Letter Sequence Supplement |
---|
|
|
|
|
---|
Category:Legal-Affidavit
MONTHYEARWO 23-0002, Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082023-12-26026 December 2023 Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 WO 22-0056, Operating Corporations Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082022-12-19019 December 2022 Operating Corporations Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 ML22353A5552022-12-15015 December 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements ET 21-0017, Response to Request for Additional Information Regarding License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation2021-12-22022 December 2021 Response to Request for Additional Information Regarding License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ET 21-0012, Supplement to License Amendment Request for a Risk-Informed Resolution to GSI-1912021-10-11011 October 2021 Supplement to License Amendment Request for a Risk-Informed Resolution to GSI-191 ET 19-0008, Response to Request for Additional Information Related to Thermal Conductivity Degradation for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption.2019-03-0505 March 2019 Response to Request for Additional Information Related to Thermal Conductivity Degradation for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption. ML18313A2252018-10-25025 October 2018 Westinghouse Affidavit CAW-18-4828 - Application for Withholding Proprietary Information from Public Disclosure ET 18-0016, Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools Request for Supplemental Information2018-05-29029 May 2018 Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools Request for Supplemental Information ET 18-0012, Operating Corp., Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-04-19019 April 2018 Operating Corp., Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ET 15-0002, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.6.5, for Large Break Loss-of-Coolant (LOCA) Analysis Methodology2015-01-21021 January 2015 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.6.5, for Large Break Loss-of-Coolant (LOCA) Analysis Methodology ET 14-0009, Response to Request for Additional Information Regarding License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis2014-02-25025 February 2014 Response to Request for Additional Information Regarding License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis ML12298A0302012-10-22022 October 2012 Transmittal of Pci Proprietary Document No. PCI-2012.10.22-1 Rev 0; Responses to Staff Comments Dated July 11, 2012 ET 08-0017, Additional-Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification2008-03-14014 March 2008 Additional-Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification ET 07-0050, Response to Request for Additional Information Relating to Replacement of the Main Steam and Feedwater Isolation Valves and Controls2007-10-16016 October 2007 Response to Request for Additional Information Relating to Replacement of the Main Steam and Feedwater Isolation Valves and Controls ET 07-0022, Supplemental Information on Main Steam and Feedwater Isolation System Controls Modification2007-06-15015 June 2007 Supplemental Information on Main Steam and Feedwater Isolation System Controls Modification ML0715502252007-05-25025 May 2007 PWR Owners Group - Draft Revisions to Topical Report WCAP-15791 Revision 1, Risk-Informed Evaluation of Extensions to Containment Isolation Valve Completion Times, and the Final Safety Evaluation, MUHP-3010/LSC-0029/LSC-0135 ML0701702062006-11-0202 November 2006 Request for Withholding Proprietary Documentation of Material: White Paper: MRP Review of Implications of Wolf Creek Pressurizer Indications 2023-12-26
[Table view] Category:Letter type:ET
MONTHYEARET 23-0006, CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components2023-05-17017 May 2023 CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components ET 23-0005, 10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peen2023-03-16016 March 2023 10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened ET 23-0003, License Amendment Request (LAR) for Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications2023-03-0101 March 2023 License Amendment Request (LAR) for Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications ET 23-0002, Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2023-02-0707 February 2023 Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ET 23-0004, Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements2023-01-26026 January 2023 Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ET 22-0006, Operating Corp. - Application to Revise Technical Specifications to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2022-12-0101 December 2022 Operating Corp. - Application to Revise Technical Specifications to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ET 22-0010, License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements2022-08-0202 August 2022 License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ET 22-0012, Supplement to License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating2022-07-12012 July 2022 Supplement to License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating ET 22-0011, Withdrawal of 10 CFR 50.55a Request I4R-08, Relief for Extension of Follow-up Examination and Visual Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surface2022-05-31031 May 2022 Withdrawal of 10 CFR 50.55a Request I4R-08, Relief for Extension of Follow-up Examination and Visual Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surface ET 