MONTHYEARML25052A1282025-02-21021 February 2025 Document Request for Watts Bar - Radiation Protection Inspection - Inspection Report 2025002 ML24352A0992024-12-16016 December 2024 Document Request for Hatch Nuclear Plant - Baseline Radiation Protection Inspection - Inspection Report 2025-01 ML23318A4492023-11-0909 November 2023 2023-004 NFS NCS Document Request ML23198A0422023-07-17017 July 2023 NFS OPS 2023-003 Document Request ML23082A0432023-03-23023 March 2023 002 Radiation Safety Baseline Inspection Information Request Final ML23018A1872023-01-17017 January 2023 2023 HNP CGD Inspection Information Request ML23018A1892023-01-17017 January 2023 Document Request for RP Inspection at Brunswick Inspection Report 2023-01 ML23026A2372022-11-16016 November 2022 2023001 Hatch RP RFI Final ML22255A0842022-09-0909 September 2022 Document Request for Sequoyah Nuclear Plant - Radiation Protection Inspection - Inspection Report 2022-04 ML22194A9422022-07-13013 July 2022 NRC 50.59 Inspection (IP 71111.17T) Information Request ML22175A0162022-06-24024 June 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22094A1672022-04-0101 April 2022 2022 St. Lucie POV Inspection Information Request ML22074A0932022-03-14014 March 2022 RP RFI March 2022 ML22056A3802022-02-25025 February 2022 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2022-02 ML22024A1122022-01-24024 January 2022 2022 CNS POV Inspection Information Request ML22020A1802022-01-20020 January 2022 Framatome 2022-001 OPS Document Request ML22010A0732022-01-0606 January 2022 50.59 Inspection Information Request ML22019A0412021-12-29029 December 2021 RFI ML21363A1692021-12-29029 December 2021 Inservice Inspection Request for Information ML21314A4202021-11-10010 November 2021 NRC Document Request - BWXT RP-ENV - 2021004 ML21267A1392021-09-23023 September 2021 Document Request for Upcoming RP Inspection at Watts Bar ML21253A1352021-09-0808 September 2021 Document Request for VC Summer Nuclear Station - Radiation Protection Inspection - Inspection Report 2021-04 ML21237A4952021-08-25025 August 2021 Document Request for Sequoyah Nuclear Plant - Radiation Protection Inspection - Inspection Report 2021-04 ML21236A2672021-08-20020 August 2021 Document Request for the Sept 13 NCS, Trans, and Env Inspection ML21179A3122021-06-28028 June 2021 Document Request for the July 26 Ncs/Trans Inspection ML21160A0352021-06-0303 June 2021 Document Request for Sequoyah Nuclear Plant - Radiation Protection Inspection - Inspection Report 2021-03 ML21112A0102021-04-22022 April 2021 2021-002 NFS NCS Document Request ML21160A0182021-04-19019 April 2021 Framatome - NCS 1 and Transportation Document Request 2021-002 ML21081A0432021-03-22022 March 2021 NRC Inspection Document Request - GNF-A (NCS1 & Trans - April 2021) ML20353A1312020-12-18018 December 2020 2021 Hbr 50.59 Info Request ML20253A2732020-09-0909 September 2020 Requalification Program Inspection Hatch Nuclear Station IR 05000395/20200102020-07-13013 July 2020 Notification of Virgil C. Summer Nuclear Station Design Bases Assurance Inspection U.S. Nuclear Regulatory Commission Inspection Report 05000395/2020010 ML20174A5812020-06-22022 June 2020 Notification of Inspection and Request for Information ML20149K3212020-05-27027 May 2020 RP Inspection Document Request, Browns Ferry 2020-003 ML20128J2392020-05-0707 May 2020 2020 Oconee RP Inspection Document Request Letter with Mail ML20134J1382020-05-0606 May 2020 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML20101L3132020-04-10010 April 2020 Notification of Inspection and Request for Information ML20052E4282020-02-21021 February 2020 Notification of NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000412/2020013 and 05000414/2020013) and Request for Information ML20017A1602020-01-17017 January 2020 E-mail Notification of Inspection and Request for Additional Information ML20021A0152020-01-17017 January 2020 Document Request - NRC Inspection at Urenco USA on February 24, 2020 ML20014E6552020-01-14014 January 2020 01 RP Inspection Document Request ML20028C7372019-12-0202 December 2019 Notification of Inspection and Request for Information ML19274C6472019-10-0101 October 2019 BWXT Nog Inspection Report Document Request 2019 005 ML19263A6542019-09-20020 September 2019 Westinghouse Plant Modifications Document Request 2019-004 ML19235A0992019-08-22022 August 2019 Emergency Preparedness Program Inspection Request for Information ML19193A1982019-07-12012 July 2019 Emailed St. Lucie Heat Sink RFI ML19162A2462019-06-11011 June 2019 RP Inspection Document Request 2019-03 ML19032A5842019-01-31031 January 2019 Emergency Preparedness Program Inspection Request for Information ML19016A3422019-01-10010 January 2019 U2 ISI 2019001 RFI - Bcc ML18225A0932018-08-13013 August 2018 Notification of Inspection and Request for Information 2025-02-21
[Table view]Some use of "" in your query was not closed by a matching "". |
Text
Information to be Provided in the NRC Box or On-site Following Entrance Meeting
- 1. Inspection Procedure 88020 - Operational Safety (initial focus areas will be ISA Summary Chapter 9D: Systems 460, 470, 480, 490, 540, 550, and 790.
