Orano Federal Services, LLC - Brr Package Amendment Request, Docket No. 71-9341
ML21313A229
Person / Time
Site: 07109341
Issue date: 11/08/2021
From: Noss P
Orano Federal Services
To: Nishka Devaser
Document Control Desk, Office of Nuclear Material Safety and Safeguards
Shared Package
ML21313A227 List:
References
FS-21-0122
Download: ML21313A229 (3)


Text

November 8, 2021 FS-21-0122 U. S. Nuclear Regulatory Commission ATTN: Nishka Devaser Federal Way Office USA Document Control Desk 505 S. 336th Street Director, Division of Fuel Management Suite 400 Federal Way, WA 98003 Office of Nuclear Material Safety and Safeguards Tel: (253) 552-1310

@orano_USA 11555 Rockville Pike One White Flint North Rockville, MD 20852

SUBJECT:

BRR Package Amendment Request, Docket No. 71-9341

Dear Mr. Devaser:

Orano Federal Services LLC (Orano FS) hereby submits Revision 17 of the Safety Analysis Report (SAR) for the BRR Package, Docket No. 71-9341. The purpose of this amendment is to add two payload types to the list of approved contents.

The new payloads are in two categories: one, a small number of commercial high burnup fuel rods, and two, irradiated metal from reactor decommissioning. Both payload types are in support of materials research.

The revised SAR includes structural, thermal, shielding, and criticality evaluations for the new payloads. All changes are marked with a revision bar in the right margin. There are no changes to any SAR drawings, except the addition of a new canister as shown on sheet 1 and sheet 5 of drawing 1910 03-SAR. The BRR package complies with all of the applicable requirements of 10 CFR 71.

To assist you in evaluating the revised SAR, a change summary is included below. In order to coordinate with the casks user schedules, we request that the certificate of compliance be issued no later than September 30, 2022.

Should you have any questions regarding this submittal, please contact me at (233) 552-1321 or via email (phil.noss@orano.group ).

Yours Truly, Philip Noss NOSS Digitally signed by NOSS Philip Philip Date: 2021.11.08 15:38:21 -08'00' Licensing Manager Orano Federal Services LLC Page 1 of 3

November 8, 2021 FS-21-0122 Chapter or Change Summary Section (all changes marked with a change bar)

Federal Way Office USA Chapter 1 Add description of new payloads and new canister. No changes 505 S. 336th Street Suite 400 to existing approved payloads or to package design.

Federal Way, WA 98003 Tel: (253) 552-1310 Section 1.2.2.5 Corrected typo in third paragraph, where U3O2 should be U3Si2.

@orano_USA Section 1.3.1 Update ANSI N14.5 to 2014.

SAR drawing Include new canister. Added materials and notes to sheet 1, 1910-01-03-SAR, added sheet 5. No changes to any existing approved baskets or Rev. 7 to any other SAR drawings.

Sections 2.1.1, Add new canister to discussion.

2.1.2, and 2.1.2.1 Table 2.1-2 and Update tables for new canister and payload.

Table 2.1-3 Section 2.3.2 Add new canister to discussion.

Section 2.6.1.1 Include temperature of new canister payload.

Section 2.6.1.2 Include discussion of differential thermal expansion.

Section 2.7.1.5.3 Discuss stress analysis of new canister.

Section 3.1.2 Include decay heat of new payloads.

Section 3.1.3 Include justifications why no explicit evaluation of temperature with new payloads is needed.

Section 3.1.4 Correct typo: Reference to Section 3.6.4 should be Section 3.6.1.4.

Section 4.5.1 Update ANSI N14.5 to 2014.

Section 5.0 Include discussion of new payloads.

Section 5.5 Add references.

Section 5.7 Add shielding evaluation for the irradiated fuel rod payload.

Section 5.8 Add shielding evaluation for the irradiated metal payload.

Section 6.0 Include discussion of new payloads.

Section 6.9.1 Add references.

Section 6.10 Add criticality evaluation for the irradiated fuel rod payload.

Section 7.1.2 Include instructions for loading the new payloads.

Section 7.2.2 Include instructions for removing the new payloads.

Section 8.1.2 Include discussion of new canister.

Section 8.3.1 Update ANSI N14.5 to 2014.

Page 2 of 3

November 8, 2021 FS-21-0122 Copies (email):

Nishka Devaser, U.S. NRC Federal Way Office USA Collin Knight, NSUF Post-Irradiation Examination Project Manager 505 S. 336th Street Suite 400 Donald Darrington, INL P&T Program Manager Federal Way, WA 98003 Tel: (253) 552-1310 Tom Criddle, Project Manager, Orano Federal Services LLC

@orano_USA Page 3 of 3