ML21265A304
ML21265A304 | |
Person / Time | |
---|---|
Site: | Byron |
Issue date: | 09/22/2021 |
From: | Patricia Pelke NRC/RGN-III/DRS/OLB |
To: | Rhoades D Exelon Generation Co |
Roach G | |
Shared Package | |
ML21055A848 | List: |
References | |
Download: ML21265A304 (2) | |
Similar Documents at Byron | |
---|---|
Category:Letter
MONTHYEARRS-24-104, Nuclear Radiological Emergency Plan Document Revision2024-11-0101 November 2024
[Table view]Nuclear Radiological Emergency Plan Document Revision RS-24-098, Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality2024-10-23023 October 2024 Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality ML24297A2702024-10-23023 October 2024 Notification of NRC Baseline Inspection and Request for Information: Inspection Report 05000455/2025002 RS-24-095, Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals2024-10-10010 October 2024 Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24281A1502024-10-0707 October 2024 Request for Information for NRC Commercial Grade Dedication Inspection Report 05000454/2025010 and 05000455/2025010 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A1272024-09-23023 September 2024 – Request for Additional Information (EPID 2023-LLA-0136) - Non-Proprietary BYRON 2024-0046, Cycle 27 Core Operating Limits Report2024-09-19019 September 2024 Cycle 27 Core Operating Limits Report RS-24-088, Relief Requests Associated with the Fifth Inservice Inspection Interval2024-09-13013 September 2024 Relief Requests Associated with the Fifth Inservice Inspection Interval ML24250A1182024-09-0606 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information 05000454/LER-2024-001, Both Trains of Control Room Ventilation Temperature Control System Inoperable2024-09-0505 September 2024 Both Trains of Control Room Ventilation Temperature Control System Inoperable ML24227A0522024-08-29029 August 2024 Audit Plan for LAR to Remove ATWS Mtc Limit IR 05000454/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Byron Station, Units 1 and 2 (Report 05000455/2024005 and 05000454/2024005) ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000454/20240112024-08-0808 August 2024 Phase 2 Post- Approval License Renewal Report 05000454/2024011 IR 05000454/20240022024-07-26026 July 2024 Integrated Inspection Report 05000454/2024002 and 05000455/2024002, and Exercise of Enforcement Discretion ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) RS-24-064, Nuclear Radiological Emergency Plan Document Revisions2024-06-28028 June 2024 Nuclear Radiological Emergency Plan Document Revisions RS-24-066, Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller2024-06-25025 June 2024 Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller ML24170A7652024-06-19019 June 2024 Confirmation of Initial License Examination RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations RS-24-044, License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed2024-05-28028 May 2024 License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed RS-24-043, Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications2024-05-24024 May 2024 Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report BYRON 2024-0031, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-05-16016 May 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation IR 05000454/20240012024-05-10010 May 2024 Integrated Inspection Report 05000454/2024001; 05000455/2024001 and 07200068/2024001 BYRON 2024-0028, Annual Radiological Environmental Operating Report (AREOR)2024-05-0909 May 2024 Annual Radiological Environmental Operating Report (AREOR) BYRON 2024-0022, 2023 Regulatory Commitment Change Summary Report2024-05-0202 May 2024 2023 Regulatory Commitment Change Summary Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-026, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR)2024-04-25025 April 2024 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML24116A1192024-04-25025 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) ML24113A1272024-04-22022 April 2024 Audit Plan in Support of Review of LAR Revision of TS 3.7.15, 3.7.16, and 4.3.1 (EPID: L-2023-LLA-0136) (Non-Proprietary) ML24113A2892024-04-22022 April 2024 Notification of NRC Baseline Inspection and Request for Information BYRON 2024-0020, Annual Dose Report for 20232024-04-18018 April 2024 Annual Dose Report for 2023 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition BYRON 2024-0021, Registration of Use of Cask to Store Spent Fuel2024-04-11011 April 2024 Registration of Use of Cask to Store Spent Fuel RS-24-034, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-04-10010 April 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors IR 05000454/20244012024-04-0303 April 2024 Cyber Security Inspection Report 05000454/2024401 and 05000455/2024401 (Public) RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report BYRON 2024-0019, Registration of Use of Cask to Store Spent Fuel2024-03-28028 March 2024 