Office of Nuclear Material Safety and Safeguards

COVID-19 Public Health Emergency Oversight Activities Assessment

COVID-19 Public Health Emergency Oversight Activities Assessment

- Phase B Report -

Table of Contents

I. Approach............................................................................................................................... 4 II. Purpose................................................................................................................................. 4 III. Phase B Feedback Mechanisms........................................................................................... 5 IV. Nuclear Materials and Waste Safety Programs Oversight Activ ities..................................... 6 V. Summary of the Implementation of the Oversight Programs Duri ng the COVID-19 PHE..... 6 VI. Nuclear Material Users Business Line................................................................................... 7 VII. Fuel Facilities Business Line............................................................................................. 188 VIII. Decommissioning and Low-Level Waste Business Line................................................... 333 IX. Spent Fuel and Transportation Business Line................................................................. 3737 X. Common Best Practices and Challenges and Additional Recommen dations................... 390 XI. Summary of Recommendations........................................................................................ 433 XII. Conclusion......................................................................................................................... 445 Appendix A - Survey Questions................................................................................................ 466 Appendix B - Interview Questions............................................................................................. 500

Page l 3

Table of Figures

Figure 1: NMU - Announcing Inspections During Normal Implementa tion............................... 133 Figure 2: NMU - When to Utilize Remote Inspections................................................................ 14 Figure 3: NMU - Effectiveness of Remote Inspections............................................................. 155 Figure 4: FFBL - Effectiveness of Remote vs. Onsite Inspections............................................ 233 Figure 5: FFBL - Effectiveness of Remote Verification of Equipm ent & Facility Condition....... 233 Figure 6: FFBL - Use of Remote Inspections Under Normal Conditi ons.................................. 244 Figure 7: FFBL - Effectiveness of Dividing Inspections into Pie ces to be Completed at Different Times........................................................................................................................................ 255 Figure 8: FFBL - Effectiveness of NRC File Sharing Capabilities During Remote Inspections... 27 Figure 9: FFBL - Effectiveness of Rescheduling Inspections...................................................... 28 Figure 10: FFBL - Effectiveness of Remote Entrance/Exit Meeting s.......................................... 29 Figure 11: FFBL - Inspection Activities That Can Be Performed R emotely................................ 29 Figure 12: DLLW - Effectiveness of Remote vs. Onsite Inspection s........................................ 344 Figure 13: DLLW - Effectiveness of Remote Observation of Licens ee Activities........................ 35 Figure 14: DLLW - Effectiveness of Dividing Inspections into Pi eces to be Completed at Different Times............................................................................................................................ 36 Page l 4

COVID-19 Public Health Emergency Oversight Activities Assessment - Phase B

I. Approach

The Office of Nuclear Material Safety and Safeguards (NMSS) has taken a phased approach for its Coronavirus Disease of 2019 (COVID-19) Public Health Emerge ncy (PHE) Oversight Activities Assessment effort. Phase A of this effort consisted of a short-term evaluation of feedback received through a survey of U.S. Nuclear Regulatory C ommission (NRC) staff with responsibility for implementing the oversight programs in the N uclear Materials and Waste Safety Programs, and through numerous engagements discussing im plementation of the oversight programs among the leadership team and staff. The Ph ase A report is available in the Agencywide Documents Access Managem ent System (ADAMS) with Accession Number ML21158A231.

Phase B is a more comprehensive evaluation by a working group w ith specialized inspection and programmatic experience and representation from each of the NMSS business lines (BLs) and regional offices. The ultimate objective is to provide rec ommendations on potential enhancements to the inspection programs based on what has been experienced and learned during the COVID-19 PHE so that we can continue to effectively implement the oversight programs and position them for success in the future.

II. Purpose

This report documents the results of Phase B of NMSS COVID-19 Public Health Emergency Oversight Activities Assessment. The Phase B charter objectives were as follows:

To evaluate the various practices, adjustments, processes, and inspection techniques utilized to implement the nuclear materials and waste oversight programs du ring the COVID-19 PHE and develop recommendations to:

  • Enhance the implementation of these programs during the current, ongoing COVID-19 PHE
  • Ensure inspection programs are adequately prepared for future P HEs
  • Utilize experiences during COVID-19 to enhance any aspects of t he current framework for the oversight programs (e.g., inspection planning practices, gu idance, communications) to ensure we continue to implement comprehensive, consistent, resilient, and modern oversight programs into the future.

Page l 5

More specifically, the working group was tasked to:

  • Design and deploy various feedback mechanisms (e.g., interviews, surveys) that will build upon the feedback received during Phase A of this effort to ass ist in their evaluation. The feedback sources should be diverse, including input from all re gions, and programs, various staff grade levels, the different roles in the oversight progra ms, and expertise, and include external stakeholders feedback (e.g., licensees, public) to in clude Agreement States.
  • Gather and document the various practices, processes, inspectio n techniques, communications, and adjustments implemented by each program (Nu clear Materials Users, Spent Fuel, and Transportation, Fuel Cycle Facilities, Uranium Recovery and Decommissioning) during the COVID-19 PHE and assess their effec tiveness, efficiency, and consistency. This includes evaluating virtual or remote inspec tion practices and techniques.
  • Identify what inspection areas in each program are most suitabl e for remote inspection from this point forward.
  • Determine what modifications made to the program during COVID s hould be adopted to further evolve these programs to be more current, modern, flexi ble, robust, and consistent across BLs.
  • Document any additional best practices and challenges from the implementation of the oversight programs encountered during the COVID-19 PHE.

III. Phase B Feedback Mechanisms

Phase B implemented a variety of feedback mechanisms that built upon those utilized in Phase A. The following were utilized to obtain internal and ex ternal feedback.

  • Surveys - The initial step in the assessment was to create a su rvey that expanded on the information that was implemented during Phase A of the assessme nt. The survey consisted of 16 questions and was distributed to NMSS and regional inspec tors and supporting personnel. The survey was open for responses from May 6, 2021, to June 2, 2021.

Reponses were received from 53 NMSS and regional representative s. Survey questions are included in Appendix A of this report.

  • Interviews - Based on the input gleaned from the survey results, a series of interview questions were developed to gain a more in-depth understanding of the responses received in the survey and to obtain the necessary information to fulfil l the objectives for this effort.

Separate surveys were developed for inspectors, branch chiefs, division directors, and regional administrators. Interviews were conducted between Jul y 1, 2021 and August 4, 2021. Interviews were conducted with 51 inspectors, eight branch chiefs, nine division directors, and six office/regional administrators. In terview questions for each group are include in Appendix B of this report.

  • Public meetings - To gather input from the regulated community, industry groups, Agreement States, members of the public, and other interested e xternal stakeholders, two public meetings were held. The first public meeting occurred o n July 26, 2021, and the second on August 3, 2021. A summary of these public meetings i s available at ADAMS Page l 6

Accession No. ML21277A349. In summary, external stakeholders ( 1) were appreciative of the communication and coordination efforts by the staff to cond uct inspections during the pandemic, (2) regarded the use of electronic reading rooms, rem ote exit meetings, and virtual interviews as very effective and expressed the view tha t they should continue to be leveraged, and (3) were very appreciate of the flexibility and responsiveness of the staff during the pandemic.

  • Government-to-government meetings - The working group held a Go vernment-to-Government Meeting on November 8, 2021, to obtain feedback from the Agreement States on the working groups effort and recommendations. In addition, staff updated States on this effort at the monthly calls held with the Organization of Agreement States (OAS) and the Conference of Radiation Control Program Directors (CRCPD).

IV. Nuclear Materials and Waste Safety Programs Oversight Activities

The oversight activities in the Nuclear Materials and Waste Saf ety Programs include programmatic oversight and inspection activities of decommissio ning facilities, uranium recovery activities, low-level waste facilities, fuel cycle facilities, spent fuel storage and transportation activities, and academic, industrial, and medical uses of nucle ar materials. The vast majority of inspection activities are conducted out of the four NRC regiona l offices, except for the spent fuel storage and transportation cask vendor inspections that are con ducted by a group of inspectors in headquarters. The Division of Fuel Management is responsibl e for the programmatic oversight for activities under the Fuel Facilities Business Lin e and the Spent Fuel and Transportation Business Line. The Division of Materials Safety, Security, State, and Tribal Programs is responsible for the programmatic oversight for acti vities in the Nuclear Materials Users Business Line, including the Agreement States. The Divis ion of Decommissioning, Uranium Recovery, and Waste Programs is responsible for the pro grammatic oversight for activities under the Decommissioning and Low-Level Waste Busine ss Line.

V. Summary of the Implementation of the Oversight Programs During the COVID-19 PHE

On January 31, 2020, the U.S. Department of Health and Human Se rvices declared a PHE for the United States to aid the nations healthcare community in r esponding to COVID-19. On March 11, 2020, the COVID-19 outbreak was characterized as a pa ndemic by the World Health Organization. On March 20, 2020, the U.S. NRC required mandato ry telework for all non-mission critical functions. In the subsequent months, each ove rsight program implemented by NMSS and the four regions adjuste d its inspection programs as n ecessary to continue to exercise its oversight responsibilities given the new challenge s presented by the PHE. Many adjustments to inspection schedules had to be made based upon t he health and safety of the staff with a focus on maintaining reasonable assurance of adequ ate protection. Although many inspections were initially postponed at the time mandatory tele work was in effect, the NRC was always prepared to undertake mission critical inspections, such as reactive inspections, to ensure public health and safety. In the subsequent weeks, the inspections were evaluated on a case-by-case basis by taking into consideration such factors as the necessary mode(s) of travel, travel restrictions, or limitations in place at the time, perso nal health concerns of available inspection personnel, and the local site conditions, and govern ment mandates associated with the COVID-19 PHE.

Subsequently, on June 1, 2020, NMSS issued "Inspection Guidance During Transition from COVID-19 Mandatory Telework for the Nuclear Materials and Waste Safety Program (ADAMS Page l 7

Accession No. ML20143A281) and provided decision-making conside rations for the conduct of inspections as the agency transitioned from mandatory telework to maximum flexibilities telework. To date, staff has conducted fully remote inspection s, full onsite inspections, and hybrid inspections (with remote and focused onsite portions) to fulfill its important oversight mission.

Many licensed facilities continued operations and implemented p reventive measures to minimize exposure and spread of the virus by reducing staffing onsite, mandating mask wearing, performing COVID testing, and implementing flexible st affing measures to reduce person-to-person contact. Therefore, coordination with license es was critical to ensure inspections could be conducted successfully, having staff avail able to support inspections, and being aware of the preventive measures at sites.

Communications were key in ensuring openness, transparency, and consistency while adjusting the oversight activities to the COVID-19 PHE. NMSS and the reg ional offices held periodic town hall meetings with staff among all regions and headquarters. T hese meetings served as an avenue to disseminate best practices and challenges in implemen ting inspection programs during the COVID-19 PHE.

Most recently, on February 2021, NMSS provided additional guida nce and clarification to the business line (BL) and regional management regarding the COVID-19 PHE to ensure consistency in decision-making and documentation regarding adju stments to inspections schedules, determining the manner for conducting inspections (e.g., remote vs. onsite), and reporting adjustments in inspections to appropriate headquarter s BL managers.

VI. Nuclear Material Users Business Line

The Nuclear Materials Users (NMU) BL is managed and implemented by NMSS in conjunction with Region I, Region III, and Region IV. The NMU are also reg ulated by 39 Agreement States, all of whom continued to implement their Radiation Control Prog rams with similar adjustments to their respective inspection programs during the COVID-19 PHE. The NMU encompass a wide variety of medical, industrial, commercial, and academic instit utions who also implemented varying responses, or adjustments to their operations in respon se to the COVID-19 PHE.

In response to the COVID-19 PHE, materials inspectors and licen se reviewers adjusted the inspection program to accommodate new practices and flexibiliti es to protect staff safety and the safety of the public against COVID-19, while also balancing the need to conduct effective oversight as part of the agency critical safety mission. Throu ghout the PHE, the staff evaluated inspections on a case-by-case basis to determine if inspections should be conducted onsite, performed remotely, deferred, or a combination thereof. The fo llowing outlines the inspection practices used in the NMU BL during the PHE.

Page l 8

A. Practices and Processes

1. Announcing Inspections Inspection activities during the PHE were announced and coordin ated with the licensee in advance for both onsite inspections and remote or h ybrid inspections in almost all cases. Inspections in the NMU BL are usually unanno unced, so this represented a change in current practice that was appropriate t o ensure the wellness and safety of the inspectors and licensee personnel. This coor dination aspect is even more critical when planning to conduct an inspection partially, or completely remotely, as the licensee and staff need to ensure document sharing platforms are accessible and the licensee has enough time to upload requested informatio n. Many licensee staff were also working remotely or on limited in-person schedu les necessitating early coordination even when it was determined that an inspection cou ld be safely performed onsite.
2. Onsite Inspections The decision to perform onsite inspection activities was determ ined based on the local COVID-19 conditions at the work site, the risk profile of the licensee, and regulated activities, the willingness of the individual inspect or to travel, and consideration of the travel methods required to reach the licen see.
3. Remote Inspections In fully remote inspections, all aspects of the IP were complet ed through remote processes including phone and video call interviews, virtual fa cility tours, and offsite reviews of documentation. Remote inspections always required i nspections be announced as the licensee needed to be prepared and be supporti ve of this method of inspection.
4. Hybrid Inspections Hybrid inspections are inspections performed with a combination of remote and onsite inspections techniques. The majority of the NMU BL inspections are completed by a single inspector within a single workday when performed at the licensees facility. As such, hybrid inspections were not extensively utilized within t he NMU BL during the COVID-19 PHE. Hybrid inspections were utilized in certain circ umstances including the evaluation of large programs that would require multiple da ys of inspection and/or multiple inspectors to complete. In these circumstances inspec tors would generally complete the portions of the inspection that were amenable to r emote review prior to completing the onsite portion of the inspection to reduce the t otal amount of time onsite.

