MONTHYEARML24289A0062024-10-21021 October 2024 Westinghouse Columbia Fuel Fabrication Facility Integrated Inspection Report 07001151/2024003 ML24110A0502024-04-22022 April 2024 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151/2024001 ML24023A6952024-01-26026 January 2024 Westinghouse Columbia Fuel Fabrication Facility, U.S. Nuclear Regulatory Commission Inspection Report Number 07001151/2023004 ML23296A0362023-10-24024 October 2023 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151/2023003 ML23256A1042023-09-14014 September 2023 Fuel Fabrication Facility Inspection Schedule for Calendar Year 2024 ML23202A1472023-07-24024 July 2023 Westinghouse Columbia Fuel Fabrication Facility Integrated Inspection Report 07001151/2023002 ML23115A2382023-04-26026 April 2023 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151/2023001 ML23024A2312023-01-30030 January 2023 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151//2022004 ML22200A2472022-07-20020 July 2022 Westinghouse Columbia Fuel Fabrication Facility 2022002 Final Report ML22104A1352022-04-18018 April 2022 Fuel Fabrication Facility - Integrated Inspection Report 07001151/2022001 ML22012A2382022-01-14014 January 2022 Westinghouse Columbia Fuel Fabrication Facility, U.S. Nuclear Regulatory Commission Inspection Report Number 70-1151/2021-004 ML21298A1812021-10-25025 October 2021 Fuel Fabrication Facility Integrated Inspection Report 07001151/2021003 ML21188A0272021-07-0707 July 2021 Westinghouse Electric Company Integrated Inspection Report 07001151/2021002 ML21116A1142021-04-26026 April 2021 Westinghouse Columbia Fuel Fabrication Facility, U.S. Nuclear Regulatory Commission Inspection Report Number 0701151/2021001 ML21022A1272021-01-21021 January 2021 Westinghouse Columbia Fuel Fabrication Facility, U.S. Nuclear Regulatory Commission Inspection Report Number 0701151/2020004 ML20295A5282020-10-21021 October 2020 Westinghouse Electric Co - NRC Integrated Inspection Report Number 07001151/2020-003 ML20189A1692020-07-0606 July 2020 Westinghouse Electric Company - Nuclear Regulatory Commission Integrated Inspection Report Number 70-1151/2020-002 ML20120A3952020-04-28028 April 2020 Westinghouse Electric Company - Nuclear Regulatory Commission Integrated Inspection Report Number 70-1151/2020-001 ML20071H5542020-03-11011 March 2020 Westinghouse - NRC Inspection Report 07001151/2020006 Confirmation of Implementation of Confirmatory Order EA-16-173 ML20028D9302020-01-28028 January 2020 Westinghouse Electric Company - Nuclear Regulatory Commission Integrated Inspection Report No. 70-1151/2019-005 ML19326C4532019-11-22022 November 2019 Westinghouse Electric Company - U.S. Nuclear Regulatory Commission Integrated Inspection Report Number 70-1151/2019-004 and Notice of Violation ML19212A6872019-07-31031 July 2019 Westinghouse Electric Company - Nuclear Regulatory Commission Integrated Inspection Report Number 70-1151/2019-003 ML19101A2742019-04-11011 April 2019 Westinghouse Electric Company - Nuclear Regulatory Commission Integrated Inspection Report No. 70-1151/2019-002 ML19023A3492019-01-23023 January 2019 Westinghouse Electric Co. - NRC Integrated Inspection Report 07001151/2018005 ML18284A0952018-10-11011 October 2018 Errata - Westinghouse Electric Company - Nuclear Regulatory Commission Integrated Inspection Report Number 70-1151/2018-004 and Notice of Violation ML18278A1972018-10-0505 October 2018 Westinghouse Electric Co., NRC Integrated Inspection Report 07001151/2018004, and Notice of Violation ML18200A0292018-07-18018 July 2018 Westinghouse - NRC Integrated Inspection Report 07001151/2018003, Rev 2 ML18115A1272018-04-25025 April 2018 Westinghouse Electric Company - Nuclear Regulatory Commission Integrated Inspection Report Number 7001151/2018002 and Notice of Violation ML18089A0602018-03-30030 March 2018 Westinghouse - NRC Inspection Report 07001151/2018006 ML18022A0702018-01-19019 January 2018 Westinghouse Electric Company - Nuclear Regulatory Commission Integrated Inspection Report No. 70-1151/2017-005 2024-04-22
[Table view] Category:Letter