Registration of Use of Cask to Store Spent Fuel RS-24-024, Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-03-22022 March 2024 Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds IR 05000454/20230112024-03-20020 March 2024 Fire Protection Team Inspection Report 05000454/2023011 and 05000455/2023011 IR 05000454/20240102024-03-15015 March 2024 Comprehensive Engineering Team Inspection Report 05000454/2024010 and 05000455/2024010 IR 05000454/20230062024-02-28028 February 2024 Annual Assessment Letter for Byron Station, Units 1 and 2 (Report 05000455/2023006 and 05000454/2023006) IR 05000454/20230042024-02-0202 February 2024 Integrated Inspection Report 05000454/2023004 and 05000455/2023004 ML24022A2722024-01-23023 January 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000454/2024011 ML24018A0362024-01-17017 January 2024 Paragon Energy Solutions, Defect with Detroit Diesel/Mtu Fuel Injectors P/N R5229660 Cat Id 0001390618 2024-09-06 Category:License-Operator MONTHYEARML24170A7652024-06-19019 June 2024
[Table view]Confirmation of Initial License Examination ML23325A0502023-11-13013 November 2023 Form 2.1-1, Examination Preparation Checklist (Byron 2023) ML23339A0182023-11-13013 November 2023 Form 1.3-1, Examination Security Agreement (Byron Ile 2023) ML23339A0232023-11-13013 November 2023 Form 5.1-1 Post Examination Check Sheet (Byron 2023) ML23325A0492023-11-0909 November 2023 Letter 2023-0062 - Post Exam Submittal ML23278A0272023-10-0505 October 2023 Operator Licensing Examination Approval - Byron Station, October 2023 ML23325A0262023-10-0404 October 2023 Form 2.3-2 Operating Test Quality Checklist (Byron 2023 Ile) ML23325A0302023-10-0404 October 2023 Form 2.3-4 Written Examination Quality Checklist (Byron 2023 Ile) ML23325A0252023-08-0909 August 2023 0041 NRC ML23325A0232023-08-0202 August 2023 Submittal of Integrated Initial License Training Examination Materials RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23325A0102023-05-31031 May 2023 Form 2.3-1 Examination Outline Quality Checklist (Byron 2023 Ile) ML23325A0112023-05-31031 May 2023 Form 3.4-1 Events and Evolutions Checklist (Byron 2023 Ile) ML23150A1712023-05-30030 May 2023 Form 5.1-1 Post Exam Check Sheet BYRON 2023-0026, Ile Oct 2023 Exam Outline Ltr2023-05-18018 May 2023 Ile Oct 2023 Exam Outline Ltr ML23065A2952023-03-10010 March 2023 Confirmation of Initial License Examination IR 05000454/20223012023-03-0707 March 2023 NRC Initial License Examination Report 05000454/2022301 and 05000455/2022301 ML23146A0482023-02-27027 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23150A1702023-02-27027 February 2023 Form 2.1-1 Exam Prep Checklist Byron 2022 ML23145A2352023-02-27027 February 2023 Form 1.3-1 Exam Security Agreement - Signed Off ML23146A0462023-02-27027 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23145A2282023-01-0606 January 2023 Letter 2023-0001 Post Exam Package ML22343A2172022-12-12012 December 2022 Operator Licensing Examination Approval - Byron Station, December 2022 ML23150A1572022-12-0808 December 2022 Form 3.4-1 Combined ML23150A1432022-12-0808 December 2022 Form 2.3-1 Exam Outline Quality Checklist BYRON 2022-0064, Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed)2022-09-28028 September 2022 Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed) ML22102A1232022-04-19019 April 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000454/20213012021-12-17017 December 2021 NRC Initial License Examination Report 05000454/2021301; 05000455/2021301 ML21361A1732021-10-28028 October 2021 Proposed Sim JPM BYRON 2021-0033, Submittal on Initial Operator Licensing Examination Outline2021-10-28028 October 2021 Submittal on Initial Operator Licensing Examination Outline ML21361A1692021-10-28028 October 2021 Proposed Scenarios ML21361A1162021-10-28028 October 2021 ES-301-3 ML21356B7332021-10-28028 October 2021 ES-403-1 ML21361A1592021-10-28028 October 2021 Proposed RO Admin JPM ML21361A1242021-10-28028 October 2021 ES-301-4 ML21361A1262021-10-28028 October 2021 ES-301-6 ML21361A1572021-10-28028 October 2021 Proposed in Plant JPM ML21361A1072021-10-28028 October 2021 2021-301 Byron NRC Exam Submittal Letter ML21361A0292021-10-28028 October 2021 Pre Exam ES-201-3 ML21356B7242021-10-28028 October 2021 Ile Outline Review Comments Response ML21361A2732021-10-28028 October 2021 ES-201-2 BYRON 2021-0072, Post Exam Submittal Letter2021-10-28028 October 2021 Post Exam Submittal Letter ML21361A2712021-10-28028 October 2021 ES-201-2 Written Outline ML21361A1782021-10-28028 October 2021 Proposed Written Exam ML21361A0212021-10-28028 October 2021 Post Exam ES-201-3 ML21361A3312021-10-28028 October 2021 SRO Admin JPM ML21361A2752021-10-28028 October 2021 ES-301-5 ML21361A3252021-10-28028 October 2021 Scenarios ML21361A3322021-10-28028 October 2021 Written Exam 2024-06-19 Category:Part 55 Examination Related Material MONTHYEARML24170A7652024-06-19019 June 2024