B. Inspection Techniques

Inspection techniques for onsite inspections remained generally unchanged during the PHE, except for additional upfront coordination made with the l icensee when announcing the inspection. This upfront coordination allowed inspectors t o discuss the current state of the licensees program prior to arriving onsite allowing for better tailoring of inspection preparation, but also resulted in the loss of the surprise natu re of the otherwise unannounced inspection and granted greater control of the timin g of the inspection schedule to the licensee.

Remote inspection techniques did require more distinct adjustme nts as inspectors were required to develop detailed requests for information, coordina te scheduling of remote Page l 9

interviews, coordinate sharing of licensee information includin g sensitive documentation, and adapt to the technological capabilities of the licensee bei ng inspected. It was widely reported in interviews for this assessment that the process for remote inspection often stretched to a multi-week timeframe when an onsite inspection c ould have been completed in a single workday due to the challenges associated with licensee availability, response turnaround, and technological challenges. Inspectors noted in interviews for this assessment that scanning and uploading file s and scheduling interviews with licensee staff were common challenges resulting in the protracted inspection schedule. Inspectors did not report that they were spending significantly more work hours performing direct inspection as a result of the se changes, but that remote inspections were subject to frequents starts, and stops. Additional review of the number of direct inspection hours charged to licensees by progr am area will be required to evaluate the resource impact of remote inspections over time.

C. Adjustments

Inspectors were often required to adjust their inspection proce sses and efforts as they adapted to the rapidly evolving PHE. Materials inspectors are advantaged in that the inspection program already provides scheduling flexibility to a djust inspection dates during the routine implementation of the program. Prior to the PHE, scheduling inspections was not necessarily tied to specific activities occ urring at the licensee site.

Rather, they were scheduled close to their due date taking into consideration the flexibilities afforded by the scheduling window. Therefore, th e postponement of inspections during the COVID-19 PHE when determined a remote in spection was not feasible for a specific licensee, was not a major deviation fro m the normal practice.

D. Communications Between Regional Offices, NMSS, and Agreement States

Communication efforts between the regional offices and NMSS wer e generally effective, but in the rapidly changing environment inspectors and manageme nt reported that a more efficient system for sharing information was needed. Insp ectors and management were asked to report redundant information, sometimes to as man y as six, or more different requesting groups, regarding the status of their insp ection program. This ad-hoc process for requesting information was reported to be in efficient throughout the PHE. Therefore, in the event of a future major disruptive even t to agency operations, such as a PHE, an inspection status communication tool that enc ompasses all business lines and is accessible to all staff should be developed. For this reason, the working group recommends the development of guidance in Inspection Manu al Chapter (IMC) 2800 on implementing inspection programs during PHEs that addre ss roles and responsibilities, communication expectations, and a streamlined process to communicate inspection information to the program office.

On June 1, 2020, NMSS issued "Inspection Guidance During Transi tion from COVID-19 Mandatory Telework for the Nuclear Materials and Waste Safety P rogram (ADAMS Accession No. ML20143A281) and provided decision-making conside rations for the conduct of inspections during the PHE. Feedback was received t hat this guidance did meet the intended purpose, but that the issuance was not timely, causing confusion, and inconsistencies in decision-making at the start of the PHE. Al so, in February 2021, NMSS provided expectations to ensure consistency in decision-ma king and documentation related to implementation of the inspection progr ams. These guidance documents continue to be used during the COVID-19 PHE and shoul d be retained and Page l 10

readjusted as needed for use in future major disruptive events to ensure timely resumption of oversight activities. Therefore, the working gro up recommends that the above-mentioned temporary inspection guidance be captured in th e development of the recommended inspection guidance in IMC 2800 related to PHEs.

E. Agreement States

The NRC currently shares the respon sibility of implementing the National Materials Program inspection program with 39 Agreement States. NMSS is r esponsible for establishing and maintaining effective communications and worki ng relationships between the NRC and Agreement States. Upon the start of the PH E and mandatory telework posture back in March 2020, the agency had continuous communications, and coordination with Agreement States to ensure the orderly implem entation of the National Materials Program. The agency utilized the various outreach an d communication mechanisms that were in place prior to start of the PHE to leve rage the effective exchange of information during the COVID-19 PHE. These include monthly calls with the OAS and the CRCPD, State and Tribal Communications and Radi ation Control Program Directors Letters, the National Materials Champions Ch at, routine communications through the Regional State Agreement Officers in Region I, III, and IV, government-to-government meetings, and annual conferences.

Based on initial feedback from Agreement States, NMSS in coordi nation with the regions, developed frequently asked questions (FAQs) for the Ag reement States, which included guidance concerning licensing, inspections, and the im plementation of the Integrated Materials Performance Evaluation Program (IMPEP). T hese FAQs were updated as needed as time operating under the PHE extended. NM SS also shared the June 1, 2020, memorandum providing decision-making consideratio ns to support inspection activities with the Agreement States. In June 2020, the National Materials Program (NMP) Champions hosted a chat about Response by the NM P community to the COVID-19 Public Health Emergency, and in December 2020 ano ther chat was hosted that was specific to inspections, Virtual Inspections D uring the Public Health Emergency. These forums continue to be a valuable communicati on tool in which the NRC and the Agreement States representatives exchange experienc es and information relevant to each others programs.

A portion of NMSS oversight responsibilities includes the impl ementation of the IMPEP to periodically evaluate the adequacy of the NRCs radiation co ntrol program and the adequacy and compatibility of Agreement States radiation contr ol programs. During the PHE, NMSS also modified the implementation of IMPEP in a manner similar to the modifications adopted in the implementation of the inspection p rograms. IMPEP reviews scheduled from March 2020 onward were either postponed, conduct ed remotely/virtually, hybrid, or onsite. Additional guidance was developed to ensure radiation control programs are reviewed consistently under IMPE P in areas that could be impacted by the COVID-19 PHE. As a result, NMSS issued in Octo ber 2020, Temporary Instruction (TI)-003, Evaluating the Impacts of the COVID-19 P ublic Health Emergency as Part of the Integrated Materials Performance Evaluation Prog ram (IMPEP), to ensure that IMPEP teams recognize and consistently evaluate the potent ial wide-ranging impacts of the COVID-19 PHE on program performance until these impacts on the NMP are no longer seen during IMPEP reviews.

Page l 11

Lastly, the working group held a government-to-government meeti ng on November 8, 2021, to share the feedback received during this ev aluation, provide an opportunity to the Agreement States to provide us feedback on t he recommendations, and have discussions on the flex ibilities Agreement States envision to adopt from this point forward. The working group shared the draft working grou p report with its proposed recommendations to support this engagement. Some Stat e representatives shared similar experiences in implementing the inspection progr ams during the COVID-19 PHE and none expressed any objections or comments on t he proposed recommendations.

F. Assessment of effectiveness, efficiency, and consistency

Regional offices were granted significant flexibility to develo p their own, region-specific, processes and procedures for implementing the June 1, 2020 guid ance for the transition to the COVID-19 PHE. With few established checks in place, thi s flexibility resulted in inconsistencies between regions when deciding when inspections should be conducted remotely instead of onsite, and when crediting inspections and determining the frequency of the next routine inspection.

1. Decision-Making for Onsite vs. Remote Inspections Region II and Region III developed centralized Transition Revie w Panels that evaluated local COVID-19 conditions at the proposed work locati on applicable to all the BLs in the region. While Region II does not implement work of NMU BL, it is notable that Region II, and Region III differed in how the pane ls were utilized.

Specifically, in Region II the onus was on the individual inspe ctor to collect data inputs on the COVID-19 situation at the local job site, whereas Region III would utilize the panel to both assess, and evaluate the local COVID-19 condition s. Inspectors noted in interviews that the process of collecting data and submittin g a written one-page assessment of local conditions was time intensive, confusing, a nd led to differences in how inspectors prepared their inputs.

Region I and Region IV used variations of the transition panel that included inter-management discussions, but more heavily relied on inspector ev aluation of the COVID-19 conditions in conjunction with their direct management. Region IV evaluated both local COVID-19 conditions and options for comple ting an inspection and documented those decisions. Staff were critical in intervi ews that sufficient guidance was not in place to consistently develop these COVID-r elated considerations, and it was unclear to staff how these COVID-19 travel assessments were reviewed by management. In Region I the divisional branch chiefs would meet weekly to discuss upcoming inspections with respect to COVID-19 conditions. The branch chiefs would evaluate state and local conditions, federa l data reports, and input from inspectors in making their decisions.

The regional offices communicated to inspectors that COVID-19 f actors were intended to be one piece of the overall assessment as to whethe r an inspection should be performed onsite or remotely, and that other licensee, and inspection-specific risk factors would also be considered. Staff from all regions reported uncertainty in the consistency used in the process to evaluate COVID-19 risk factors within their regional office. Furthermore, it was reported tha t although the risk profile associated with the regulated activity was provided together wi th the COVID-19 information for the specific inspection under consideration, th e site COVID-19 conditions information was viewed by the staff as the primary d etermining factor for Page l 12

approving or disapproving travel. Objective assessment of risk has historically been particularly challenging to quantify in the NMU BL and the regi ons would have benefited from developing cross-regional criteria that would cl arify for management the situations and risk factors that should inform when to perf orm an inspection onsite, when to delay an onsite inspection, and when to perform an inspection remotely.

It should be noted that COVID-19 risk is not uniform across the regional offices and there are many unique geographic factors that must inform the a ssessment of COVID-19 risk for each office including required travel methods to reach the inspection sites and local COVID-19 case conditions and vaccina tion rates. Due to these and other factors, not all the COVID-19 assessment proces ses could be standardized across the agency but standardizing some of the pr ocess would have resulted in a more uniform implementation of the nuclear materi als oversight program across the regional offices. Specifically, the regions would h ave benefited from a consistency review to ensure that assessments were using consis tent COVID-19 information sources, were setting uniform assessment input expe ctations for staff, and that the decision-making process for onsite vs. remote insp ections is generally consistent in the application of COVID-19 and inspection-specif ic risk factors.

Inspectors did report feeling that their personal risk toleranc e for the COVID-19 PHE was respected, and no inspectors reported feeling pressured to perform onsite inspections during the PHE when they were not comfortable doing so which was highly appreciated in the feedback received.

2. Inspection Crediting Regional offices were also identified through interviews as usi ng differing criteria for determining what inspection aspects could be credited during re mote inspection and for setting the next inspection frequency. Specifically, Regio n I was identified as starting inspections remotely but was more likely than other re gions to conduct an onsite portion of the inspection to occur before the inspection could be credited as complete. Region I did not adjust the inspection frequency for inspections completed fully or partially remotely. Region III inspectors generally f avored full remote inspections over hybrid inspections as an inspection would be p erformed fully onsite in most cases if an inspector were to travel there in-person. Region III did not adjust the inspection frequency for inspection completed fully or part ially remotely. Region IV also conducted most routine inspections fully remotely but w ould reduce the interval for the next scheduled routine inspection under certai n circumstances mainly due to the fact that a remote inspection did not always allow t he inspector to perform independent radiation measurements or observe activities in pro gress at the licensees facility or at temporary job sites.

It should be noted that the feedback received from interviews w as provided by inspectors with direct experience within their own regional off ice only and further evaluation should be performed to determine the extent to which and under what conditions the regions truly differed from each other in the im plementation of the materials oversight inspection program as it was not evident fr om the feedback received. These reported discrepancies between regions will ne ed to be addressed to ensure the NRC consistently applies the materials oversight program during a future PHE and under normal circumstances should these flexibil ities be adopted broadly.

Page l 13

G. Evaluation of remote inspection techniques and inspection practices

1. Unannounced vs. Announced Inspections Nuclear materials inspectors were interviewed regarding their e xperiences transitioning to announced inspections in advance of both onsit e and remote/hybrid inspections. Specifically, inspectors were asked to provide th eir thoughts on the impact of announcing materials inspections. During the PHE the staff generally agreed that announcing inspections was necessary for continued effective oversight and implementation of the inspection program during the PHE, an d the practice should be continued if another sim ilarly disruptive event was to occur in the future.

As shown in Figure 1, the majority of the 24 NMU inspection sta ff who responded to these survey questions (58 percent) held an overall negative vi ew of continuing announcing inspections during the routine implementation of the inspection program.