22-0005, Response to Request for Additional Information Regarding License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating2022-04-13013 April 2022 Response to Request for Additional Information Regarding License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating ET 22-0003, CFR 50.55a Request I4R-09 for the Fourth Inservice Inspection Program Interval, Relief from Examination of Reactor Vessel Flange Threads2022-04-0606 April 2022 CFR 50.55a Request I4R-09 for the Fourth Inservice Inspection Program Interval, Relief from Examination of Reactor Vessel Flange Threads ET 22-0002, Operating Corp 10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination and Visual Examination Requirements for Reactor Pressure Vessel Head .2022-04-0404 April 2022 Operating Corp 10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination and Visual Examination Requirements for Reactor Pressure Vessel Head . ET 22-0004, Operating Corp - Response to Request for Confirmation of Information (RCI) Regarding Steam Generator Tube Inspection Report2022-03-15015 March 2022 Operating Corp - Response to Request for Confirmation of Information (RCI) Regarding Steam Generator Tube Inspection Report ET 22-0001, Removal of the Table of Contents from the Technical Specifications2022-01-12012 January 2022 Removal of the Table of Contents from the Technical Specifications ET 21-0017, Response to Request for Additional Information Regarding License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation2021-12-22022 December 2021 Response to Request for Additional Information Regarding License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ET 21-0009, Results of the Steam Generator Tube Inservice Inspection During the 24th Refueling Outage2021-11-0101 November 2021 Results of the Steam Generator Tube Inservice Inspection During the 24th Refueling Outage ET 21-0015, Withdrawal of License Amendment Request for a Risk-Informed Resolution to GSI-1912021-10-20020 October 2021 Withdrawal of License Amendment Request for a Risk-Informed Resolution to GSI-191 ET 21-0012, Supplement to License Amendment Request for a Risk-Informed Resolution to GSI-1912021-10-11011 October 2021 Supplement to License Amendment Request for a Risk-Informed Resolution to GSI-191 ET 21-0004, License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating2021-09-29029 September 2021 License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating ET 21-0010, License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation2021-09-29029 September 2021 License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ET 21-0005, Operating Corp., License Amendment Request for a Risk-Informed Resolution to GSI-1912021-08-12012 August 2021 Operating Corp., License Amendment Request for a Risk-Informed Resolution to GSI-191 ET 20-0013, Response to Request for Additional Information Re Application for Technical Specification Change Re Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program (TSTF-415)2020-10-26026 October 2020 Response to Request for Additional Information Re Application for Technical Specification Change Re Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program (TSTF-415) ET 20-0011, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2020-10-0101 October 2020 Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ET 20-0007, License Amendment Request for Replacement of Engineered Safety Features Transformers with New Transformers That Have Active Automatic Load Tap Changers2020-06-0808 June 2020 License Amendment Request for Replacement of Engineered Safety Features Transformers with New Transformers That Have Active Automatic Load Tap Changers ET 20-0008, Operating Corporation Update for Full Implementation of Open Phase Detection System2020-05-20020 May 2020 Operating Corporation Update for Full Implementation of Open Phase Detection System ET 20-0004, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2020-04-27027 April 2020 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) ET 20-0002, Response to Request for Additional Information Regarding Utilizing Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 12020-01-29029 January 2020 Response to Request for Additional Information Regarding Utilizing Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 1 ET 19-0021, Errata for Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation2019-12-0909 December 2019 Errata for Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation ET 19-0020, Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation2019-11-13013 November 2019 Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation ET 19-0019, Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation.2019-09-10010 September 2019 Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation. ET 19-0018, Supplement to License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation.2019-08-22022 August 2019 Supplement to License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation. ET 19-0014, lnserv1ce Inspection (ISI) Program Relief Request Number 14R-07, to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, D1v1s1on 12019-08-15015 August 2019 lnserv1ce Inspection (ISI) Program Relief Request Number 14R-07, to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, D1v1s1on 1 ET 19-0002, License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation.2019-03-18018 March 2019 License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation. ET 19-0008, Response to Request for Additional Information Related to Thermal Conductivity Degradation for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption.2019-03-0505 