ML22004A357

From kanterella
Jump to navigation Jump to search
Comment (28) of Josephine Niemann on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2
ML22004A357
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 12/31/2021
From: Niemann J
- No Known Affiliation
To:
Office of Administration
References
86FR62220 00028, NRC-2020-0277
Download: ML22004A357 (1)


Text

1/4/22, 3:08 PM blob:https://www.fdms.gov/2e2fab24-c851-4ab2-b032-2ed821284c3c SUNI Review Complete Template=ADM-013 As of: 1/4/22 3:06 PM E-RIDS=ADM-03 Received: December 31, 2021 PUBLIC SUBMISSION ADD: Phyllis Clark, Stacey Imboden, Mary Status: Pending_Post Tracking No. kxu-tikh-ni8o Neely Comment (28)

Comments Due: January 03, 2022 Publication Date: Submission Type: Web 11/9/2021 Citation: 86 FR 62220 Docket: NRC-2020-0277 Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 Comment On: NRC-2020-0277-0194 NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Units 1 and 2 Document: NRC-2020-0277-DRAFT-0224 Comment on FR Doc # 2021-24407 Submitter Information Name: Josephine Niemann Address:

Saint Louis, MO, 63125-2835 Email: josephinessnd@yahoo.com Phone: 3145440455 General Comment The license for the Point Beach Nuclear Plant should not be renewed. The plant would be in grave danger of disaster if it were continued to be operated. It is time to switch to sustainable energy. Nuclear energy can never be sustainable because it continuously produces radio active waste which can never by stored anywhere safely for as long as it exists. Wake up and be responsible!

blob:https://www.fdms.gov/2e2fab24-c851-4ab2-b032-2ed821284c3c 1/1