Negative responses included concerns that announced inspections impede the ability of the inspector to review the program in its routine state and that licensees may take short term actions to prepare for the inspection that may hinde r inspectors ability to assess licensee performance. Addi tionally, some staff were concerned with the loss of scheduling flexibility that t hey currently have with unannounced inspections. When inspection delays occur due to identification of complex issues that require additional time to resolve, it can be difficult to reschedule a planned in spection for later in the week if the licensee has already prepared staff schedules and a ctivities to support the announced inspection. Although respondents may have provided a mix of both positive and negative feedback regarding announced inspections, 58 percent of respondents felt that the overall best option is to continue th e normal operations practice of not announcing inspections as we exit the PHE condi tions.

NMU Responses: Announcing inspections in the normal implementation of the program

2 8

14

Neutral/Mixed Overall Negative Overall Positive

Figure 1: NMU - Announcing Inspections During Normal Implementation

Overall positive feedback was provided by 8 percent of the staf f who felt that the benefits of announcing inspections were significant enough that the practice should be continued following the transition back to normal inspection activities. Advance coordination allowed for the licensees to have the right people onsite at the time of inspection and the inspector could be certain that they could s ee the activities they were most interested in observing when the inspection was sched uled in advance.

Those providing positive feedback also noted that they do not b elieve that programmatic issues with a licensee are easily covered up, and violations often stem Page l 14

from misunderstandings of requirements that are less likely to be caught by the licensee just because the inspection is announced. Staff inclu ded in this smaller data set may have provided both positive and negative feedback regar ding announced inspections but felt that the overall best option is to announc e inspections during normal operations for most NMU program areas.

The remaining 33 percent of staff provided mixed or neutral fee dback regarding the use of announced inspections going forward, with some offering that strategic use may be appropriate. It was noted multiple times that licensees that perform work at temporary job sites are better candidates for unannounced inspe ctions, but licensees that are known to work irregular hours such as certain medical clinics that are known to only perform licensed activities intermittently may be good candidates for advance coordination. Two individuals also noted both potential positi ves and negatives as outlined above, but do not feel that there is enough data to ex trapolate to normal operations as most announced inspections they performed were al so conducted remotely during the PHE.

2. Remote and Hybrid Inspections - Effectiveness and Efficiency The NMU staff were surveyed on their experiences during the COV ID-19 PHE and with the associated use of remote inspections. The survey was open for responses from May 6, 2021 through June 2, 2021, and 23 responses were re ceived specifically from staff associated with NMU BL. Direct interviews with NMU staff and management at all levels were conducted between July 1, 2021 an d August 4, 2021.

Survey and interview results with NMU staff indicated broad sup port for utilization of remote inspections during the PHE, or in the event of future di sruptions that limit the ability of the agency to have staff travel to remote licensee f acilities. Feedback from staff in the survey results indicated that opinion is divided o n the utilization of remote inspections in general as part of the routine implementation of the materials inspection program. When asked if remote inspection served as a good tool to replace onsite inspections only during periods of travel restri ctions, 61percent of staff responded positively, 13 percent neutrally, and 26 percent nega tively. When then surveyed to identify if inspection staff could see themselves c onducting more inspections fully or partially remotely if given the opportunit y during the normal implementation of the inspection program 35 percent of staff ag reed, 23 percent of staff were neutral, and 43 percent of staff disagreed (see Figu re 2).

NMU Responses: When to Utilize Remote Inspections

Use Remote Inspections during PHE Only

Use Remote Inspections During Normal Operations

0 5 10 15 20 25

Agree/Strongly Agree Neutral Disagree/Strongly Disagree

Figure 2: NMU - When to Utilize Remote Inspections Page l 15

Staff were also surveyed to provide insights into the effective ness of remote inspection when broken down into the inspection key components with results shown in Figure 3. Staff found remote review of licensee documents t o be generally effective with 57 percent of staff agreeing and 30 percent of staff disag reeing when surveyed.

Remote licensee meetings such as entrance and exit meetings wer e also found to be effective with 52 percent of staff agreeing and 17 percent of s taff disagreeing. The staff also identified that observation of licensee activities a nd verification of licensee equipment and facility condition were very challenging to effec tively perform in a remote environment with 70 percent and 74 percent of staff disa greeing respectively.

The staff provided nearly evenly mixed results on the effective ness of performing remote interviews with licensee staff, with inspectors providin g additional context to there being concerns about loss of body language signals when u sing remote interview methods as well as concerns about Radiation Safety Of ficer involvement in the interview process. The staff also provided mixed results r egarding event follow-up, with 44 percent of staff providing a neutral response. Fur ther discussions with staff during the interview process provided additional context that the range of potential materials events to respond to is quite broad and som e situations may be more suitable for remote follow-up, particularly if the event, and licensee response is already well understood. Generally, support for remote follow-up trended more negatively when observation of lic ensee activities or verification of licensee equipment or facility condition were required as part of the event follow -up response.

NMU Responses: Effectiveness of Use of Remote Inspections

Remote Document Reviews

Remote Licensee Meetings

Verification of Equipment/Facility Condition

Observation of Licensee Activities

Interviews with Licensee Staff

Event Follow-up

0 5 10 15 20 25

Agree/Strongly Agree Neutral Disagree/Strongly Disagree

Figure 3: NMU - Effectiveness of Remote Inspections

NMU oversight staff were interviewed to provide additional, det ailed clarity regarding their views on the use of remote inspection throughout the PHE and if they believe such flexibilities should be maintained as the agency transitio ns back to normal operations. In line with the survey responses, NMU inspectors interviewed found the use of remote inspections as part of the routine implementation of the nuclear materials oversight program to be less effective in general tha n the use of onsite inspection. The general feedback received from NMU inspection staff found the use Page l 16

of remote inspections was more conducive to a compliance-based inspection rather than to a performance-based inspection. To further the point, after interviewing 27 NMU staff members, no inspectors provided feedback that they be lieved remote inspections should be routinely conducted during normal operati ons.

While the staff were adamantly clear that remote inspections sh ould not be used in the majority of NMU inspections, 19 staff members, or 70 percen t of those interviewed indicated that there were certain circumstances where the use o f remote inspections could enhance organizational effectiveness and only two individ uals interviewed expressed that remote inspecti ons should never be used once the agency returns to normal operations. These results indicate that there is a viab le place for the use of remote inspections within the NMU oversight program on a case-b y-case basis to enhance organizational effectiveness following the return to no rmal operations.

Management, including branch chiefs, division directors, regional administrators, and office directors were interviewed to request their views on the implementation of the oversight programs during the COVID-19 PHE with respect to use of remote and hybrid inspections and what practices should or should not be c ontinued as we return to normal operations. The working group interviewed eight bran ch chiefs, not all of whom are associated with the NMU BL. Five of the eight respond ents expressed a desire to maintain some flexibility for remote and hybrid inspe ctions in certain circumstances and one branch chief expressed support to use rem ote or hybrid inspections as a supplemental tool for certain issues such as e valuation of well understood corrective actions. The branch chiefs further expan ded that they believe that the decision to perform a remote or hybrid inspection shou ld be made at the branch chief level and that risk factors should be applied to t he decision-making process. The remaining two branch chiefs did not address remot e or hybrid inspections in their responses and instead focused on separate topics. No branch chiefs expressed the view that remote, or hybrid inspections sh ould never be utilized as part of the routine inspection program during normal operati ons.

The working group interviewed eight division directors. Consis tent with the branch chief responses, five respondents expressed a desire to maintai n some flexibility for remote/hybrid inspections in certain circumstances. Division d irectors specifically mentioned the use of remote document reviews, applying risk fac tors in the decision-making process, and decision-making at the branch chief, and in spector level. One division director supported continued flexibility to use remote and hybrid inspections for inspections with the caveat that a defined strategy be deve loped to determine areas where use of these flexibilities is most appropriate.

The working group interviewed six Regional Administrators and/o r Office Directors. In their responses three respondents expressed a desire to return to performing mostly onsite inspections and three expressed support for continued us e of hybrid inspections and remote document reviews as appropriate. One re spondent also felt that they could not make a broad statement either way on the is sue of continued use of remote inspections as the individual details of each specifi c case vary greatly and must be considered on their own specific merits.

Based on the feedback received, the working group recommends th at during normal operations, the majority of routine inspection activities retur n to being performed through direct onsite inspection. However, on a case-by-case b asis, if an inspector believes that organizational efficiencies can be obtained by pe rforming certain inspection activities remotely while maintaining its effectiven ess, the inspector should Page l 17

have the option to utilize remote inspection techniques when de emed appropriate by the inspector or inspection team and their management. The ins pector must consider licensee performance and specific inspection activity risk to s upport the decision to perform the inspection activities (or portion of one) remotely. Further discussion of areas that may be appropriate candidates for remote inspection are outlined in the following section.

With regard to the use of remote or hybrid inspections during P HEs, based on the feedback received the working group recommends continuing lever aging the remote inspection techniques currently afforded to implement inspectio n programs while ensuring inspection staff have access to adequate personal prot ective equipment (PPE) and technology tools to cond uct inspection activities saf ely and most effectively.

H. Modifications that should be adopted

1. Announcing Materials Inspections The IMC 2800 currently requires that materials inspections be p erformed on an unannounced basis except for initial inspections for a new lice nsee, initial security inspections, inspections requiring considerable travel to remot e locations including certain U.S. Territories and States, and for inspection of Mast er Materials Licenses.

An inspector may also announce an inspection at a temporary job site or at a rig located in offshore waters if it is not possible to perform an unannounced inspection at the location of interest or if transportation to the site canno t be arranged without the assistance of the licensee.

Based on feedback from the staff, there is interest in continui ng the practice of announcing inspections on a case-by-case basis under certain ci rcumstances where announcing the inspection may result in increased organizationa l effectiveness.

Specifically, staff indicated that inspections of licensees tha t only perform licensed activities on an infrequent basis, such as small medical clinic s that only operate one day per week, may be appropriate to announce in advance to ensu re that inspection of these facilities occur when activities are ongoing and appro priate staff are onsite to interact with the inspector. The working group recommends that the IMC 2800 working group currently working on Phase 3 of revisions to mate rials inspection guidance consider incorporating the increased flexibility of an nouncing inspections under certain limited circumstances if not already addressed in IMC 2800.

2. Remote and Hybrid Inspection The current March 2, 2020, version of IMC 2800, allows the use of remote inspections for routine alternate locations of use of low safety significan ce, as the primary inspection method for Priority 5R licensees, and as appropriate for non-routine inspections related to follow-up for escalated enforcement, ban krupt, abandoned, or revoked licensees, and the option to do remote exit meetings. The IMC 2800 currently does not address the use remote or hybrid inspections for routine inspections for licensees other than 5R. Based on the feedback provided, the working group recommends that the majority of routine inspectio n activities return to being performed through direct onsite inspection, but remote in spection, or hybrid inspection flexibilities be permitted on a case-by-case basis a nd under the consideration of risk, licensee performance factors, and in coo rdination with

Page l 18

management. If it is determined that this recommendation shoul d be implemented, the IMC 2800 working group should consider options for incorpor ating guidance for the utilization of these flexibilities either by revision of IM C 2800 or through the development of a supplemental appendix.

3. Evaluation and Continued Review The utilization of remote and hybrid inspections throughout the PHE does not represent a complete data set as most NMU licensees that were inspected through remote methods have not yet made it through their inspection cy cle for the following onsite inspection. With the data that we have at this time it is very challenging to qualitatively or quantitatively evaluate the impact that use of remote and hybrid inspections has had with respect to evaluating licensee perform ance. As remotely inspected licensees complete their inspection cycle and are rei nspected over the next 1-4 years the agency should continue to assess this practice to determine if there are any indications of declining licensee performance compared to l icensees that were not subject to remote inspections. This could include reviews to identify if there is a change to the frequency of findings overall or an increased rat e of violations that rise to the level of escalated enforcement attributable to licensees inspected remotely

compared to licensees that were not subject to remote inspectio n. The agency should also perform annual consistency reviews evaluating the u se of announced onsite inspections and remote or hybrid inspections that are ut ilized following the return to normal operations.

While NMSS modified the Web-Bas ed Licensing System (WBL) to ind icate whether the inspection was remote versus onsite, or announced versus un announced during the PHE, NMSS does not currently have a tool for tracking hybri d inspection techniques in WBL. Should the materials inspection program ado pt these flexibilities in the normal/routine implementation of inspections or continue to use them broadly during the current and future PHEs, the agency should implement a way to track the extent to which these flexibilities are being used to be able t o evaluate their impact on the program in the future. Therefore, the working group recomm ends updates be made to the WBL inspection module to ensure inspectors can indi cate if an inspection was performed announced, unannounced, onsite, remotely, or thro ugh hybrid methods. WBL should also be modified to allow the inspector to populate the basis of the decision to conduct a remote, hybrid, or announced inspecti on.