March 2019 Response to Request for Additional Information Related to Thermal Conductivity Degradation for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption. ET 19-0003, License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Remove Use of a Blind Flange2019-02-25025 February 2019 License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Remove Use of a Blind Flange ET 19-0001, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 42019-01-23023 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4 ET 18-0032, Operating Corporation Change of Date for Full Implementation of Open Phase Detection System2018-12-0707 December 2018 Operating Corporation Change of Date for Full Implementation of Open Phase Detection System ET 18-0035, Operating Corp., Supplemental Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-12-0606 December 2018 Operating Corp., Supplemental Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ET 18-0029, (WCGS) - Results of the Twenty First Steam Generator Tube Inservice Inspection2018-10-31031 October 2018 (WCGS) - Results of the Twenty First Steam Generator Tube Inservice Inspection ET 18-0018, Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-06-19019 June 2018 Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ET 18-0016, Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools Request for Supplemental Information2018-05-29029 May 2018 Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools Request for Supplemental Information ET 18-0014, Response to Request for Additional Information Regarding the License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System.2018-05-29029 May 2018 Response to Request for Additional Information Regarding the License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System. ET 18-0013, Relief Request Number I4R-06, Request for Relief from ASME Code Case N-729-4 for Reactor Vessel Head Penetration Nozzle Weld2018-05-0202 May 2018 Relief Request Number I4R-06, Request for Relief from ASME Code Case N-729-4 for Reactor Vessel Head Penetration Nozzle Weld ET 18-0011, (WCGS) - Guarantee of Payment of Deferred Premiums2018-04-30030 April 2018 (WCGS) - Guarantee of Payment of Deferred Premiums ET 18-0012, Operating Corp., Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-04-19019 April 2018 Operating Corp., Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ET 18-0010, Financial Protection Levels2018-03-29029 March 2018 Financial Protection Levels ET 18-0007, Supplement to License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System.2018-02-15015 February 2018 Supplement to License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System. ET 18-0005, Withdrawal of License Amendment Request for Revision to the Emergency Plan2018-02-0505 February 2018 Withdrawal of License Amendment Request for Revision to the Emergency Plan ET 18-0004, Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-01-29029 January 2018 Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ET 17-0025, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term2017-11-14014 November 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term 2023-05-17
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARET 23-0004, Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements2023-01-26026 January 2023 Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ET 22-0012, Supplement to License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating2022-07-12012 July 2022 Supplement to License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating ET 22-0005, Response to Request for Additional Information Regarding License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating2022-04-13013 April 2022 Response to Request for Additional Information Regarding License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating ET 22-0004, Operating Corp - Response to Request for Confirmation of Information (RCI) Regarding Steam Generator Tube Inspection Report2022-03-15015 March 2022 Operating Corp - Response to Request for Confirmation of Information (RCI) Regarding Steam Generator Tube Inspection Report ET 21-0017, Response to Request for Additional Information Regarding License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation2021-12-22022 December 2021 Response to Request for Additional Information Regarding License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ET 21-0012, Supplement to License Amendment Request for a Risk-Informed Resolution to GSI-1912021-10-11011 October 2021 Supplement to License Amendment Request for a Risk-Informed Resolution to GSI-191 ML21168A1102021-06-0707 June 2021 4, Response to Request for Additional Information (RAI) ET 20-0013, Response to Request for Additional Information Re Application for Technical Specification Change Re Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program (TSTF-415)2020-10-26026 October 2020 Response to Request for Additional Information Re Application for Technical Specification Change Re Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program (TSTF-415) ET 20-0002, Response to Request for Additional Information Regarding Utilizing Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 12020-01-29029 January 2020 Response to Request for Additional Information Regarding Utilizing Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 1 ET 19-0021, Errata for Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation2019-12-0909 December 2019 Errata for Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation ET 19-0020, Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation2019-11-13013 