ML21274A026

From kanterella
Jump to navigation Jump to search
Corrective Action Plan Corrective Actions Required Post-startup
ML21274A026
Person / Time
Site: National Bureau of Standards Reactor
Issue date: 09/30/2021
From:
US Dept of Commerce, National Institute of Standards & Technology (NIST)
To:
Office of Nuclear Reactor Regulation
Shared Package
ML21274A018 List:
References
Download: ML21274A026 (2)


Text

Corrective Action Plan September 30, 2021 Corrective Actions Required Post-startup SEC report reference Corrective action comments MS-CA-1 Change management framework Change management framework to identify gaps and areas for improvement Framework being put together.

Hiring of ARM in progress.

MS-CA-2 Develop system for knowledge and skills management in the presence of personnel attrition Organizational and training system changes; plan for establishing a 5th shift Procedures rewrite in progress.

5th shift recruitment begun.

MS-SPI-1 CRO transitions Permanent CRO appointed; succession planning Permanent appointment in progress. Deputy CRO position to be posted in Fall 2021.

MS-SPI-2 Crew Chief path Clearly define career path, implement leadership and development training Leadership training begun.

Career path definition in progress.

MS-SPI-3 RO/RE communications Develop effective means of communications among groups Under development.

MS-CA-3, IE-SPI-2 Assess efficacy of tools Develop methodology for assessing changes Determine whether pickup tools need to be replaced; require manufacturer to provide accurate dimension reports November (administrative controls for reactor restart)

Q4 2022 (Batch tool replacement with QA)

MS-CA-4 ARM program Hire ARM chief; develop program emphasizing communications Hiring in progress.

MS-SPI-4 engineered items management Develop systems for collaborative management with RO and RE.

Under development.

MS-SPI-5 management engagement Implement MP 1.2; increase management engagement October completion of MP 1.2.

Management engagement has increased.

MS-CA-7 Continuous improvement plan Implement AR 1.1; Preventative action program; continuous improvement training AR 1.1 implemented, Training complete, preventative action program in progress.

MS-SPI-7 SAC tracking Establish corrective and preventive action SEC subcommittee Subcommittee charter has been drafted and members appointed.

PR-CA-6: Revise procedures to be consistent with INPO 11-003.

Continue to revise procedures beyond those necessary for startup.

Procedures to be identified and prioritized.

QT-CA-4, QT-SPI-1 QT-SPI-2, QT-SPI-3 consistent training, expectation, learning objectives, continuous evaluation Establish routine reviews of training program, including continuous evaluation and feedback to meet performance expectations.

In progress.

IE-CA-6 modify refueling test stand Modify refueling test stand to better simulate reactor top experience.

Under engineering evaluation.

IE-SPI-1 Explore early detection of abnormal behavior Provide noise gates on selected NI channels; explore other anomaly detection Initial noise gate to be installed and tested after startup.