VII. Fuel Facilities Business Line

The Fuel Facilities BL (FFBL) is managed by NMSS and the inspec tion program is implemented by the Division of Fuel Facility Inspection (DFFI) in Region II. The fuel cycle facilities inspected by DFFI are large facilities with hundreds to thousands of empl oyees working onsite during normal operations. During the PHE, fuel facilities were consid ered essential, and remained in operation. Although most fuel cycle facilities maximized the n umber of their employees who worked remotely (e.g., licensee engineers would typically work remotely when not directly supporting activities onsite, licensing staff were sometimes en tirely remote). However, some fuel cycle facilities handle classified information, and were n ot able to engage in remote work.

Two of these facilities have an NRC resident inspector assigned.

Page l 19

A. Inspections Practices:

In response to the COVID PHE, DFFI performed several different types of remote, and hybrid inspections at the fuel cycle facilities they inspec t. These were:

  • Fully Remote:

In fully remote inspections, the inspectors attempted to comple te all aspects of the IP solely through document reviews, phone/video call interviews, and providing questions to the licensee. Some BLs used pictures and video as part of their remote inspections during the PHE. DFFI did not use pictures o r video due to concerns about Freedom of Information Act (FOIA) and sharing pr oprietary or sensitive information. For example, if an inspector reviewed p ictures or a video walkdown as part of a remote inspection and used that as part o f a basis for identifying or dispositioning a violation, it was unclear if th ose pictures, or videos would need to be included in an inspection report or documented in ADAMS.

  • Onsite Inspection:

In onsite inspections during the COVID PHE the DFFI inspectors would travel to the site when they were comfortable traveling and when site and travel conditions allowed for onsite inspection. The conditions considered inclu ded number and rate of infections at the site and in the local area, the avail ability of PPE, and access to hotels and food. For transportation, driving alone w as strongly preferred to reduce close contact with others.

  • Hybrid Inspection, with Onsite Performed Afterwards:

This type of inspection was perfo rmed extensively by DFFI early in the PHE because of travel restrictions and site conditions that prevent ed onsite inspection together with the uncertainty around when or if those restricti ons would be lifted.

In this type of inspection, a remote inspection was first perfo rmed covering one or more IPs and/or portions of an IP. The IPs were not performed completely, instead only selected portions that had been preidentified as s uitable to remote inspection were performed. If necessary, this list of areas fo r remote inspection was reduced if the inspection area was later determined not sui table to be performed remotely. Later, when conditions permitted, an inspe ctor, or inspectors would conduct an onsite inspection with the scope of the inspec tion reduced to those areas not previously completed remotely. Notably, the on site follow-up inspection was often performed many months later and by a diffe rent inspector.

  • Hybrid Inspection, with Onsite Performed Concurrently:

In this type of inspection, an inspector would complete some po rtions of the inspection remotely at the same time other inspectors conducted an onsite inspection. Typically, only one inspector would be remote, wit h one, or two onsite.

This allowed the onsite inspectors to follow-up with onsite ins pection of issues raised during the remote inspection in real time.

  • Resident Inspections:

Prior to the COVID-19 PHE, resident inspectors at Category I fu el cycle facilities were required to be onsite for 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br /> per pay period. When t he PHE was declared, this was changed to one day per week onsite, consiste nt with reactor Page l 20

resident inspectors. Shortly thereafter, requirements for resi dent inspectors at Category I fuel cycle facilities to be onsite increased to two days per week in recognition of the fact that fuel cycle facilities only have on e resident at the site, unlike reactors which have a minimum of two resident inspectors.

B. Processes:

  • Transition Readiness Group (TRG) Approval Needed for Onsite Inspection:

Region II implemented a process of requiring all inspector trav el to be approved by a TRG. The TRG was composed of branch chiefs and division d irectors from across all BLs in Region II (i.e., Operating Reactors, New Reac tors, Fuel Facilities, and License Examiners). To request authorization f or travel for onsite inspections, the inspectors were required to prepare a TRG form documenting the site conditions, local area conditions, safety precautions, hos pital availability, and other required information. Additionally, resident inspectors were required to prepare TRG forms to justify them going onsite on a weekly basi s. The TRG would discuss these forms during a weekly TRG meeting, often wi th the presence of the inspector to facilitate discussions. Both, the form and the criteria for acceptable travel changed over the course of the PHE. Eventual ly the TRG was discontinued in early 2021.

C. Inspection Techniques:

  • Inspection Planning:

A key aspect to enable a successful remote inspection is carefu l planning before the inspection. The scope of the planned inspection must be ca refully considered, as not all areas of an IP can be effectively conducted remotely. Furthermore, because licensees are engaged in different activities and have different capabilities, an area of an IP that can be successfully complet ed at one licensee remotely may not be appropriate at another. Additionally, the area(s) of the facility selected as the inspection sample(s) (or focus area(s)) must be carefully considered since for example, safety controls might be successf ully inspected remotely when the sample involves engineered controls on one pr ocess while it may not be successfully inspected remotely on an adjacent proce ss that relies upon administrative controls.

For hybrid inspections where the onsite follow-up occurred late r, inspection planning for the onsite follow-up portion required close coordi nation with the licensee. The inspector typically performs onsite follow-up fo r multiple inspection modules, so walkdowns needed to be coordinated with multiple li censee groups to ensure that they took place at different times. The onsite ins pector also needed to coordinate with the remote inspectors to understand what had be en inspected remotely, what needed to be inspected onsite, and how many hour s for each IP had already been utilized for the remote portion of the inspect ion.

  • BOX and Licensee e-Rooms:

During the PHE the fuel cycle facilities increased their use of document sharing platforms. These included the NRC hosted BOX application, as w ell as several different licensee-hosted platforms (referred to as e-Rooms), t hat NRC staff could be granted access to by the licensees. In general, these platf orms allowed NRC staff access to licensee documents in the form of.docx,.pdf,.xlsx,.jpg, etc. files Page l 21

that the licensees would post. These platforms enable more eff ective document review as a part of inspection preparation and remote inspectio n techniques.

D. Communications:

Communication with licensees was essential to successfully impl ement the fuel facilities inspection program while protecting the inspection a nd licensee staff from COVID-19 exposure. Routine communications between Region II, N MSS, and the licensees took place during the COVID-19 PHE to help coordinate inspections, exemption requests, and other NRC actions. Communication tools used included:

Routine calls between fuel cycle facilities and NMSS and Region II staff responsible for licensing and inspections. To support inspections, detaile d document requests describing documents the NRC inspectors wanted to have access v ia eRoom or onsite to conduct inspection activities. Inspectors also commu nicated with the licensee about COVID conditions at the site to determine when o nsite inspection could be most favorable.

Interviewees also supported the importance of communication, fo cusing on communication within the NRC. One interviewee said, Early on we identified the need for enhanced communications with the program office and our counterparts in the regions to be able to benchmark what other programs are doing. DFM and DFFI BCs have routine communications to discuss issues, biweekly status meetings [that]

we didnt have prior to PHE to align initiatives and priorities, ensured enhanced communications between PMs, and PIs...

The following lists guidance issued during the COVID-19 PHE app licable to the fuel cycle inspection program.

  • On April 17, 2020, NMSS issued Implementation of Resident Insp ector Coverage at Category I Fuel Facilities during Covid-19 to provide guida nce on resident inspector office coverage at Category I fuel facilities during maximum teleworking for COVID-19 (ADAMS Accession No. ML20106F226).
  • On June 1, 2020, NMSS issued Inspection Guidance During Transi tion from COVID-19 Mandatory Telework for the Nuclear Materials and Waste Safety Programs (ADAMS Accession No. ML20143A281).
  • On February 2021, NMSS provided clarified BL expectations to en sure consistency in decision-making and documentation related to imp lementation of the inspection programs.
  • On April 8, 2021, Region II provided COVID-19 reoccupancy guida nce which described the phased reoccupancy guidance that Region II issued in accordance with the NRC COVID-19 reoccupancy Plan. This guidance applied to the resident inspectors at fuel cycle facilities.
  • In August of 2021, the agency provided consistent guidance on t he use of project-based telework by resident inspectors across all regions, which applies to resident inspectors at fuel cycle facilities.

Page l 22

E. Adjustments:

  • Delaying Inspections:

One of the most common adjustment s that was made during the COVID-19 PHE was to delay inspections until conditions permitted onsite insp ection. In some cases, licensees asked NMSS for a license amendment to allow th em to delay certain activities that DFFI would otherwise inspect (e.g., NRC observed emergency exercises). However, in most cases the delayed inspe ction was still completed within the calendar year. Where it was not, a deviat ion memo to NMSS was used to document what was not completed and any recomm ended path forward.

  • Delaying the Exit:

Another adjustment was to delay the exit meeting, particularly for remote inspections, allowing the licensee, and inspectors more time to conduct the inspection. This helped by giving the licensee more time to fi nd and transmit documents, answer questions, and arrange meetings, and intervie ws. Notably, this did not affect the number of direct inspection hours the i nspector spent on the inspection since the inspector would pause inspecting when need ed to give the licensee more time to respond to the inspectors requests.

  • Remote Exit/Entrance Meetings:

In addition to doing virtual entrance and exit meetings for rem ote inspections, for many onsite inspections the entrance and/or exit meetings were conducted remotely to enable social distancing (e.g., using MS Teams).

F. Assessment of effectiveness, efficiency, and consistency

1. Differences among regions / Headquarters (HQ)

Because only Region II conducts fuel cycle inspections, there w ere no differences between regions in the conduct of these inspections. The fuel facility BL is unique among the NMSS BLs in that it has two facilities with an assign ed resident inspector at the facility. These facilities also deal with a large amoun t of classified information.

Also as mentioned above, while some BLs used pictures and video as part of their remote inspection, DFFI did not use pictures or video due to FO IA concerns and sharing proprietary or sensitive information.

2. Evaluation of virtual/remote inspection practices and techniques
  • Fully Remote:

It was not generally possible to complete most fuel cycle IPs f ully remotely, but some portions of most IPs could be completed remotely. This re sulted in DFFI conducting many hybrid inspections when onsite inspection could not initially be performed, with onsite portions being conducted later. Inspect ions with emphasis on observing licensee activities and performing walkdowns could not be completed remotely. Likewise, inspections at facilities with s trict information security controls due to handling a large amount of classified information could not be performed without overwhelming licensee resources.

Page l 23

FFBL Responses to "Remote inspections were as effective as on-site inspections"

Disagree (1) Strongly Disagree (10)

Figure 4: FFBL - Effectiveness of Remote vs. Onsite Inspections

Feedback received in the FFBL (Figure 4) showed staff disagreed remote inspection were as effective as onsite inspections. As one DFF I interviewee described it The key message I want to emphasize is that I didnt find remote inspection to be an equal or better substitute for face-to-face inspection. While survey respondents stated, Remote inspections are an inadequate way to conduct inspections. and Remote inspections should not be the norm and should be reserved for special circumstances.

The responses were nearly as negative (Figure 5) when asked if the remote verification of equipment/facility condition and status were ef fective and could be continued:

FFBL Responses to "Remote verification of equipment/facility condition and status were effective and could be continued "

Neutral (1) Disagree (1) Strongly Disagree (9)

Figure 5: FFBL - Effectiveness of Remote Verification of Equipment & Facility Condition

When asked I can see myself conducting more inspections fully or partially remotely if I am given that option during the normal implementa tion of my inspection program (emphasis added), to which fuels BL personn el responded quite negatively as shown in Figure 6.

Page l 24

FFBL Responses to I can see myself conducting more inspections fully or partially remotely if I am given that option during the normal implementation of my inspection program

Neutral (2) Disagree (3) Strongly Disagree (6)

Figure 6: FFBL - Use of Remote Inspections Under Normal Conditions

  • Onsite Inspection:

Feedback from surveys and interviews regarded onsite inspection s as the most effective and most preferred approach to completing inspections. This should be the only type of inspection performed at facilities that have s trict information security controls because they handle large amounts of classifi ed information.

One survey respondent stated, I recommend on-site as the best practice for inspections. Another said The vast majority of inspections should be performed on-site to enable them to be completed at a better quality

  • Hybrid Inspection, with Onsite Performed Afterwards:

Although this type of inspection was commonly performed in the FFBL by DFFI, feedback shows it was one of the least preferred methods of ins pection. It is viewed as better than fully remote inspections, but still infer ior to onsite, or remote with onsite inspection performed at the same time. When asked to respond to the statement, The increased ability to divide inspections into pi eces that are conducted at different times was effective and could be continu ed, staff in the FFBL mostly disagreed as shown in Figure 7.

Page l 25

FFBL Responses to The increased ability to divide inspections into pieces that are conducted at different times was effective and could be continued

Strongly Agree (1) Agree (2) Neutral (2)

Disagree (3) Strongly Disagree (3)

Figure 7: FFBL - Effectiveness of Dividing Inspections into Pieces to be Completed at Different Times

  • Hybrid Inspection, with Onsite Performed Concurrently:

The survey did not directly address the effectiveness of this f orm of inspection.

