December 30, 2021 Mr. Bob Coffey Executive Vice President, Nuclear and Chief Nuclear Officer Florida Power & Light Company 700 Universe Blvd.

Mail Stop: EX/JB Juno Beach, FL 33408

SUBJECT:

TURKEY POINT NUCLEAR PLANT UNITS 3 AND 4 - EXEMPTION FROM SPECIFIC REQUIREMENTS OF 10 CFR PART 26, FITNESS FOR DUTY PROGRAMS (EPID L-2021-LLE-0058 [COVID-19])

Dear Mr. Coffey:

The U.S. Nuclear Regulatory Commission (NRC) has approved the requested exemption from specific requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 26, Fitness for Duty Programs, Section 26.205, Work hours, for Turkey Point Nuclear Plant, Units 3 and 4 (Turkey Point). This action is in response to Florida Power & Light Companys (FPL, the licensee) application, dated December 30, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21364A050). This application cited the March 28, 2020 (ADAMS Accession No. ML20087P237) and November 10, 2020 (ADAMS Accession No. ML20261H515), letters from Mr. Ho Nieh describing a process to request expedited review of certain exemptions from 10 CFR Part 26 during the Coronavirus Disease 2019 (COVID-19) public health emergency (PHE).

The application provided the following information:

A statement that explained how, and for which covered groups at Turkey Point, the COVID-19 PHE impacts the licensees ability to meet the work-hour control requirements of 10 CFR 26.205(d)(1)-(d)(7);

A statement that described how the licensee would use an exemption from the 10 CFR 26.205(d)(1)-(d)(7) work-hour control requirements to manage the impact of the COVID-19 PHE on maintaining plant operational safety and security at Turkey Point; A list of positions for which the licensee may implement alternative work-hour controls at Turkey Point upon the NRC granting the requested exemption; The date and time when the licensee will begin implementing site-specific COVID-19 PHE fatigue-management controls at Turkey Point for personnel specified in 10 CFR 26.4(a);

B. Coffey A statement that the licensees site-specific COVID-19 fatigue-management controls at Turkey Point are consistent with the constraints outlined in the November 10, 2020, letter; and A statement that the licensee will establish alternative controls at Turkey Point or the management of fatigue during the period of the exemption and that, at a minimum, the controls ensure the following for individuals subject to these alternative controls:

o Individuals will not work more than 16 work hours in any 24-hour period and not more than 86 work hours in any 7-day period, excluding shift turnover; o A minimum 10-hour break is provided between successive work periods; o 12-hour shifts are limited to not more than 14 consecutive days; o A minimum of 6 days off is provided in any 30-day period; and o Requirements have been established for behavioral observation and self-declaration during the period of the exemption.

Therefore, the NRC finds that the technical basis for an exemption, described in the March 28, 2020, letter from Mr. Ho Nieh, is applicable to the licensees application.

Furthermore, although not explicitly stated as part of the licensees application, the November 10, 2020, letter also states that the controls should ensure that the calculation of work hours and days off includes all work hours and days off during the applicable calculation periods, including those work hours and days off preceding initiation of the exemption period.

Section 26.9, Specific exemptions, of 10 CFR allows the NRC to grant exemptions from the requirements of 10 CFR Part 26, as it determines are authorized by law, will not endanger life or property or the common defense and security, and are otherwise in the public interest.

The NRC determined that the requested exemption is permissible under the Atomic Energy Act of 1954, as amended, and other regulatory requirements. Therefore, the NRC finds that the requested exemption is authorized by law.

The underlying purpose of 10 CFR 26.205(d) is to prevent impairment from fatigue due to duration, frequency, or sequencing of successive shifts. Based on the evaluation provided in the NRCs March 28 and November 10, 2020, letters, along with the criteria discussed above, no new accident precursors are created by using whatever licensee staff resources may be necessary or available during the term of this exemption to respond to a plant emergency and to ensure that the plant maintains a safe and secure status. Therefore, the probability of postulated accidents is not increased. Also, the consequences of postulated accidents are not increased because there is no change in the types of accidents previously evaluated. The requested exemption would allow the use of licensee staff resources as may be necessary to maintain safe operation of the plant and to respond to a plant emergency. Therefore, the NRC finds that the requested exemption will not endanger life or property.

B. Coffey The requested exemption would allow the use of licensee security staff resources as may be necessary to ensure the common defense and security. Therefore, the NRC finds that the requested exemption will not endanger the common defense and security.

Due to the impacts that the COVID-19 PHE has had on the licensees ability to comply with the work-hour controls of 10 CFR 26.205(d), the importance of maintaining the operations of Turkey Point, and the controls the licensee has established, the NRC finds that the requested exemption is in the public interest.

Granting the requested exemption from the requirements of 10 CFR 26.205 is categorically excluded under 10 CFR 51.22(c)(25), and there are no extraordinary circumstances present that would preclude reliance on this exclusion. The NRC staff determined, per 10 CFR 51.22(c)(25)(vi)(I), that the requirements from which the exemption is sought involve other requirements of an administrative, managerial, or organizational nature.

The NRC staff also determined that approval of this exemption involves no significant hazards consideration because it does not authorize any physical changes to the facility or any of its safety systems, does not authorize changes to any of the assumptions or limits used in the licensees safety analyses, and does not introduce any new failure modes. There is no significant change in the types or significant increase in the amounts of any effluents that may be released offsite because this exemption does not affect any effluent release limits as provided in the licensees technical specifications or by the regulations in 10 CFR Part 20, Standards for Protection Against Radiation. There is no significant increase in individual or cumulative public or occupational radiation exposure because this exemption does not affect the limits on the release of any radioactive material or the limits provided in 10 CFR Part 20 for radiation exposure to workers or members of the public. There is no significant construction impact because this exemption does not involve any changes to a construction permit. There is no significant increase in the potential for or consequences from radiological accidents because the exemption does not alter any of the assumptions or limits in the licensees safety analysis.

In addition, the NRC staff determined that there would be no significant impacts to biota, water resources, historic properties, cultural resources, or socioeconomic conditions in the region.

Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the approval of this exemption request.

Based on the above, the NRC finds that (1) the exemption is authorized by law, (2) the exemption will not endanger life or property or the common defense and security, and (3) the exemption is otherwise in the public interest.

B. Coffey This exemption is effective from December 31, 2021, through February 28, 2022.

Sincerely, Digitally signed by Caroline L. Caroline L. Carusone Date: 2021.12.30 Carusone 16:58:18 -05'00' Caroline L. Carusone, Deputy Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251 cc: Listserv

ML21364A052 *via concurrence with model safety evaluation OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NSIR/DPCP/RSB/BC* NMSS/REFS/ERLRB/BC*

NAME LHaeg RButler ABowers RElliott DATE 121/30/2021 12/30/2021 3/30/2020 3/31/2020 CE NRR/DRO/IOLB/BC(A) OGC - NLO NRR/DORL/LPL2-2/BC(A) NRR/DORL/DD NAME BLitkett MASpencer EBrown CCarusone DATE 12/30/2021 12/30/2021 12/30/2021 12/30/2021