ML21260A135

From kanterella
Jump to navigation Jump to search
ISFSI Withdrawal of Licensing Actions Associated with the Scheduled Permanent Shut Down and Decommissioning of Units
Date released: 10/06/2021 Download: ML21260A135


ISFSI Withdrawal of Licensing Actions Associated with the Scheduled Permanent Shut Down and Decommissioning of Units (EPIDs L-2020-LLA-0215,L-2020-LLE-0156,L-2020-LLA-0238,L-2020-LLA-0240,L-2021-JLD-0004,L-2021-JLD-0005,L-2021-LRO-0041
ML21260A139
Person / Time
Site: Byron 
Issue date: 09/28/2021
From: Joel Wiebe
Plant Licensing Branch III
To: Rhoades D P
Exelon Generation Co
Wiebe J S
References
EPID L-2020-LLA-0215, EPID L-2020-LLA-0238, EPID L-2020-LLA-0240, EPID L-2020-LLE-0156, EPID L-2021-JLD-0004, EPID L-2021-JLD-0005, EPID L-2021-LRO-0041
Download: ML21260A139 (15)
Notice of Withdrawal of September 24, 2020, Application Administrative Controls for Permanently Defueled Condition (FRN)
ML21260A138
Person / Time
Site: Byron 
Issue date: 09/28/2021
From: Joel Wiebe
Plant Licensing Branch III
To: Rhoades D P
Exelon Generation Co
Wiebe J S
References
86 FR 54487; 10/01/2021, NRC-2020-0259
Download: ML21260A138 (3)
Notice of Withdrawal of November 2, 2020, Application Revision to Emergency Plan for Permanently Shut Down and Defueled Condition (FRN)
ML21260A137
Person / Time
Site: Byron 
Issue date: 09/28/2021
From: Joel Wiebe
Plant Licensing Branch III
To: Rhoades D P
Exelon Generation Co
Wiebe J S
References
86 FR 54490; 10/01/2021, NRC-2020-0275
Download: ML21260A137 (3)
Notice of Withdrawal of October 29, 2020, Application Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition (FRN)
ML21260A134
Person / Time
Site: Byron 
Issue date: 09/28/2021
From: Joel Wiebe
Plant Licensing Branch III
To:
Exelon Generation Co
Wiebe J S
References
7590-01-P, 86 FR 54489; 10/01/2021, L-2020-LLA-215, 238, 240, NRC-2020-0259, NRC-2020-0275
Download: ML21260A134 (3)