Although some respondents mentioned it during the surveys and i nterviews. With one respondent stating We could consider splitting people up on team inspections and having one person remote and one onsite. I personally don't prefer to do that, but we could allow it to be done at the team lead or branch chief's discretion. Another said, Some inspectors may prefer hybrid inspections, so giving the team lead or BC the ability to make an inspection a hybrid inspection could be good. One DFFI interviewee stated, If we do a remote inspection, it needs to be on the same week (i.e., hybrid) not the remote with onsite follow up.

It was also noted that licensees, even the ones supportive of r emote inspections, do not like it when the inspection is split. A DFFI interviewe e commenting on licensee feedback stated, [a Category III fuel cycle facility] advocated for more remote inspection if the whole inspection occurred on the same week. If we do have a hybrid inspection, do it the same week. Dont have that three-month gap between remote and onsite. Licensees feel like they are supporting the same inspection multiple times and have to ramp up their resources multiple times instead of just once.

  • Resident Inspections:

Although not addressed in a specific question by the survey, th e respondents who did mentioned resident inspection thought that some portions co uld be completed remotely. Respondents said, there are aspects of all inspections, include resident inspection, that can be performed remotely; and some routine resident inspector document review [can be completed remotely during normal operations]

While another noted that All core fuel facility inspections should have been permitted for onsite inspection. If facilities are determined to be essential, then regional and resident inspectors should also be considered essential

Page l 26

  • TRG Approval Needed for Onsite Inspection:

Because the TRG would not approve inspection travel until the w eek before the inspection, one respondent to the survey listed Uncertainty of travel approval until last minute to be the biggest challenge to support onsite inspection activ ities. An interviewee discussed the challenges of associated with making choices on whether or not to send inspectors onsite:

o The challenge was coming up with a process for making choices on who to send where for what that was difficult. Which source(s) of data are we using to make choices? What are the screening criteria? Whats good or not good from a gating criteria standpoint? OPM memo was a good benchmark for some criteria (the gating criteria). It was good for a federal agency to make recommendations, but also it wasnt geared toward inspections.

  • Inspection Planning:

To get the most out of remote inspection it was necessary to pl an for the inspection. Several respondents to the survey indicated the im portance of planning. Saying, it is [i]mportant to properly plan for an inspection. Review as many documents as possible prior to conducting onsite activities. Other stating Use part of the inspection prep week to coordinate who is looking at which sections of an [inspection procedure].

One respondent identified Increased communication frequency with the facilities as a best practice during the PHE. Another mentioned that the screening of events to determine if inspection is needed often requires a great deal of communication with the licensee, which is similar to what would be done during a remote inspection of that event.

  • NRC Box and Licensee e-Rooms:

When asked In general, how effective was the use and access to NRC provided capabilities/platforms for information sharing (e.g., Teams and Box) to conduct remote inspections? the FFBL respondents overwhelmingly considered these tools effective as shown in Figure 8.

Page l 27

FFBL Responses to "In general, how effective was the use and access of NRC provided capabilities/platforms for information sharing (e.g. Teams and Box) to conduct remote inspections?

Effective (10) Neither effective nor ineffective (1)

Figure 8: FFBL - Effectiveness of NRC File Sharing Capabilities During Remote Inspections

When asked What new processes or practices adopted during the current COVID-19 PHE should be continued once we return to normal opera tions?

Three fuels BL respondents identified the continued use BOX/ele ctronic reading room. One respondent wanted to only use Box, saying the NRC sh ould Encourage [the] use of BOX by all facilities to give inspector s a single-source location for all inspection prep rather than the patchwork of v arious licensee products. However, others noted limitations with the use of BOX and e-Roo ms saying, Some licensees found remote inspections to be overly burdensome due to working with classified matter, or the majority of their documentation is still be handled via hardcopies. Another discussed these issues when asked about licensee feedback, saying, Some licensees have a robust eRoom and have little issue facilitating remote inspections. For some licensees it was a lot of work for them to upload lots of documents to an eRoom. For our Cat 1 facilities many of their documents are classified and cannot easily be reviewed remotely outside the secure room. The NRC BOX system did work well for sharing non-classified documents, but it took a lot of time and effort for them to perform classification reviews on documents before uploading them to BOX.

  • Delaying Inspections:

Survey respondents were split if rescheduling inspections was e ffective as shown in Figure 9. The individuals who strongly disagreed or disagre ed, also indicated the program should have maintained the inspection schedule inst ead of changing due to the COVID-19 PHE and also supported resuming onsite insp ections.

Another respondent said I understand that there was a lot of uncertainty at the beginning of the PHE and restricting travel was probably the best decision.

However, as the PHE evolved and more data was available, there were still some hesitation to conduct inspections on-site when in reality there was not a significant risk to the inspectors when compared to the risk of routine daily activities. These personnel may have been more supportive of rescheduling inspect ions, when

Page l 28

doing so simply involves moving the date of an onsite inspectio n rather than including a remote component. The respondent who strongly agre ed, specifically mentioned [moving] an inspection in response to site conditions/activities as a best practice during the PHE.

FFBL Responses to "The rescheduling of inspections was effective and could be continued"

Strongly agree (1) Agree (4) Neutral (3)

Disagree (2) Strongly Disagree (1)

Figure 9: FFBL - Effectiveness of Rescheduling Inspections

  • Delaying the Exit:

One respondent listed the best practice during the PHE of Being willing to extend the inspection to ensure all areas are covered adequately. And an interviewee answered generally, saying I see the future of oversight programs as much more flexible than ever before.

  • Remote Exit/Entrance Meetings:

Remote exit meetings overlap with delaying the exit, because ve ry often when remote exit, or entrance meetings were conducted they were cond ucted outside the normal time that entrance or exit meetings would be held du ring onsite inspections. As shown in Figure 10 most respondents in the FFB L support the continued use of holding entrance and exit meetings remotely.

Page l 29

FFBL Responses to "Remote entrance/exit meetings were effective and could be continued"

Strongly Agree (2) Agree (7) Neutral (1) Strongly Disagree (1)

Figure 10: FFBL - Effectiveness of Remote Entrance/Exit Meetings G. Areas most suitable for remote inspection

The inspection areas most suitable for remote inspection was di rectly addressed by questions in the survey. Figure 11 show responses to survey qu estion: To prepare for future public health emergencies, or other events which restric t the ability to perform onsite inspection, which inspection activities should the NRC h ave the capability and flexibility to perform remotely?

FFBL Responses to: "... which inspection activities should the NRC have the capability and flexibility to perform remotely" 8

7

6

5

4

3

2

1

0 Inspections of Reactive Inspection of All routine Other (2) lower-risk activitiesinspections (5) higher-risk inspections (3)

(7) activities (3)

Figure 11: FFBL - Inspection Activities That Can Be Performed Remotely

When asked to provide details the survey respondents gave a range of answers:

Page l 30

o All core fuel facility inspections should have been permitted for onsite inspection.

o A risk assessment should be performed. Lower risk inspections should be postponed or performed remotely. Inspectors should go onsite for higher risk activities such [as] operations, fire protection, physical security, MC&A, and criticality safety.

o Fuel facilities can conduct remote inspections for lower risk activities such as environmental inspections and MC&A inspections.

o we should have the ability to conduct as much remote inspection as possible during things like public health emergencies (with the possible exception of things like physical security and information security which involve lots of classified material).

Some inspection is better than none if we can't be onsite.

o records review (e.g., training records, review of historical equipment/test performance data, etc.) make great candidates for remote inspection. [But] Remote review typically only reveals that the licensee believes they're implementing the program correctly. It's been very challenging to remotely ascertain whether or not they came to same conclusion we would have if we were independently observing their actions.

o training documentation reviews, corrective action reviews, and audits/assessments reviews can be conducted remotely as can reviews of procedures. Interviews can also be done remotely, but nothing more.

o Remote inspections should be further risk-informed to consider low-risk activities first while trying to conduct high risk activities on-site at a later time. If travel and access restrictions are expected to prolong, then a "best-effort" remote inspection would probably be the only option left.

In general, the respondents considered that onsite inspection s hould be performed when and where possible. When not possible due to site conditions o r travel restrictions, lower risk inspection activities can be performed remotely with onsite inspection being devoted to higher-risk activities. There was no consensus on what inspections were lower risk, for example one respondent identified Material Cont rol and Accountability (MC&A) inspections as higher-risk, while another identified MC& A as lower risk. One respondent considered that all inspections should be done onsit e with none done remotely.

Another question asked in the survey that addressed this issue, was Once normal operations resume, what inspections or portions of inspections could be performed remotely? To which respondents provided similar answers as th ose discussed above.

Three respondents were totally against any remote inspections. Four respondents mentioned document review, but with reservations or cautions th at remote is less effective, and/or should only be used in exceptional circumstan ces:

o Document review can be performed remotely but document review without onsite verification is not as reliable a method to evaluate and determine compliance.

o no inspection activity should be performed remotely during normal operations.

However, some special circumstances (e.g., staffing, scheduling issues) may benefit Page l 31

from conducting certain activities remotely so the program completion is not delayed.

In general, anything that is programmatic in nature could be reasonably inspected remotely (Audits, training records, corrective actions, procedures, calculations, etc.).

o Some limited review of paperwork (e.g., drill scenarios, environmental sampling, procedure changes), some virtual attendance at licensee meetings, and some routine resident inspector document review. In general, however, inspection requirements that can be completed remotely, could/should be completed better on-site with observations, walkdowns and in-person interviews rather than mere document review and phone interviews.

o The only inspection I conducted that may make sense to conduct fully remotely is the PI&R inspection, because it is so heavily focused on document review, which is easier at home on a bigger monitor than on just the NRC laptop. Even with that though, you lose out on the ability to walk down a system/area if desired.

Four more respondents listed areas of document review that coul d be conducted remotely:

o document reviews (assessments, corrective actions, routing audits)

o records, calculations, and procedure review could be performed remotely prior to the

[onsite] inspection

o corrective actions reviews, audits/assessments reviews, training qualifications and record reviews, and organizational qualifications

o training documentation reviews, corrective action reviews, and audits/assessments reviews... procedures

Inversely the survey also asked which inspections or inspection areas could not be done remotely. To which one respondent answered that no inspections could be done remotely. Two answered that only PI&R inspections could be don e remotely. Two mentioned Category 1 facilities, while another said that the re sident inspection IPs were not well suited for remote inspection. Specific examples given included:

o MC&A, INFOSEC, Physical Security, NCS, Cat I fuel facilities.

o [MC&A inspections involving] item monitoring performance tests, inventory observations.

o Operational implementation (e.g., observation of work activities, walkdowns, procedural adherence, etc.) should be limited to direct inspection.

o plant modifications, radiation protection, fire protection, and criticality safety.

o Not good for hybrid or remote inspection: plant modifications, emergency preparedness, environmental protection, emergency preparedness, exercise, and transportation. Not good for remote: all of the above plus radiation protection, criticality safety, operational safety, and fire protection.

Page l 32

The differences between the lists of areas listed, is likely du e to the differences in inspector experiences when conducting the same inspection at di fferent facilities, and with different focus areas with those facilities. Likewise, th e inspectors could only provide input based on the inspections they conducted, and no i nspector has performed all IPs.

H. Modifications that should be adopted

The FFBL has already modified IMC 2600 to explicitly provide th e flexibility for the use of remote inspection during a PHE and normal conditions. However, further work to formalize a process to decide what portions of inspections to c onduct remotely during normal operations will be needed should we adopt this practice broadly. Based on the feedback received, this should involve a risk assessment of the specific inspection activities being proposed for remote inspection (i.e., specific to focus areas of the inspection, the IP being used, the specific site, and the capab ilities of the licensee).

Nonetheless, consistent with recommendation in the NMU BL, the working group recommends that the majority of routine inspection activities r eturn to being performed through direct onsite inspection, but remote inspection, or hyb rid inspection flexibilities and scheduling flexibilities, be permitted on a case-by-case ba sis, and under the consideration of risk, licensee performance factors, and in coo rdination with management. Additional guidance is needed in IMC 2600 Sections 08.01 and 11.01 to include flexibilities leveraged during the PHE such as the resc heduling inspections or conducting remote entrance and exit meetings. If these flexibi lities are included, the IMC should provide a structured process for rescheduling inspection s. A statement that these techniques are permitted when beneficial to completing th e program, and after consulting with the branch chief, and licensee, may be sufficie nt. IMC 2600 currently does not discuss rescheduling inspections or conducting remote entrance or exit meetings, which may unintentiona lly discourage these activities because they would be considered outside of procedure. Furthermore, should the FFBL inspection program adopt these flexibilities in the normal/routine implementation of inspections or continue to use them broadly during the current and future PHEs, the agency would need to implement a way to track the extent these flexibilities are bei ng used to be able to evaluate their impact on the program in the future.

If some remote inspection techniques will continue to be levera ged in the normal implementation of the inspection program, guidance should be de veloped to clarify how to incorporate pictures, and/or video as part of remote inspect ions. Guidance could include the process for sharing and retaining (or not retaining ) the pictures/video, the process to review the pictures/video to determine whether or no t they are appropriate for public disclosure, and examples of what is, or isnt appropriat e to request as part of a remote document request.

More specific to hybrid approach for inspections in the FFBL, t he working group recommends the following.