[Table view]Confirmation of Initial License Examination ML23339A0182023-11-13013 November 2023 Form 1.3-1, Examination Security Agreement (Byron Ile 2023) ML23339A0232023-11-13013 November 2023 Form 5.1-1 Post Examination Check Sheet (Byron 2023) ML23325A0502023-11-13013 November 2023 Form 2.1-1, Examination Preparation Checklist (Byron 2023) ML23325A0492023-11-0909 November 2023 Letter 2023-0062 - Post Exam Submittal ML23278A0272023-10-0505 October 2023 Operator Licensing Examination Approval - Byron Station, October 2023 ML23325A0262023-10-0404 October 2023 Form 2.3-2 Operating Test Quality Checklist (Byron 2023 Ile) ML23325A0302023-10-0404 October 2023 Form 2.3-4 Written Examination Quality Checklist (Byron 2023 Ile) ML23325A0252023-08-0909 August 2023 0041 NRC ML23325A0232023-08-0202 August 2023 Submittal of Integrated Initial License Training Examination Materials RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23325A0102023-05-31031 May 2023 Form 2.3-1 Examination Outline Quality Checklist (Byron 2023 Ile) ML23325A0112023-05-31031 May 2023 Form 3.4-1 Events and Evolutions Checklist (Byron 2023 Ile) ML23150A1712023-05-30030 May 2023 Form 5.1-1 Post Exam Check Sheet BYRON 2023-0026, Ile Oct 2023 Exam Outline Ltr2023-05-18018 May 2023 Ile Oct 2023 Exam Outline Ltr ML23065A2952023-03-10010 March 2023 Confirmation of Initial License Examination IR 05000454/20223012023-03-0707 March 2023 NRC Initial License Examination Report 05000454/2022301 and 05000455/2022301 ML23146A0482023-02-27027 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23150A1702023-02-27027 February 2023 Form 2.1-1 Exam Prep Checklist Byron 2022 ML23146A0462023-02-27027 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23145A2352023-02-27027 February 2023 Form 1.3-1 Exam Security Agreement - Signed Off ML23145A2282023-01-0606 January 2023 Letter 2023-0001 Post Exam Package ML22343A2172022-12-12012 December 2022 Operator Licensing Examination Approval - Byron Station, December 2022 ML23150A1572022-12-0808 December 2022 Form 3.4-1 Combined ML23150A1432022-12-0808 December 2022 Form 2.3-1 Exam Outline Quality Checklist BYRON 2022-0064, Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed)2022-09-28028 September 2022 Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed) ML22102A1232022-04-19019 April 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000454/20213012021-12-17017 December 2021 NRC Initial License Examination Report 05000454/2021301; 05000455/2021301 ML21361A1072021-10-28028 October 2021 2021-301 Byron NRC Exam Submittal Letter BYRON 2021-0072, Post Exam Submittal Letter2021-10-28028 October 2021 Post Exam Submittal Letter ML21361A3322021-10-28028 October 2021 Written Exam ML21361A1782021-10-28028 October 2021 Proposed Written Exam ML21356B7332021-10-28028 October 2021 ES-403-1 ML21361A1572021-10-28028 October 2021 Proposed in Plant JPM ML21361A1772021-10-28028 October 2021 Proposed SRO Admin JPM ML21361A1262021-10-28028 October 2021 ES-301-6 ML21356B7322021-10-28028 October 2021 ES-201-1 ML21361A0292021-10-28028 October 2021 Pre Exam ES-201-3 ML21361A1692021-10-28028 October 2021 Proposed Scenarios ML21361A1592021-10-28028 October 2021 Proposed RO Admin JPM ML21356B7242021-10-28028 October 2021 Ile Outline Review Comments Response ML21361A3292021-10-28028 October 2021 Sim Job Performance Measure ML21361A2712021-10-28028 October 2021 ES-201-2 Written Outline ML21361A0212021-10-28028 October 2021 Post Exam ES-201-3 ML21361A3312021-10-28028 October 2021 SRO Admin JPM ML21361A1162021-10-28028 October 2021 ES-301-3 ML21356B7252021-10-28028 October 2021 ES-301-7 BYRON 2021-0033, Submittal on Initial Operator Licensing Examination Outline2021-10-28028 October 2021 Submittal on Initial Operator Licensing Examination Outline ML21361A2452021-10-28028 October 2021 ES-301-1 2024-06-19 |
Text
Mr. David Rhoades Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
OPERATOR LICENSING EXAMINATION APPROVAL
Dear Mr. Rhoades:
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Byron Station, Units 1 and 2.
The U.S. Nuclear Regulatory Commission (NRC) has approved the subject examinations and you may administer the written examinations in accordance with Revision 11, of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, during the week of October 11, 2021. The NRC staff will administer the operating tests during the weeks of September 27, 2021 and October 4, 2021. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility.
Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 630-829-9868.
Please contact your Chief Examiner, Mr. Greg Roach, at 630-829-9760, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
Sincerely, Patricia J. Pelke, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 cc: Distribution via LISTSERV Mr. Brian Lewin, Training ManagerSeptember 22, 2021 Signed by Pelke, Patricia on 09/22/21
Letter to David Rhoades from Patricia J. Pelke dated September 22, 2021.
SUBJECT:
OPERATOR LICENSING EXAMINATION APPROVAL