November 2019 Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation ET 19-0019, Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation.2019-09-10010 September 2019 Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation. ML19092A0932019-03-11011 March 2019 Revision 32 to Updated Safety Analysis Report. Responses to NRC Questions 005.1 Through 031.20 ML19070A1162019-03-0505 March 2019 Westinghouse, Responses to NRC Request for Additional Information Documented in ADAMS Accession No. ML 18270A094 on the Core Design and Safety Analyses Methodology Transition Program ET 18-0035, Operating Corp., Supplemental Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-12-0606 December 2018 Operating Corp., Supplemental Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ML18331A2562018-11-19019 November 2018 Operating Corporation (Wcnoc), Unit 1 - Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Revision to the Emergency Plan ET 18-0014, Response to Request for Additional Information Regarding the License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System.2018-05-29029 May 2018 Response to Request for Additional Information Regarding the License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System. ML18114A1162018-04-19019 April 2018 SAP-18-34, Supplemental 30 Day Responses to NRC Request for Additional Information Regarding Wolf Creek Generating Station Transition to Westinghouse Safety Analysis and Alternate Source Term Methodologies. ET 18-0004, Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-01-29029 January 2018 Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term WO 18-0004, Response to Request for Additional Information Re License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of ...2018-01-15015 January 2018 Response to Request for Additional Information Re License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of ... ET 17-0025, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term2017-11-14014 November 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term ET 17-0024, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term2017-10-18018 October 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term ET 17-0016, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses2017-07-13013 July 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses ML17171A2332017-06-12012 June 2017 Response to Request for FLEX Audit Documentation ET 17-0011, Response to Supplemental Information Needed for Acceptance of Requested Licensing Action Transition to Westinghouse Core Design and Safety Analyses2017-05-0404 May 2017 Response to Supplemental Information Needed for Acceptance of Requested Licensing Action Transition to Westinghouse Core Design and Safety Analyses WO 17-0042, Operating Corporation Supplement to RAI Response Regarding Adopting New EAL Scheme2017-04-26026 April 2017 Operating Corporation Supplement to RAI Response Regarding Adopting New EAL Scheme ML17123A2022017-04-26026 April 2017 Enclosure to WO 17-0042 - WCNOC EAL Technical Basis Document WO 17-0013, Response to Request for Additional Information Regarding License Amendment Request for Adopting Revised Emergency Action Level Scheme2017-03-16016 March 2017 Response to Request for Additional Information Regarding License Amendment Request for Adopting Revised Emergency Action Level Scheme ET 17-0003, Operating Corporation'S Compliance Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Final Integrated Plan2017-01-19019 January 2017 Operating Corporation'S Compliance Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Final Integrated Plan ML17054C2292017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Responses to NRC RAIs on August 2013 Methodology Transition LAR Submittal ET 16-0036, Response to Request for Additional Information Regarding 10 CFR 50.55a Requests 13R-14 and 13R-152016-12-12012 December 2016 Response to Request for Additional Information Regarding 10 CFR 50.55a Requests 13R-14 and 13R-15 ET 16-0034, Operating Corporation - Response to Request for Additional Information Regarding 10 CFR 50.55a Request I3R-132016-11-30030 November 2016 Operating Corporation - Response to Request for Additional Information Regarding 10 CFR 50.55a Request I3R-13 ET 16-0031, Response to Request for Additional Information Related to Relief Request Number 14R-03, Request for Relief from Paragraph-3200(b) of ASME Code Case N-729-1 for Reactor Vessel Head Penetration Nozzle Welds2016-11-0404 November 2016 Response to Request for Additional Information Related to Relief Request Number 14R-03, Request for Relief from Paragraph-3200(b) of ASME Code Case N-729-1 for Reactor Vessel Head Penetration Nozzle Welds ET 16-0024, Response to NRC Generic Letter 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools.2016-11-0202 November 2016 Response to NRC Generic Letter 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. ET 16-0026, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2016-11-0101 November 2016 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ET 16-0028, Response to Request for Additional Information Re Relief Request Number I4R-03 for Reactor Vessel Head Penetration Nozzle Welds2016-10-20020 October 2016 Response to Request for Additional Information Re Relief Request Number I4R-03 for Reactor Vessel Head Penetration Nozzle Welds WM 16-0008, Wolf Creek Generating Station, Redacted Version of Revision 29 to Updated Safety Analysis Report, Response to NRC Questions2016-05-31031 May 2016 Wolf Creek Generating Station, Redacted Version of Revision 29 to Updated Safety Analysis Report, Response to NRC Questions