During current COVID-19 PHE - Should the hybrid approach be lev eraged to conduct inspections, it should be utilized with onsite and remote inspe ction occurring concurrently instead of the remote and onsite portions being co nducted at different times with, different teams.

Page l 33

Future PHEs - The hybrid approach beginning with remote inspect ion with later onsite follow-up can be a tool in the toolbox if a future PHE makes it unsafe to be onsite at a licensee facility, but when the conditions support some onsite presence, hybrid inspections with both elements occurring concurrently are prefe rred over remote inspection with subsequent onsite follow-up.

During normal implementation of the program - Onsite inspection is the preferred method of inspection during the normal implementation of the pr ogram. The hybrid approach with concurrent onsite and remote inspection may be co nsidered on a case-by-case basis through coordination between the inspection team and management. The hybrid approach dividing inspections into piec es that are conducted at different times should not continue in the normal implementa tion of the program since the feedback pointed to inefficiencies in using that approach f or inspections, especially if different inspection teams, are involved at the later onsite in spection that were not involved in the initial portion of the inspection.

VIII. Decommissioning and Low-Level Waste Business Line

The Decommissioning and Low-Level Waste BL is managed by NMSS a nd inspections are implemented by Region I, Region III, and Region IV.

A. Practices, processes, inspection techniques, communications, and adjustments

Similar to the other BLs, the Decommissioning and Low-Level Was te BL (DLLW) inspectors adjusted aspects of the inspection program to accomm odate new practices and flexibilities to protect staff safety and the safety of the public against COVID-19, while also balancing the need to conduct effective oversight as part of the agency critical safety mission.

During the PHE, DLLW conducted onsite, remote, and hybrid inspe ctions. DLLW, in coordination between the Regions and HQ also postponed some ins pections. When circumstances were unfavorable for travel and options existed t o inspect remotely, inspectors pursued alternate methods of inspection, including c onference calls, remote document reviews, and remote observation of activities via live videos.

DLLW inspectors traveled on a case-by-case basis considering ma ny factors such as licensee activity, inspector willingness to travel, local site conditions, licensees staff status and policies (e.g., licensees availability, restriction s to onsite access, and whether their staff has covid), local restrictions and testing protocol s, and branch chief approval of proposed plan. Also, the decision of whether inspections sh ould be conducted onsite, or remotely depended on whether the inspection activities requi red an onsite presence.

Especially early in the PHE, onsite inspections were appropriat ely coordinated in advance with the licensee for onsite, remote, or hybrid inspect ions. This early coordination provided an opportunity for licensees to coordinat e with personnel, who may have been working remotely, to be available for the inspect ions. For onsite inspections, inspection activities were conducted outdoors when possible. When this was not possible, inspectors minimized time onsite, maintained social distance, and used PPE.

Page l 34

The June 1, 2020, memorandum continues to be used to assist dec ision-making and the February 2021 guidance continues to be used to ensure consisten cy in decision-making and documentation related to implementation of the inspection p rograms. Feedback in the DLLW BL supported this guidance be memorialized and readjus ted as needed for use in future major disruptive ev ents to ensure timely resumpti on of oversight activities.

B. Assessment of effectiveness, efficiency, and consistency

1. Differences among regions / headquarters Responses from DLLW staff indicated that there were not signifi cant differences in the practices, processes, and inspection techniques between the reg ions, and HQ.
2. Evaluation of virtual / remote inspection practices and techniques For remote inspections, inspectors attempted to complete IPs th rough document reviews, and staff interviews. However, not all aspects of the inspections could be completed remotely. A challenge that was reported during staff interviews of remote inspections in the DLLW BL is that most inspections conducted r emotely are compliance-oriented inspections, while inspectors strive to con duct risk-informed, performance-based inspections. When interviewed, DLLW inspecto rs commented that performance-based inspections cannot adequately be conduct ed remotely.

Consistent with the other BLs, the DLLW survey responses regard ing the effectiveness of remote inspection practices conducted during t he PHE was mostly negative. As shown in Figure 12, of the 12 responses received to "Remote Inspections were as Effective as Onsite Inspections," 7 DLLW in spectors generally disagreed that remote inspections were as effective as onsite i nspections while two remained neutral and three agreed.

DLLW Responses to: "Remote Inspections were as Effective as On-Site Inspections"

Strongly Disagree(3)Disagree(4) Neutral(2)

Agree(3) Strongly Agree(0)

Figure 12: DLLW - Effectiveness of Remote vs. Onsite Inspections

Furthermore, as shown in Figure 13, and consistent with the oth er BLs, most of the respondents disagreed that the remote observation of activities was effective (compared to onsite) and could be continued in the routine impl ementation of the inspection program.

Page l 35

Several inspectors commented that additional time should be all ocated for remote inspections since these tend to take longer to complete. Other s commented that the entire inspection team is not alw ays necessary for inspections with the option for remote document reviews. This could even expand the remote tec hnical support for inspections. Lastly, one respondent indicated that inspectors should have the ability to conduct inspections remotely to be prepared for future PHEs.

DLLW Responses to: "Remote observation of licensee activities were effective and could be continued"

Strongly Disagree (4)Disagree(3) Neutral(2)Agree(2) Strongly Agree(0)

Figure 13: DLLW - Effectiveness of Remote Observation of Licensee Activities

For hybrid inspections, certain aspects of the IPs were reviewe d remotely (e.g.,

document reviews), while other aspects were conducted onsite (e.g., walk downs, observation of operations). For hybrid inspections, the remote and onsite reviews were conducted both concurrently/in parallel and in ser ies, with a remote document review first with onsite follow-up inspection. From t he survey responses, as shown in Figure 14, DLLW inspectors had opposing views regarding whether inspections could be divided and conducted at different times, as shown below.

Page l 36

DLLW Responses to: "The increased ability to divide inspections into pieces that are conducted at different times was effective and could be continued"

Strongly Disagree (1) Disagree(2) Neutral(3) Agree(4) Strongly Agree(1)

Figure 14: DLLW - Effectiveness of Dividing Inspections into Pieces to be Completed at Different Times

3. Areas Most Suitable for Remote Inspection From the DLLW survey and interview responses, routine inspectio ns of lower risk activities were generally identified as being most suitable for remote inspection during the routine implementation of the inspection programs. The res ponses lacked any further specificity into the individual IPs.

From the feedback received, remote review of documents, remote meetings and interviews with the licensee personnel were inspection aspects more amenable to remote inspection rather than observation of activities in the routine implementation of the inspection program. Additional inspection activities were discussed as being best conducted onsite, including allegations, inspection of high rad iation activity areas, observation of activities, site walkdowns, outage inspections, and field radiological surveys.

4. Modifications that should be adopted Due to the similar feedback received regarding the inspection p ractices during the COVID-19 PHE in the NMU and FFBL, the same recommendations made in these BLs will apply to the DLLW BL and are included below for comple teness:

The working group recommends that the majority of routine inspe ction activities return to being performed through direct onsite inspection, but remote inspection, or hybrid inspection flexibilities and scheduling flexibilities, be permi tted on a case-by-case basis, and under the consideration of risk, licensee performanc e factors, and in coordination with management. Should the DLLW inspection progr am adopt these flexibilities in the normal/routine implementation of inspectio ns or continue to use them broadly during the current and future PHEs, the agency wou ld need to implement a way to track the extent these flexibilities are used to be able to evaluate their impact on the program in the future.

Page l 37

IX. Spent Fuel and Transportation Business Line

The Spent Fuel and Transportation BL is managed by NMSS and ins pections are implemented by the DFM, Region I, Region II, Region III, and Region IV.

C. Practices, processes, inspection techniques, communications, and adjustments

In response to the COVID-19 PHE, spent fuel, and transportation inspectors adjusted the inspection program to accommodate new practices and flexibi lities to protect staff safety and the safety of the public against COVID-19, while als o balancing the need to conduct effective oversight to meet the U.S. NRCs safety missi on. Throughout the PHE, the staff evaluated inspections on a case-by-case basis to determine if inspections should be conducted onsite, remotely, or via a hybrid approach. The following outlines the inspection practices used by the spent fuel and transportat ion BL during the PHE:

1. Onsite Inspections The decision to perform onsite inspection activities was determ ined based on inspectors willingness to travel, travel methods required to r each the licensee, and local COVID-19 conditions. Onsite inspections were also perfor med to inspect high-risk activities or operations.
2. Remote Inspections In fully remote inspections, the inspectors completed all aspec ts of the inspection procedure through document reviews and phone and/or video calls and demonstrations.
3. Hybrid Inspections Hybrid inspections were used when certain risk-significant acti vities were occurring that either were not appropriate for video demonstration or the licensee could not accommodate the technological requests. In these circumstances, inspectors would generally complete the portions of the inspection that were ame nable to remote review prior to completing the onsite portion of the inspection to reduce the total amount of time required to be onsite.
4. Inspection Techniques Inspection techniques for onsite inspections remained generally unchanged during the PHE. Remote inspection techniques did require more coordin ation as inspectors needed prepare team for this approach, schedule remote intervie ws and demonstrations, coordinate sharing of licensee information, and in some cases adapt to the technological capabilities of the licensee being inspect ed.
5. Communication Communication efforts between the regional offices and NMSS wer e generally effective, but in the rapidly changing environment, inspectors, and management reported that a more efficient system for sharing information w as needed. As detailed in the NMU BL, setting up, a single, centralized inspection tra cking system that can be accessed by all parties who require inspection status informati on in a future PHE will address this inefficiency in the future.

Page l 38

The June 1, 2020, memorandum continues to be used to assist dec ision-making and the February 2021 guidance continues to be used to ensure consi stency in decision-making and documentation related to implementation of the inspe ction programs.

Feedback in the SFST BL supported this guidance be memorialized and readjusted as needed for use in future major disruptive events to ensure t imely resumption of oversight activities.

D. Assessment of effectiveness, efficiency, and consistency

1. Discuss differences among regions / HQ Overall, those interviewed felt that the decision-making proces s for determining if inspection should be performed onsite, remotely or with a combi nation thereof was generally consistent across the regions.
2. Evaluation of virtual / remote inspection practices and techniques Those interviewed felt that fully remote inspections should be reserved for extreme circumstances. Specifically, a large portion of the inspection s used in the spent fuel and transportation BL requires direct onsite presence, but ther e are portions of the inspections that can be performed remotely. Some comments rega rding remote inspections highlighted that any performance-based portion of t he inspection, such as walkdowns, or direct observations, interviews to assess perform ance, were not as efficient, nor effective when performed remotely.
3. Areas most suitable for remote inspection Throughout the PHE, inspectors demonstrated the ability, and wi llingness to maximize flexibilities in conducting remote inspections. The i nterviews and surveys conducted with the SFST BL showed a strong preference to have t he inspections be completed onsite and only utilize remote capabilities for porti ons of the inspections that require document review. Document review in the SFST BL c ould include, but not be limited to, a review of audits, assessments, calculation s, corrective action documentation, and design packages.

One area mentioned that could be performed remotely would be th e stand alone Independent Spent Fuel Storage Installation (ISFSI) inspections. However, those interviewed pointed out that these inspections should not be so lely completed remotely. Additionally, IP 60851 (Design Control for ISFSI Com ponents), IP 60856 (Review of 10 CFR 72.212(b) Evaluations), and IP 86001 (Design, Fabrication, Testing, and Maintenance of Transportation Packaging) are examp les of procedures that require a lot of document review and would therefore be go od candidates for a remote or hybrid approach inspection.

4. Modifications that should be adopted Inspectors and managers generally agreed that while remote insp ections were able to aid the agency meet its mission during the PHE, there are aspec ts of spent fuel, and transportation inspections that provide more value if conducted onsite. Feedback supported the agency to retain the ability to conduct remote an d hybrid inspections as necessary, such as during future pandemics, or disruptions to t he inspection program.

Consistent with the other BLs feedback, the SFST BL feedback su pports memorializing guidance used during the COVID-19 PHE is importan t to be most prepared for a future PHE. It also supports adopting flexibili ties, if not explicitly existing in inspection guidance, to allow remote reviews of documentation as well as Page l 39

using remote inspection techniques as needed in the normal impl ementation of the inspection program.

