cc/enc: William C. Allen, NMSS Project Manager Scott A. Morris, NRC Region IV Administrator Winston C. Smith, NRC Senior Resident Inspector A m em b e r o f t h e S TAR S A lli an ce C allaway

  • D i ab lo C an yo n
  • P alo Ve r de
  • Wo lf C r ee k