ML16204A0132016-05-31031 May 2016 Redacted Version of Revision 29 to Updated Safety Analysis Report, Response to NRC Questions ET 16-0016, Response to Request for Additional Information Re License Amendment Request to Allow Use of Optimized Zirlo2016-05-19019 May 2016 Response to Request for Additional Information Re License Amendment Request to Allow Use of Optimized Zirlo ET 16-0009, Response to Request for Additional Information Regarding Flood Hazard Reevaluation Report, Revision 12016-02-23023 February 2016 Response to Request for Additional Information Regarding Flood Hazard Reevaluation Report, Revision 1 WO 16-0003, Responses to Request for Information, Per 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2016-01-18018 January 2016 Responses to Request for Information, Per 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ET 15-0026, Response to Request for Additional Information Regarding the Expedited Seismic Evaluation Process Report2015-11-11011 November 2015 Response to Request for Additional Information Regarding the Expedited Seismic Evaluation Process Report ET 15-0015, Response to Request for Additional Information Regarding Expedited Seismic Evaluation Process (ESEP) Report2015-06-24024 June 2015 Response to Request for Additional Information Regarding Expedited Seismic Evaluation Process (ESEP) Report 2023-01-26
[Table view] |
Text
Wo If Cree k-v~T~11J--
Nuclear Operating Corporation Stephen L. Smith Engineering Vice President October 11, 2021 ET 21-0012 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
References:
- 1) Letter ET 21-0005, dated August 12, 2021, from S. L. Smith, WCNOC, to USNRC
- 2) Letter dated September 23, 2021, from S. S. Lee, USNRC, to C. Reasoner, WCNOC
Subject:
Docket No. 50-482: Supplement to License Amendment Request for a Risk-Informed Resolution to GSI-191 Commissioners and Staff:
Reference 1 provided a license amendment request (LAR) that proposed a risk-informed resolution to GSI-191 for the Wolf Creek Generating Station (WCGS). Additionally, Wolf Creek Nuclear Operating Corporation (WCNOC) requested an exemption from certain requirements in Section 50.46(a)(1) of Title 10 of the Code of Federal Regulations (10 CFR) in accordance with the provisions of 10 CFR 50.12, Specific exemptions. During the acceptance review process, Nuclear Regulatory Commission (NRC) staff identified that more information was necessary to enable the NRC to accept this LAR for detailed review. Reference 2 provided the request for supplemental information from the NRC. A clarification call between WCNOC personnel and NRC staff occurred on September 23, 2021, to discuss the information requested.
The Attachment to this submittal provides the supplemental information requested by the NRC to complete the acceptance review process for this LAR.
The supplemental information provided in the Attachment does not impact the conclusions of the No Significant Hazards Consideration provided in Reference 1. In accordance with 10 CFR 50.91, Notice for public comment; State consultation, a copy of this supplement is being provided to the designated Kansas State official.
P.O. Box 411 l Burlington, KS 66839 l 620-364-8831
ET 21-0012 Page 2 of 3 This letter contains no commitments. If you have any questions concerning this matter, please contact me at (620) 364-4093, or Ron Benham at (620) 364-4204.
Sincerely, Stephen L. Smith SLS/rlt Attachments: Supplement to License Amendment Request for a Risk-Informed Resolution to GSI-191 cc: S. S. Lee (NRC), w/a S. A. Morris, (NRC), w/a N. OKeefe (NRC), w/a K. S. Steves (KDHE), w/a Senior Resident Inspector (NRC), w/a
ET 21-0012 Page 3 of 3 STATE OF KANSAS )
) ss COUNTY OF COFFEY )
Stephen L. Smith, of lawful age, being first duly sworn upon oath says that he is Vice President Engineering of Wolf Creek Nuclear Operating Corporation; that he has read the foregoing document and knows the contents thereof; that he has executed the same for and on behalf of said Corporation with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.
By_
dX~ - - -
Stephen L. Smith Vice President Engineering SUBSCRIBED and sworn to before me this 11th day of October , 2021.
RHONDA L. TIEMEYER Notary Public, State of Kansas Notary Public My Appointment Expires r I Expiration Date Jo/nua~ Ji) c1,,()d d-.
Attachment to ET 21-0012 Page 1 of 6 Supplement to License Amendment Request for a Risk-Informed Resolution to GSI-191 Reference 1 provided a license amendment request (LAR) that proposed a risk-informed resolution to GSI-191 for the Wolf Creek Generating Station (WCGS). Additionally, Wolf Creek Nuclear Operating Corporation (WCNOC) requested an exemption from certain requirements in Section 50.46(a)(1) of Title 10 of the Code of Federal Regulations (10 CFR) in accordance with the provisions of 10 CFR 50.12, Specific exemptions. During the acceptance review process, Nuclear Regulatory Commission (NRC) staff identified that more information was necessary to enable the NRC to accept this LAR for detailed review. Reference 2 provided the request for supplemental information from the NRC.
This attachment provides a discussion to address concerns related to the fire probabilistic risk assessment (PRA) model numbers presented in Reference 1. Following that discussion, specific NRC requests along with WCNOC responses are provided.
The risk evaluation done in support of this LAR was completed prior to WCNOC having final fire PRA information beyond the scope of the WCGS IPEEE. The risk evaluation included initial fire PRA quantification results before any significant refinements to the model had been incorporated.