Due to the similar feedback received regarding the inspection p ractices during the COVID-19 PHE in the other BLs, the same recommendations made in the other BLs will apply to the SFST BL and are included below for completene ss:

The working group recommends that the majority of routine inspe ction activities return to being performed through direct onsite inspection, but remote inspection, or hybrid inspection flexibilities and scheduling flexibilities, be permi tted on a case-by-case basis, and under the consideration of risk, licensee performanc e factors, and in coordination with management. Should the SFST BL inspection pr ogram adopt these flexibilities in the normal/routine implementation of inspectio ns or continue to use X. Common Best Practices and Challenges and Additional Recommendations

A. Best Practices

The report for Phase A of the COVID-19 PHE Oversight Activities Assessment (ADAMS Accession No. ML21158A231) documented initial best practices in implementing the inspection programs during the PHE. The initial best practices were:

1. Early planning and communications with licensees are needed to support inspection activities during the PHE.
2. Staff need to be flexible on inspection duration in the cond uct of remote inspections.
3. For inspections that were partially conducted remotely (with planned onsite follow-up at a later date), it is very important that during or immedi ately after the remote inspection portion is completed, inspectors document detailed n otes on exactly what needs to be inspected during the onsite portion so there is cle ar understanding and no duplication of effort.
4. Maximize remote review of licensee documentation

The Phase B assessment also collected and analyzed best practic es from the start of the PHE up to the Summer 2021. All the best practices captured by Phase A were also highlighted as best practices during the Phase B assessment. I n addition to those, the following were brought forward as best practices during the PHE :

5. Announcing materials inspections - As detailed in Section VI.A.1 (NMU) respondents identified announcing materials inspections necessa ry and a best practice. This allowed for appropriate coordination and awaren ess between the licensee and staff to make informed decisions for materials ins pections.
6. Remote and hybrid inspections - Respondents indicated the us e of remote or hybrid inspections was a good practice as it allowed us to exer cise our oversight function while maximizing safety of people against the virus. The use of video and pictures to support inspections in addition to document review was regarded as necessary in the observation of high-risk activities when trave ling was not feasible for onsite inspections.

Page l 40

7. Use of BOX or other platforms for document sharing - With gr eater use of remote or hybrid inspections, the use of document sharing platforms such as BOX was highlighted as a best practice since it is available to all NRC staff and accessible by licensees to share large amount of documents to support inspect ion activities.
8. Request records in advance for remote, hybrid, and onsite in spections - Prior to the PHE, this practice varied by BLs since, for example, NMU BL mos tly conducted unannounced inspections, records were requested onsite rather t han prior to the inspection. However, respondents indicated across BLs that the requesting records in advance was a best practice to facilitate inspection activit ies. This does not only apply to remote and hybrid inspections but also for onsite insp ection as it allowed inspectors to minimize time or close contact with others while onsite.
9. Conduct interviews remotely during remote, hybrid, and onsit e inspections -

Respondents identified as a best practice to avoid close contac t among people to conduct interviews in support of inspections remotely or virtua lly through phone calls or Teams even while onsite.

10. Onsite inspections - Some respondents expressed that conduc ting onsite inspection was a best practice during the COVID-19 PHE. As det ailed in this report, despite limitations in travel the agency used a risk-informed a pproach to decide whether to delay an inspection or to perform an inspection onsi te, fully remotely, or partly remotely (hybrid). Therefore, onsite inspections were c onducted successfully when deemed necessary (e.g., high-risk activity, security-relat ed, reactive inspection) to obtain reasonable assurance of safety.

B. Challenges

The report for Phase A of the COVID-19 PHE Oversight Activities Assessment (ADAMS Accession No. ML21158A231) documented initial challenges in imp lementing the inspection programs during the PHE which are explained in that report. The initial challenges were:

1. No access to printers and electronic review of documents
2. Document sharing
3. Gaining access to licensee IT systems
4. Getting tested for COVID-19 in support of inspection activit ies
5. Social distance and facial coverings
6. Travel-related limitations and challenges
7. Conducting remote inspections

The Phase B assessment also collected and analyzed challenges f rom the start of the PHE up to the Summer 2021. Some challenges captured by Phase A were also brought up as common challenges during the Phase B assessment. The fol lowing are additional common challenges brought forward during Phase B:

Page l 41

8. Remote inspection success is largely dependent of licensees capabilities and cooperation - respondents shared that conducting remote inspect ions successfully depends on the full and timely cooperation or response of the l icensee being inspected. This challenge is not necessarily a willingness (fr om the part of the licensee) issue but sometimes a technological capability issue (e.g., does the licensee have the tools and resources to support a remote inspe ction?). This is something that cannot be easily predicted before you choose the remote method for an inspection and therefore difficult to consider in the decisi on to perform an inspection remotely.
9. Information technology tools to support inspections - Respon dents shared that to successfully conduct remote inspections, they often had to assi st licensees on the use of information technology tools to support the inspections which in turn takes more time to figure out the best way or tool to complete a remo te inspection.

Licensees knowledge/familiarity with information technology to ols to support remote inspection techniques and connectivity reliability varied great ly which in turn made remote inspections takes longer. Some licensees have primarily electronic records and others have primarily paper records. It is more burdensome and time consuming to share large paper records in support of an inspect ion. Additionally, for the licensees whose processes utilize classified informatio n, documents also had to undergo a derivative classification review before being uplo aded to an eRoom.

10. Remote and hybrid inspections - While this is also identified as a best practice, as discussed in detail in this report, support to remote, and hybr id inspection methods varied greatly. Among the challenges mentioned were that it takes longer to complete the inspection as it involves additional coordination, it involves many starts, and stops to inspection activities, managing competing priorities as routine office work continues, and remote interviews not conducive to s pontaneous conversations, and ad-hoc demonstrations. Also, the inability to assess licensee performance by observing highest risk areas or activities and c onducting independent surveys that are better suited to be done onsite, a ccording to these respondents.
11. Approval for travel - Respondents shared that the uncertainty for travel approval was a big challenge as it impacts inspection planning. Prepara tion for a remote inspection versus an onsite inspection varies and not knowing u ntil the week before or sometime days before the scheduled inspection made it extra challenging. While challenging, it was also understood that the reasons for making decisions close to the inspection start date was necessary to make the most risk-i nformed decision considering the volatile COVID-19 spread.

C. Additional Recommendations

Based on the feedback collected and analyzed, the working group identified the following recommendations that apply to all the BLs in NMSS:

During normal implementation of the program - Continue to allow flexibility to reschedule and move inspections to best accomplish the purpose of the insp ection (e.g., better licensee support, reduce licensee/inspector burden, ensure spec ific activities are occurring onsite, etc.).

For future PHEs - Feedback received indicated unclear guidance from the agency made it difficult in the beginning of the PHE to understand the info rmation needed and to be considered to determine to travel to conduct an inspection or t o decide to do it remotely Page l 42

or with a hybrid approach. Therefore, the working group recomm ends a centralized team, task force, or working group (like the COVID task force b ut specific for inspection activities or for travel) should be established as soon as poss ible to establish the decision-making criteria and process to be used by the programs to support decision-making for inspection activities. This will help achieve consi stency across the inspection programs and assist in establishing and enforcing processes to ensure the safety of the inspectors and their families (e.g., process if exposed during inspection, testing).

For current and future PHEs - The working group recommends that the Inspection Manual Chapters under NMSS develop guidance similar to that inc luded in Appendixes to IMC 2600 and 2690 for implementing inspection program during PHEs. Other programs such as materials, decommissioning, and uranium recove ry, do not currently include guidance on implementing the program during PHEs and sh ould create similar and consistent guidance for their programs. The guidance shoul d address roles and responsibilities, communication expectations, and a streamlined process to communicate inspection information to the program office. This guidance should also memorialize or reference the practices and interim guidance iss ues during the COVID-19 PHE.

Those programs that already have PHE-related guidance, the fuel cycle inspection program, and the spent fuel inspection program, should update t his guidance as needed based on additional learnings from the COVID-19 PHE since they were issued, and to include interim guidance issued during this period.

For current and future PHEs and normal implementation of the pr ogram - Continue to promote, support, and maintain information technology tools to facilitate remote inspection techniques using file sharing tools such as BOX to b etter enable file sharing with licensees who do not have their own e-rooms. Use video te leconferencing and other video platforms to support remote/distant interviews, rem ote observation of activities, document review, or additional technical support fo r inspections.

Feedback showed that inspectors relied more on personal mobile devices to support remote inspection and some were uncomfortable with this practic e. The working group discussed that this could be addressed with additional guidance or training on the tools and devices available to support remote and/or virtual inspecti on activities that do not rely on the use of personal mobile devices.

Page l 43

XI. Summary of Recommendations

Business Recommendations Line Applicability 1 With regard to the use of remote or hybrid inspection techniques in the normal NMU implementation of the program FF DLLW Based on the feedback received, the working group recommends that during SFST normal operations, or routine implementation of the inspection program, the majority of routine inspection activities return to being performed through direct onsite inspection. However, on a case-by-case basis, if an inspector believes that organizational efficiencies can be obtained by performing certain inspection activities remotely while maintaining its effectiveness, the inspector should have the option to utilize remote inspection techniques when deemed appropriate by the inspector or inspection team and their management. The inspector must consider licensee performance and specific inspection activity risk to support the decision to perform the inspection activities (or portion of one) remotely.

Should the BLs adopt these flexibilities in the normal/routine implementation of inspections or continue to use them broadly during the current and future PHEs, the agency should implement a way to track the extent these flexibilities are being used to be able to evaluate its impact on the program in the future.

For example, in NMU, the working group recommends updates are made to WBL inspection module to ensure there is a way for inspectors to indicate if an inspection was performed with a hybrid approach, onsite, remotely, or announced. WBL should also be modified to allow the inspector to populate the basis of the decision to conduct a remote, hybrid, announced, or unannounced inspection.

2 With regard to the use of remote or hybrid inspections during the current and NMU future PHEs FF DLLW Based on the feedback received, the working group recommends continuing SFST leveraging remote inspection techniques currently in place to implement inspection programs while ensuring inspection staff have access to adequate PPE and technology tools needed to conduct inspection activities safely and effectively.

3 With regard to the practice of announcing inspections in NMU BL NMU

a. During normal implementation of the program - The general practice of announcing remote materials inspections in advance should occur only in certain circumstances (case-by-case) where the inspector and BC determine it would improve organizational effectiveness or efficiency (ex. a licensee in a remote area where we know they only do licensed activities on an infrequent basis).
b. During current and future PHEs - The practice of announcing materials inspection to support inspection activities during the PHE was important to ensure the safety of inspectors and licensee staff and should continue in the current and future PHEs.

4 With regard to the hybrid approach for inspections in the FFBL FF Page l 44

a. During current COVID-19 PHE - Should the hybrid approach be leveraged to conduct inspections, it should be utilized with onsite and remote inspection occurring concurrently instead of the remote and onsite portions being conducted at different times with, different teams.
b. Future PHEs - The hybrid approach beginning with remote inspection with later onsite follow-up can be a tool in the toolbox if a future PHE makes it unsafe to be onsite at a licensee facility, but when the conditions support some onsite presence, hybrid inspections with both elements occurring concurrently are preferred over remote inspection with subsequent onsite follow-up.
c. During normal implementation of the program - The hybrid approach dividing inspections into pieces that are conducted at different times should not continue in the normal implementation of the program since the feedback pointed to inefficiencies in using that approach for inspections, especially if different inspection teams are involved at the later onsite inspection that were not involved in the initial portion of the inspection. In general, onsite inspection is the preferred method of inspection during the normal implementation of the program.

The hybrid approach with concurrent onsite and remote inspection may be considered on a case-by-case basis through coordination between the inspection team and management.

5 With regard to flexibilities in scheduling of inspections NMU FF During normal implementation of the program - Continue to allow flexibility to DLLW reschedule and move inspections to best accomplish the purpose of the SFST inspections various needs (e.g. better licensee support, reduce licensee/inspector burden, ensure specific activities are occurring onsite etc.).

6 With regard to information to assist decision-making NMU FF For future PHEs - Feedback received indicated the unclear guidance provided DLLW by the agency made it difficult in the beginning of the PHE to understand the SFST information needed and to be considered when determining whether to travel to conduct an inspection, perform the inspection remotely or perform the inspection utilizing a hybrid approach. Therefore, the working group recommends a centralized team, task force, or working group (like the COVID task force but specific for inspection activities or for travel) should be established as soon as possible to establish the decision-making criteria and process to be used by the programs to support decision-making for inspection activities. This will help achieve consistency across the inspection programs and assist in establishing and enforcing processes to ensure the safety of the inspectors and their families (e.g., process if exposed during inspection, testing).

7 With regard to guidance for pandemics or PHEs NMU FF For current and future PHEs - The working group recommends that the DLLW Inspection Manual Chapters under NMSS develops guidance similar to that SFST included in Appendixes to IMC 2600 and 2690 for implementing inspection program during PHEs. Other programs such as materials, decommissioning, and UR, do not currently include guidance on implementing program during PHEs, and should create similar and consistent guidance for their programs.

The guidance should address roles and responsibilities, communication expectations, and a streamlined process to communicate inspection information Page l 45

to the program office. This guidance should also memorialize or reference the practices and interim guidance issues during the COVID-19 PHE.

Those programs that already have PHE-related guidance, the fuel cycle inspection program, and the spent fuel inspection program, should update this guidance as needed based on additional learnings from the COVID-19 PHE since they were issued, and to include interim guidance issued during this period.

8 With regard to information technology tools NMU FF For current and future PHEs and normal implementation of the program - DLLW Continue to promote, support, and maintain information technology tools to SFST facilitate remote inspection techniques using file sharing tools such as BOX to better enable file sharing with licensees who do not have their own e-rooms.

Use video teleconferencing and other video platforms to support remote/distant interviews, remote observation of activities, document review, or additional technical support for inspections.

Alternate views It is worth noting that not all working group recommendations w ere unanimously supported.

