ML21361A016
| ML21361A016 | |
| Person / Time | |
|---|---|
| Site: | 07200071 |
| Issue date: | 12/22/2021 |
| From: | Offerle M DTE Electric Company |
| To: | Tilda Liu Office of Nuclear Material Safety and Safeguards |
| T LIU NRC/NMSS/DFM/STLB 4049974730 | |
| Shared Package | |
| ML21361A014 | List: |
| References | |
| EPID L-2021-LLE-0037 | |
| Download: ML21361A016 (2) | |
Text
From:
Margaret M Offerle To:
Liu, Tilda
Subject:
[External_Sender] Response to question Date:
Wednesday, December 22, 2021 3:26:01 PM Tilda
Per our conversation,
The guidance for gathering the input and compiling the Annual Radiological Environmental Operating Report and the Annual Radioactive Effluent Release Report (ARERR) are contained in a department work instruction, WI-RE-018. This instruction contains the list of data to obtain and compile for input to the annual reports. Most of the data input for the Annual Radioactive Effluent Report is obtained through the following procedures:
The Radiological Effluents Routine Surveillances procedure obtains effluents from the following:
Reactor Building Radwaste Building Turbine Building Division 1 SGTS Division 2 SGTS Onsite Storage Facility Spent Fuel Pool Exhaust Ground Water
Storm, rain and drinking water sampling is performed per procedure 62.000.300, Storm Water, Rain Water and Drinking Water Sampling.
Off gas sampling is performed per procedure 67.000.503, Offgas Vent Piping Sampling.