ML21326A146

From kanterella
Jump to navigation Jump to search
ES-301-1 and ES-301-2_Initial
ML21326A146
Person / Time
Site: Fermi 
Issue date: 06/16/2021
From: Joseph Demarshall
NRC/RGN-III/DRS/OLB
To:
DTE Electric Company
Demarshall J
Shared Package
ML20055D845 List:
References
Download: ML21326A146 (2)


Text

ES-301 Administrative Topics Outline Form ES-301-1 Facility:

Fermi 2 Date of Examination:

5/24/2021 Examination Level: RO SRO Operating Test Number:

2021-301 Administrative Topic (see Note)

Type Code*

Describe activity to be performed Conduct of Operations D, R Perform Torus Water Average Temperature Calculation

[K/A 2.1.45] 4.3 802-3006-401 Conduct of Operations N, R Determine Time to 200°F and Time to Boil

[K/A 2.1.25] 3.9 New JPM Equipment Control M, R Perform 24.138.06, Jet Pump Operability Test - Two Loop

[K/A 2.2.12] 3.7 802-4101-101 Radiation Control N/A Emergency Plan D, S Perform Actions as Emergency Communicator Following Declaration of a General Emergency

[K/A 2.4.39] 3.9 831-0001-406 NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).

  • Type Codes and Criteria:

(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs and RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1, randomly selected)

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:

Fermi 2 Date of Examination:

5/24/2021 Exam Level: RO SRO-I SRO-U Operating Test Number:

2021-301 Control Room Systems:* 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title Type Code*

Safety Function

a. Start Reactor Recirculation Pump at Power - Alternate Path.

[K/A 202001 A4.01] 3.7 / 3.7 New JPM A, N, S SF-1

b. Maintain Reactor Water Inventory Using RWCU Blowdown Operation.

[K/A 204000 A4.08] 3.4 / 3.4 New JPM L, N, S SF-2

c. Failure of both RPV Pressure Regulators - Alternate Path.

[K/A 241000 A4.02] 4.1 / 4.1 315-0129-202 A, D, E, S SF-3

d. Manually Initiate Core Spray - Alternate Path.

[K/A 209001 A4.03] 3.7 / 3.6 315-0140-408 A, D, E, EN, L, S SF-4

e. Vent the Torus Irrespective of Offsite Release Rates - Alternate Path.

[K/A 295024 EA1.19] 3.3 / 3.4 802-3106-008 A, E, L, M, S SF-5

f.

Start and Parallel a Diesel Generator From the Control Room.

[K/A 264000 A4.04] 3.7 / 3.7 315-0165-001 EN, M, S SF-6

g. Confirmed Fire Resulting in Equipment Control Issues From the Control Room (Hot Shorts/Open Circuits).

[K/A 295016 AA1.07] 4.2 / 4.3 315-0299-203 E, M, S SF-7

h. Restore RB HVAC to operation following Automatic Isolation.

[K/A 288000 A4.01] 3.1 / 2.9 315-0166-002 M, S SF-9 In-Plant Systems:* 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U

i.

Defeat of RCIC Low RPV Pressure Isolation.

[K/A 295031 EA1.05] 4.3 / 4.3 802-3006-301 D, E, L, R SF-2

j.

Startup of RPS MG Set

[K/A 212000 A1.01] 2.8 / 2.9 714-0000-003 D, R SF-7

k. Startup of RBCCW Supplemental Cooling Water Loops.

[K/A 400000 A1.02] 2.8 / 2.8 315-0167-003 D, R SF-8 All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power/Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6/4-6 /2-3 9/ 8/ 4 1/ 1/ 1 1/ 1/ 1 (control room system) 1/ 1/ 1 2/ 2/ 1 3/ 3/ 2 (randomly selected) 1/ 1/ 1