These quantification numbers in no way are expected to represent the as-built and as-operated plant and are bounding. The main purpose for the quantification of the fire PRA at that time was to identify and prioritize aspects of the model requiring refinement. WCNOC continues to develop a fire PRA model for use in future risk-informed applications and has planned a peer review of the fire PRA model to occur the week of November 1, 2021. Final peer review results are expected early 2022.
At the time of the risk evaluation, it was understood that the fire PRA numbers were very high due to significant conservatisms inherent to the modeling. The understanding and expectation was that model refinements would result in significant reduction in both core damage frequency (CDF) and large early release frequency (LERF) numbers. However, because the fire PRA model does not have any effect on the quantitative results from the risk-informed GSI-191 evaluation, WCNOC did not see any reason to postpone developing the risk evaluation supporting the LAR until after the fire PRA was complete. RG 1.174 states that if the calculated values of CDF and LERF are very small, as defined by Region III in Figures 4 and 5, a detailed quantitative assessment of the base values of CDF and LERF is not necessary. However, for completeness, the baseline CDF and LERF values from all modeled hazards were included in the submittal, along with an explanation that the fire PRA was not finalized, and that those values were expected to decrease.
Table 3 in Attachment VII of the original LAR submittal provides a summary of the CDF and LERF calculations for each of the evaluated hazards. The three hazards that contribute to the GSI-191 risk quantification are pipe/non-pipe break loss of coolant accidents (LOCAs), secondary side breaks, and seismically induced LOCAs. The contribution from each of these hazards is less than 1E-6. If the contributions from the hazards are summed together, the value is 1.4E-6, which is slightly above the RG 1.174 Region III guideline for CDF. However, as stated in RG 1.174:
These guidelines are intended to provide assurance that proposed increases in CDF and LERF are small and are consistent with the intent of the Commissions Safety Goal Policy Statement. As indicated in the footnote to Figures 4 and 5, the boundaries between regions are not definitive. In applying these guidelines, it is
Attachment to ET 21-0012 Page 2 of 6 particularly important to recognize that the risk metrics calculated using PRA models are a function of the assumptions and approximations made in the development of those models. This is particularly important when the results from PRA models for multiple hazard groups are combined, since the results from some hazard groups, depending on the state of practice, may be conservatively or nonconservatively biased.
The calculations performed for each of the three hazards that contribute to the risk quantification in the submittal were conservatively biased based on the methodology used. These conservatisms are described in the submittal and a paragraph included below Table 3 explaining that because bounding methods were used for the evaluation, the CDF and LERF values were not added together. Based on the information provided in the submittal, including the methods and conservatisms used for the risk quantification, there is a strong basis for concluding that the risk associated with the effects of debris at WCGS is very small.
The following discussion provides the NRC staffs specific requests for supplemental information and WCNOCs responses (specific NRC requests in italics).
NRC Request 1:
Justification supporting the claim that the CDF and LERF values are expected to decrease, including the anticipated extent of the decrease, details of the existing fire PRA model conservatisms and non-conservatisms on the PRA results as presented in the application, any plant modifications affecting potential fire risk, and details of the new fire PRA model, current status, and schedule for finalization.
WCNOC Supplemental Information for Request 1:
At the time of submitting this supplemental information, WCGS does not have a fire PRA model-of-record and still relies on the IPEEE for fire insights as necessary. A peer review of the developed fire model is scheduled for the week of November 1, 2021. Following any necessary resolution of facts and observations from the peer review, WCNOC intends to issue the resulting fire model as the initial Fire PRA model-of-record in early 2022. The early draft model used as input for the GSI-191 LAR submittal was dated May 2019. In 2019, the Fire PRA model was initially quantified with risk values of CDF = 5.49E-04 and LERF = 1.33E-05.
The WCGS fire PRA model has been developed in accordance with ASME-ANS RA-Sa-2009, Part 4 (Fire PRAs At-Power). The methodology used to create the Fire PRA model is in alignment with the following tasks from NUREG/CR-6850 (EPRI-1011989).
