ML21348A391

From kanterella
Jump to navigation Jump to search
Submittal of Annual Financial Report
ML21348A391
Person / Time
Site: Beaver Valley, Davis Besse, Perry
Issue date: 12/14/2021
From: Benyak D
Energy Harbor Nuclear Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML21348A390 List:
References
L-21-041
Download: ML21348A391 (2)


Text

Withhold from Public Disclosure Under 10 CFR 2.390(a)(4) energy harbor Darin M. Benyak Senior Vice President, Fleet Nuclear Operations December 14, 2021 L-21-041 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Beaver Valley Power Station, Unit Nos. 1 and 2 Docket No. 50-334, License No. DPR-66 Docket No. 50-412, License No. NPF-73 Davis-Besse Nuclear Power Station, Unit No. 1 Docket No. 50-346, License No. NPF-3 Perry Nuclear Power Plant, Unit No. 1 Docket No. 50-440, License No. NPF-58 Annual Financial Report Energy Harbor Nuclear Corp.

168 E. Market Street Akron, Ohio 44308 330-436-1380 10 CFR 50.71 In accordance with 10 CFR 50.71(b), each licensee shall submit upon issuance its annual financial report, including the certified financial statements, to the Commission unless the licensee submits a Form 10-Q with the Security and Exchange Commission or a Form 1 with the Federal Energy Regulatory Commission. Energy Harbor Corp., the parent company of Energy Harbor Nuclear Generation LLC (owner of the nuclear plants) and Energy Harbor Nuclear Corp. (operator of the nuclear plants), has not submitted either of these forms to the aforementioned commissions.

Because Energy Harbor Corp. has not issued an annual financial report of the kind typically provided pursuant to 10 CFR 50.71 (b), preliminary financial information for the fiscal period ending December 31, 2020 is being provided to satisfy the requirements of 1 0 CFR 50.71 (b). Due to ongoing legal proceedings, an external auditor is unable to certify the financial results; therefore, the results are considered to be preliminary.

Energy Harbor Nuclear Corp. hereby submits the annual financial report in the form of preliminary Unaudited Condensed Consolidated Financial Statements.

Enclosure A to this letter is an affidavit prepared in accordance with 10 CFR 2.390 requesting that the confidential commercial and financial information provided in Enclosure B be withheld from public disclosure.

Enclosure B contains information to be withheld from public disclosure under 10 CFR 2.390(a)(4). Upon removal of Enclosure B, this letter is uncontrolled.

Beaver Valley Power Station, Unit Nos. 1 and 2 Davis-Besse Nuclear Power Station, Unit No. 1 Perry Nuclear Power Plant, Unit No. 1 L-21-041 Page 2 Enclosure B contains the annual financial report for period ending December 31, 2020, in the form of Energy Harbor Corp. Unaudited Condensed Consolidated Financial Statements.

There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Phil H. Lashley, Manager -

Fleet Licensing, at (330) 696-7208.

~ L Darin M. Ben~

Enclosures:

A.

Affidavit Pursuant to 10 CFR 2.390 B.

Energy Harbor Corp. Unaudited Condensed Consolidated Financial Statements cc:

NRC Region I Administrator NRC Region Ill Administrator NRC Resident Inspector (BVPS)

NRC Resident Inspector (DBNPS)

NRC Resident Inspector (PNPP)

NRC Project Manager (Energy Harbor Nuclear Corp. Fleet)

Director BRP/DEP Site BRP/DEP Representative Utility Radiological Safety Board Enclosure B contains information to be withheld from public disclosure under 10 CFR 2.390(a)(4). Upon removal of Enclosure B, this letter is uncontrolled.