Latest version of the Integrated Safety Analysis (ISA) Summary Latest version of the License Application document Copy of the governing procedure for the management of Items relied on for Safety (IROFS)
Copy of the governing procedures for the implementation of the following management measure, as applicable to IROFS:
- Training and Qualifications
- Procedures Development and Implementation
- Other QA Elements List of corrective action program documents generated since November 2021 related to issues with IROFS. Please include a brief description and the screening level of the issue, if applicable List of changes affecting IROFS implemented since November 2021 including modifications of existing controls, elimination of previous controls, and addition of new controls.
List of changes in the Operations Safety program organization that were subject to the position-specific requirements of the license List of temporary compensatory measures in place to support deficiencies in IROFS, including degraded/out-of-service equipment related to IROFS SOPs for operations of the systems identified above Schedule of any surveillances planned to support IROFS during the inspection week Information related to EN 55634 - Unplanned Treatment of a Contaminated Worker Documentation/actions (management measures) that demonstrate reliability of IROFS:
System 460 - Rod Loading:
- 104 (most recent operator training conducted - records)
- 4405 (hydraulic pump catch basin design documents)
- 4502 (ignition sources/combustible storage - since November 2021)
- 4503 (ignition sources/combustibles - since November 2021)
System 470 - Rod Testing:
- 104 (most recent operator training conducted - records)
- 4502 (ignition sources/combustible storage - since November 2021)
- 4503 (ignition sources/combustibles - since November 2021)
System 480 - Rod Transport and Storage:
- 104 (most recent operator training conducted - records)
- 4502 (ignition sources/combustible storage - since November 2021)
- 4503 (ignition sources/combustibles - since November 2021)
System 490 - Rod and Pellet Vault Downloading:
- 104 (most recent operator training conducted - records)
- 1410.10 (SBC design/configuration documents or method to verify size compliance)
- 1808.10 (latest scale calibration records)
- 3903 (design diagram verifying hood front panel size)
- 4502 (ignition sources/combustible storage - since November 2021)
- 4503 (ignition sources/combustibles - since November 2021)
System 540 - Bundle Assembly and Storage:
- 104 (most recent operator training conducted - records)
- 4502 (ignition sources/combustible storage - since November 2021)
- 4503 (ignition sources/combustibles - since November 2021)
- 5010/5011 (any documentation demonstrating checks/second-checks)
System 550 - Bundle Disassembly:
- 104 (most recent operator training conducted - records)
- 4502 (ignition sources/combustible storage - since November 2021)
- 4503 (ignition sources/combustibles - since November 2021)
System 790 - Laboratories:
- 103 (volume verification documentation for SBCs)
- 104 (most recent operator training conducted - records)
- 816 (most recent operator training conducted - records)
- 1410.10 (SBC design/configuration documents or method to verify size compliance)
- 4502 (ignition sources/combustible storage - since November 2021)
- 4503 (ignition sources/combustibles - since November 2021)
- 4602/4602.01 (current inventory to verify mass compliance)
- 4603/4903.01 (method to verify review and latest review documentation)
- 4613 (documentation of latest test/surveillance to verify availability)