Task 1 - Plant Boundary Definition and Partitioning (PP)
Task 2 - Fire PRA Components Selection (ES)
Task 3 - Fire PRA Cable Selection (CS)
Task 5 - Fire-Induced Risk Model (PRM)
Task 6 - Fire Ignition Frequencies (IGN)
Tasks 8 & 11 - Scoping and Detailed Fire Modeling (FSS)
Task 9 - Detailed Circuit Failure Analysis (CF)
Task 10 - Circuit Failure Mode Likelihood Analysis (CFMLA)
Task 12 - Post-Fire Human Reliability Analysis (HRA)
Task 14 - Fire Risk Quantification (FQ)
Task 15 - Uncertainty and Sensitivity Analysis (UNC)
Attachment to ET 21-0012 Page 3 of 6 Since 2019 the WCGS Fire PRA model has been refined to achieve more realistic risk results.
The refinements included verifying and updating (as necessary) fire PRA inputs, incorporating the latest industry guidance, performing additional cable and component selection, and refining model conservatisms.
Examples of recently published industry guidance which has been incorporated into the WCGS Fire PRA model since 2019 include:
- Multiple Fire PRA related Frequently Asked Questions (FAQs)
Examples of model refinements incorporated to reduce prior conservatisms include:
- Use of more sophisticated fire modeling tools (i.e., CFAST and FDS) in high risk fire compartments such as the cable spreading rooms and the main control room.
- IEEE-383 cable qualification analysis to remove the assumption that all cables are unqualified.
- Refinement of fire scenario severity factors, fire growths, suppression and detection credit, and target sets.
- Additional cable selection to remove components from the assumed failures list.
- Fault tree and HRA refinements to allow the risk model to realistically represent the as-built as-operated plant.
- Application of FAQ 08-0047 to updated spurious failure probabilities.
WCNOC did not incorporate any explicit plant modification for the purposes of reducing fire PRA risk numbers. Several modifications that were previously incorporated to reduce overall plant risk (and are accordingly accounted in the existing PRA modeling) include Station Blackout Diesels, a non-safety auxiliary feedwater pump, and the Shield reactor coolant pump (RCP) seals.
The current quantified fire model CDF and LERF values, that will be peer reviewed, are CDF =
2.67E-05 and LERF = 1.11E-06. Replacing the originally reported CDF and LERF values for fire in Table 1 of Attachment VII of the original LAR submittal results in the following:
PRA Model CDF (yr-1) LERF (yr-1)
Internal Events 7.25E-06 7.31E-08 Internal Flood 9.06E-06 3.77E-08 Internal Fire* 2.67E-05 1.11E-06 High Winds* 3.40E-06 7.98E-09 Total 4.64E-05 1.23E-06
- NOTE: As previously discussed, the Internal Fire model has not yet been incorporated as a model-of-record. Similarly, the High Winds model, though peer reviewed, has not been incorporated as a model-of-record due to overly conservative modeling.
While additional refinements to the fire PRA model have been identified and are planned for future implementation in the model, current results show that the risk associated with internal fires is well within the Commissions Safety Goals embedded in the RG 1.174 guidelines.
Attachment to ET 21-0012 Page 4 of 6 NRC Request 2:
Discussion of whether ways to reduce baseline CDF and LERF, consistent with the guidance in RG 1.174, have been identified, and the associated implementation schedule, or justification why such steps are unnecessary.
WCNOC Supplemental Information for Request 2:
As discussed above in WCNOC Supplemental Information for Request 1, significant fire PRA model refinement has been made to reduce the baseline CDF and LERF. Though the quantified fire model has not been peer reviewed and is not a model-of-record, current values are now within the RG 1.174 guidelines.
NRC Request 3:
Justification that the margins from the Commissions Safety Goals embedded in the 10-4 per reactor year and 10-5 per reactor year guidelines for CDF and LERF in RG 1.174, respectively, are maintained based on the baseline CDF and LERF values described in the application. Provide any actions and an implementation schedule to maintain the margins if necessary.
WCNOC Supplemental Information for Request 3:
As demonstrated above in WCNOC Supplemental Information for Request 1, the current CDF and LERF values are within the RG 1.174 guidelines. Though the quantified fire model has not been peer reviewed and is not a model-of-record, CDF/LERF values reflect sufficient margin to the RG 1.174 total CDF/LERF numbers. Additionally, further refinements to the fire PRA model have been identified and will be incorporated in future updates as appropriate.
NRC Request 4:
Justification that the total change in risk remains within Region III of RG 1.174 after aggregating the change in risk from the different contributors listed in Table 3 of the application.
WCNOC Supplemental Information for Request 4:
Aggregating the change in risk from all contributors shown in Table 3 of the LAR Attachment VII would result in a CDF value slightly higher than the RG 1.174 Region III guideline (CDF < 1E-6).