One working group member was not supportive of some of the reco mmendations included in this report. The working group members proposed staff intervi ew questions were not included in the final version (Appendix B). As a result, that working g roup member felt there was lack of transparency in not including its proposed staff interview ques tions and felt the existing questions in the staff interviews were leading questions to a s pecific outcome. The working group member believed that: (1) each business line should have been assessed separately in order to be responsive to the specific challenges associated wi th that inspection program; (2) the recommendations did not fully consider the distinct needs a nd challenges of each inspection program and therefore lack specificity; and (3) the adjustments implemented during the PHE lacked change management oversight and effective feedback mecha nisms for the staff.

The working group considered all the questions suggested by wor king group members and discussed them during working group meetings. The working grou p ultimately decided on the staff interview questions provided in Appendix B of this report since the they applied to personnel in all business lines, and they were identified to su pplement feedback received during the survey and aligned with meeting the objectives of the worki ng group charter. The working group discussed the alternate views prior to finalizing its rec ommendations. The rest of the working group members continue to be supportive of all the reco mmendations provided in this report despite the alternate views discussed above.

XII. Conclusion

The working group found that, despite the challenges presented by the COVID-19 PHE, the NMSS oversight programs remained effective in accomplishing its important oversight mission since the agency implemented mandatory telework in March 2020. The staff continues to demonstrate creativity, innovation, flexibility, and resiliency to best accomplish the objectives of the inspection programs. The working group believes implementi ng the recommendations stemming from this assessment would enhance the implementation of these programs during the current, ongoing COVID-19 PHE, any future pandemic or PHE, and enhance aspects of the current framework for the oversight programs based on what we e xperienced in recent months.

Page l 46

Appendix A - Survey Questions

Page l 47

COVID-19 PHE - Oversight Activities Assessment Survey

The purpose of this anonymous and voluntary survey is to get feedback related to the oversight activities associated with the Nuclear Materials and Waste Safe ty Programs (NMWSP) during the COVID-19 PHE and its associa ted mandatory/maximum telework period.

We want to learn about your personal experiences, best practice s, and challenges encountered while implementing the oversight programs associated with the N uclear Materials and Waste Safety Programs being implemented during the COVID-19 PHE.

The survey results will be assessed to evaluate the various pra ctices, adjustments, processes, and different inspection techniques that have been used to carr y out our important oversight function associated with the Nuclear Materials and Waste Safety Programs.

The results will be further evaluated for the development of re commendations to enhance inspection-related and programmatic guidance for the current CO VID-19 or future PHEs. The results may also be used to inform recommendations to enable NM SS activities to become more agile, resilient, and efficient both during future PHEs, a nd when operating under normal circumstances.

The survey will remain open through May 26, 2021. Once you subm it the survey, you cannot alter your responses. However, there will be an additional oppo rtunity to provide feedback at a later time.

1. Identify any best practices you identified during the condu ct of inspections (remote, onsite, and hybrid) and/or related oversight functions during the COVID -19 PHE.
2. What were the challenges you faced while performing inspect ions (remote, onsite, and hybrid) during the COVID-19 PHE? How did you overcome or addres s the challenge?
3. Provide your personal lessons learned relating to your insp ection activities during the COVID-19 PHE?
4. In general, how effective was the use and access of NRC pro vided capabilities/platforms for information sharing (e.g., Teams and Box) to conduct remote ins pections?
  • Effective
  • Neither effective nor ineffective
  • Ineffective
  • No basis

Page l 48

5. To prepare for future PHEs, or other events which restrict the ability to perform onsite inspection, which inspection ac tivities should the NRC have the capability, and flexibility to perform remotely?
  • All routine inspections
  • Inspection of higher-risk activities
  • Inspections of lower risk activities
  • Pre-licensing site visits
  • Initial materials inspections
  • Other
6. Based on your response above to Question 5, please provide additional information on which activities or inspections you believe could have more flexibili ty (please specify your inspection program, i.e., materials, fuel facilities, etc.)?
7. Once normal operations resume, what inspections, or portion s of inspections could be performed remotely (please specify your inspection program)?
8. Within your BL, are there particular inspection areas that you feel are NOT good candidates for hybrid or remote inspection following the return to normal inspection operations? (Please specify your program)
9. What feedback have you received from licensees or certifica te holders regarding NRC conduct of remote inspections during the COVID-19 PHE?
10. Having conducted remote inspections and site visits over th e last year, please provide your views on the following statements:

Strongly Strongly Disagree Disagree Neutral Agree Agree Remote inspections were as effective as onsite inspections Remote inspections served as a good tool to replace onsite inspections ONLY during periods of travel restrictions I can see myself conducting more inspections fully or partially remotely if I am given that option during the normal implementation of my inspection program Remote meetings with the licensee were effective (e.g., entrance and exit meetings) and could be continued Remote interviews were effective and could be continued Remote document reviews were effective and could be continued Remote observation of licensee activities was effective and could be continued Page l 49

Remote verification of equipment/facility condition and status were effective and could be continued Remote event follow-up was effective and could be continued

The rescheduling of inspections was effective and could be continued The increased ability to divide inspections into pieces that are conducted at different times was effective and could be continued

11. What new processes or practices adopted during the current COVID-19 PHE should be continued once we return to normal operations?
12. What processes or practices adopted during the current COVI D-19 PHE should not be continued once we return to normal operations?
13. Are there practices that were put in place during the PHE t hat should not be continued during normal operations, but that should be saved for future events which restrict onsite inspection?
14. Please provide your job type.
  • Region-based inspector or license reviewer
  • HQ inspector
  • Resident inspector
  • Supervisor/manager
  • Administrative Support
  • Security inspector
  • Programmatic support to inspection
  • Other
15. What BL(s) do your oversight program functions or inspection activities support? This is being asked to determine whether recommendations resulting from this survey should be specific to any BL.
  • Nuclear Materials
  • Spent Fuel Storage and Transportation
  • Fuel Facilities
  • Decommissioning and Low-Level Waste
  • Other
16. This space is provided for any additional feedback that you would like to provide as it relates to your experience implementing the oversight program functions or inspections during the COVID-19 PHE, any feedback you have for how things should be im plemented once normal inspections are resumed, and any feedback for preparing for fut ure events that restrict onsite inspection.

Page l 50

Appendix B - Interview Questions Page l 51

Staff Interview Questions

1. How are you feeling in your role as an inspector after near ly 1.5 years of the PHE?
2. How has your approach to inspections changed to accommodate the transition to remote inspections?
3. Can you provide an overview of the decision-making process used in your work unit for deciding if inspections will be performed remotely or onsite?
4. When deciding if inspections will be performed remotely or onsite: Are any changes needed to ensure consistency within your business line?
5. When deciding if inspections will be performed remotely or onsite: How important are licensee specific issues or concerns in this process?
6. When deciding if inspections will be performed remotely or onsite: Can a uniform approach to remote/onsite inspections be made by inspection area type, i f flexibilities are still available for inspector, and management discretion?
7. When deciding if inspections will be performed remotely or onsite: Are there inspection areas or particular types of licensees that are well suited for remote inspection?
8. When deciding if inspections will be performed remotely or onsite: Are there inspection areas or types of licensees that are particularly challenging t o perform effectively in a remote environment?
9. ONLY APPLICABLE FOR MATERIALS INSPECTIONS (NMU BL) How has the impact of performing announced inspections during the PHE affected inspec tions?
10. ONLY APPLICABLE FOR MATERIALS INSPECTIONS (NMU BL) Overall, do feel announcing inspections has had a positive, negative, or neutral impact on the conduct of inspections? Why?
11. ONLY APPLICABLE FOR MATERIALS INSPECTIONS (NMU BL) Do you feel that this change (announcing inspections) has made inspection overall mor e or less effective or has there been a neutral effect?
12. Technology enabled us to rapidly adapt during the PHE. Wha t specific systems did you utilize in the course of your remote inspections?
13. Technology enabled us to rapidly adapt during the PHE. Are there tools that you needed that you didnt have access to?
14. Technology enabled us to rapidly adapt during the PHE. Wer e the instructions and guidance for using technological tools sufficient, or are more resources needed?
15. Do IPs and IMCs need revisions in order to accommodate ou r lessons learned during the PHE into our inspection program during normal times?
16. Do you feel that there have been any missed opportunities t hat could have helped the NRC respond to the PHE more-efficiently overall?

Page l 52

17. What has been the feedback that you have received from lice nsees regarding remote and hybrid inspections?
18. Do you have anything additional feedback to add?

Page l 53

Regional/Office Branch Chiefs - Interview Questions

1. The NMWSP span across all regions and different divisions i n NMSS, what was your experience with regard to communications, coordination, and gui dance with the program office, and among regional counterparts during the PHE? Do you have an y feedback or recommendations you would like to share to improve any of these in the future?
2. What has been the most significant challenge, related to in spection activities, you experienced since the NRC went to mandatory/maximum flexibility telework? What do you believe can be done to address it?
3. What has been the most significant success story that youv e experienced in the implementation of the oversight programs during the COVID-19 PH E?
4. Considering what the agency has experienced implementing in spection/oversight programs in the past year, what specific enhancements would you recommen d for the effective, and efficient implementation of the NMWSP inspection programs?
5. In light of how the oversight programs were implemented dur ing the COVID-19 PHE (e.g., relying more on remote/hybrid inspections), what should we keep, and what should we stop when we return to normal operations? (When the agency is no longer in exercising telework flexibilities due to the PHE or with travel restrictio ns)
6. What is one area that the agency should focus on now to imp rove oversight programs (including inspections) to prepare for future pandemics or othe r national emergencies that may affect the implementation of oversight programs?
7. Has your experience overseei ng the inspection programs in y our organization during the COVID-19 PHE changed your vision for the future of the oversigh t program?
8. What has been the feedback provided to you from licensees o n alternate means (remote) for inspection or hybrid inspections?
9. What has been the feedback from your staff on inspection ac tivities during the COVID-19 PHE (remote/ hybrid/ or onsite inspections)?
10. What would have been nice to have to do your job better (re lated to inspections) during the COVID-19 PHE?
11. How was your experience with the various information techno logy tools available to support inspection activities? Do you have any recommendations for imp rovement?
12. Do you have anything else that you would like to share?

Page l 54

Regional/Office Division Directors -Interview Questions

1. The NMWSP span across all regions and different divisions i n NMSS, what was your experience with regard to communications, coordination, and gui dance with the program office, and among regional counterparts during the PHE? Do you have an y feedback or recommendations you would like to share to improve any of these in the future?
2. What has been the most significant challenge, related to in spection activities, you experienced since the NRC went to mandatory/maximum flexibility telework? What do you believe can be done to address it?
3. What has been the most significant success story that youv e experienced in the implementation of the oversight programs during the COVID-19 PH E?
4. Considering what the agency has experienced implementing in spection/oversight programs in the past year, what specific enhancements would you recommen d for the effective, and efficient implementation of the NMWSP inspection programs?
5. In light of how the oversight programs were implemented dur ing the COVID-19 PHE (e.g., relying more on remote/hybrid inspections), what should we keep, and what should we stop when we return to normal operations? (When the agency is no longer in exercising telework flexibilities due to the PHE or with travel restrictio ns)
6. What is one area that the agency should focus on now to imp rove oversight programs to prepare for future pandemics or other national emergencies that may affect the implementation of the oversight programs?
7. How has your experience overseeing the inspection programs in your organization during the COVID-19 PHE changed your vision for the future of the oversigh t programs?
8. What has been the feedback provided to you from licensees o n alternate means (remote) for inspection or hybrid inspections?
9. What would have been nice to have to do your job better (re lated to inspections) during the COVID-19 PHE?
10. Do you have anything else that you would like to share?

Page l 55

Office Directors and Regional Administrators-Interview Questions

1. The Nuclear Materials and Waste Safety Programs span all re gions and different divisions in NMSS, what was your experience with regard to communications, c oordination, and guidance with the program office, and among regional counterparts during the PHE? Do you have any feedback or recommendations you would like to share to improve any of these in the future?
2. What has been the most significant challenge, related to in spection activities, you experienced since the NRC went to mandatory/maximum flexibility telework? What do you believe can be done to address it?
3. What has been the most significant success story that youv e experienced in the implementation of the oversight programs during the COVID-19 PH E?
4. Considering what the agency has experienced implementing in spection/oversight programs in the past year, what specific enhancements would you recommen d for the effective, and efficient implementation of the NMWSP inspection programs?
5. In light of how the oversight programs were implemented dur ing the COVID-19 PHE (e.g., relying more on remote/hybrid inspections), what should we keep, and what should we stop when we return to normal operations? (When the agency is no longer in exercising telework flexibilities due to the PHE or with travel restrictio ns)
6. What is one area that the agency should focus on now to imp rove oversight programs to prepare for future pandemics or other national emergencies that may affect the implementation of the oversight programs?
7. How has your experience overseeing the inspection programs in your organization during the COVID-19 PHE changed your vision for the future of the oversigh t programs?
8. What has been the feedback provided to you from licensees o n alternate means (remote) for inspection or hybrid inspections?
9. Do you have anything else that you would like to share?