Hazard CDF (yr-1) LERF (yr-1)
Piping and Non-Piping LOCAs 6.6E-07 1.9E-11 Water Hammer Induced LOCAs 0.0 0.0 Secondary Side Breaks 6.5E-08 1.1E-10 Fire Induced LOCAs 0.0 0.0 Seismically Induced LOCAs 6.9E-07 2.0E-11 Other External Hazards 0.0 0.0 As discussed in RG 1.174, if the assessments of the risk implications from different hazard groups must be combined, it is important to understand the relative level of realism associated with the modeling of each of the hazard groups.
Attachment to ET 21-0012 Page 5 of 6 For WCGS, using aggregated risk metrics does not provide a realistic picture of the true risk associated with the effects of debris on strainer performance, because each of the three contributing hazards was evaluated in a bounding manner. The key conservatisms include the following items:
- Competing conservatisms were used in the GSI-191 evaluation (e.g., a conservatively high sump temperature was used for calculations where a maximum temperature is bounding, and a conservatively low sump temperature was used for calculations where a minimum temperature is bounding). Many breaks that are currently predicted to fail would be likely not to fail if all calculations were performed with consistent inputs (e.g., using a consistent temperature for all parts of the GSI-191 evaluation would significantly reduce the level of conservatism and the number of breaks that fail).
- A single, bounding threshold break size was determined for all equipment configurations without taking credit for the fact that the most likely equipment configuration (all pumps running) would have a larger threshold break size. Taking credit for the probability of the various equipment configurations along with the associated threshold break sizes would significantly reduce CDF and LERF.
- All breaks greater than or equal to the threshold break size were assumed to fail even though all of the breaks at the threshold break size and many of the larger breaks would not fail. Taking credit for the successful mitigation of breaks larger than or equal to the threshold break size that do not fail would significantly reduce the conditional failure probability and the corresponding CDF and LERF.
- All secondary side break scenarios that require ECCS strainer recirculation were assumed to fail due to the effects of debris, even though most (if not all) secondary side breaks would be successfully mitigated due to the relatively low strainer flow rates and debris loads for these scenarios.
- The risk contribution for seismically induced LOCAs was assumed to be equal to the large LOCA frequency. This is a very conservative assumption because it includes breaks that are smaller than the threshold break size as well as larger breaks that would not generate enough debris to fail the acceptance criteria.
In section C.2.5 of RG 1.174 it states the following:
In the context of integrated decisionmaking, the acceptance guidelines should not be interpreted as being overly prescriptive. They are intended to give a numerical indication of what is considered acceptable. The lines between the regions are intentionally blurry to indicate that the NRC has discretion when making licensing decisions involving the risk acceptance guidelines. Thus, the numerical values associated with defining the regions in Figures 4 and 5 of this RG are approximate values indicating changes that are generally acceptable.
Later in C.2.5 of RG 1.174 discussion with regard to aggregation of risk from different hazards implies that it may be better not to combine contributors from different hazards if there is a significant level of conservatism associated with some hazards. This is the case for the WCGS GSI-191 risk quantification since all three contributors were evaluated using bounding methods that significantly skew the results toward higher increases of CDF and LERF. Based on this understanding, WCNOC asserts it is better not to aggregate the risk contributors since this would give the false understanding that the risk associated with GSI-191 is in Region II rather than
Attachment to ET 21-0012 Page 6 of 6 Region III. A refined risk assessment would show that each of the three contributors are significantly lower than the values presented in the submittal.
The information included in the LAR submittal provides strong justification that the risk associated with the effects of debris at WCGS are very small, as defined by RG 1.174 Region III.
REFERENCES:
- 1. WCNOC Letter ET 21-0005 from S. L. Smith to USNRC, License Amendment Request for a Risk-Informed Resolution to GSI-191, August 12, 2021. ADAMS Accession No. ML21224A118
- 2. Letter from S. S. Lee, USNRC, to C. Reasoner, WCNOC, Wolf Creek Generating Station, Unit 1 - Supplemental Information Needed for Acceptance of Requested Licensing Actions RE: License Amendment and Regulatory Exemption for a Risk-Informed Approach to Address Generic Safety Issue 191 and Respond to Generic Letter 2004-02 (EPID L-2021-LLA-0152 and EPID L-2021-LLE-0039), September 23, 2021. ADAMS Accession No. ML21253A090