MONTHYEARML24289A0062024-10-21021 October 2024 Westinghouse Columbia Fuel Fabrication Facility Integrated Inspection Report 07001151/2024003 ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24228A2952024-08-15015 August 2024 Westinghouse Electric Company, LLC - NRC Semi-Annual Discharge Report (Jan - June 2024) ML24176A2762024-06-24024 June 2024 Westinghouse Electric Company LLC, Submittal of Slides for the June 27, 2024, Partially Closed Meeting with NRC Staff on the Designation of Buildings as Items Relied on for Safety ML24173A2992024-06-24024 June 2024 Westinghouse Columbia Fuel Fabrication Facility – Inspection Schedule for Calendar Year 2025 ML24138A1152024-05-21021 May 2024 Cover Letter - the U.S. Nuclear Regulatory Commission Approval Letter for Westinghouse Emergency Plan Change Request for Columbia Fuel Fabrication Facility ML24134A2742024-05-13013 May 2024 Submittal of Slide Packages for the May 16, 2024 Pre-Application Meeting with NRC on the Proposed License Amendment Request Re Low Enriched Uranium Plus Expansion at Columbia Fuel Fabrication Facility ML24128A2662024-05-13013 May 2024 Notification of New Licensing Project Manager for Westinghouses SNM-1151 for the Columbia Fuel Fabrication Facility ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24110A0502024-04-22022 April 2024 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151/2024001 ML24109A0002024-04-19019 April 2024 Public Meeting Summary - Licensee Performance Review for Westinghouse Columbia Fuel Fabrication Facility, Docket Number 70-1151 ML24110A1442024-04-19019 April 2024 Response to Request for Additional Information - Westinghouse Request for Prior Approval of Revision 24 of the Columbia Fuel Fabrication Facility (CFFF) Site Emergency Plan ML24080A5072024-03-20020 March 2024 Westinghouse, Request for Prior Approval of Revision 24 of the Columbia Fuel Fabrication Facility (CFFF) Site Emergency Plan ML24074A2962024-03-19019 March 2024 Cover Letter for WEC Correction to Amendment 3 ML24064A2542024-03-0707 March 2024 Westinghouse Electric Company, Licensee Performance Review of Licensed Activities - Nuclear Regulatory Commission Inspection Report No 70-1151/2024-005 ML24025A1292024-02-23023 February 2024 Westinghouse Electric Company, LLC, - Amendment 2, Request for Exemption from 24-Hour Reporting Requirement of Title 10 of the Code of Federal Regulations Paragraph 70.50(B)(1) ML24023A6952024-01-26026 January 2024 Westinghouse Columbia Fuel Fabrication Facility, U.S. Nuclear Regulatory Commission Inspection Report Number 07001151/2023004 ML24026A1512024-01-25025 January 2024 Westinghouse Electric Company, LLC, Notice of Intent to Fabricate Low Enriched Uranium (Leu+) ML24017A2252024-01-22022 January 2024 Westinghouse Electric Company, LLC, Conveyance of Revised Standby Trust Agreement to Support the Decommissioning Funding Plan (Enterprise Project Identifier L-2023-DFA-0009) ML23349A2722023-12-14014 December 2023 Westinghouse, Submittal of Monthly Progress Reports Under Consent Agreement 19-02-HW with the South Carolina Department of Health and Environmental Control ML23338A3372023-12-0404 December 2023 Submittal of Amendment 4 to Standby Trust Agreement (STA) for License Nu. SNM-1107, Replacement of Trust Fund with Additional Surety Bonds, and Certification of Financial Assurance for SNM-1107 ML23311A0032023-11-0606 November 2023 Westinghouse Columbia Fuel Fabrication Facility, U.S. Nuclear Regulatory Commission Inspection Report Number 70-1151/2023-402 (Cover Letter) ML23296A0362023-10-24024 October 2023 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151/2023003 ML23240A5082023-08-28028 August 2023 Westinghouse Electric Company LLC - NRC Semi-Annual Discharge Report (January- June 2023) ML23230B2022023-08-18018 August 2023 Westinghouse, Supplemental Information for Request for Modification to Temporary License Conditions for Sampling, Analysis and Disposition of Hematite Ash Material ML23216A0712023-08-0404 August 2023 Westinghouse Columbia Fuel Fabrication Facility Physical Security Core Inspection Report 07001151/202340 ML23202A1472023-07-24024 July 2023 Westinghouse Columbia Fuel Fabrication Facility Integrated Inspection Report 07001151/2023002 ML23150A2362023-07-0303 July 2023 Letter to Westinghouse Regarding Effluent Testing Issue ML23184A1512023-06-29029 June 2023 Westinghouse Columbia Fuel 2023 Special Nuclear Material Inventory Summary Report Revision ML23171B1502023-06-20020 June 2023 Westinghouse Columbia Fuel 2023 Special Nuclear Material Inventory Summary Report ML23160A2612023-06-0909 June 2023 Westinghouse, Request for Modification to Temporary License Conditions for Sampling, Analysis and Disposition of Hematite Ash Material ML23139A1942023-06-0505 June 2023 Westinghouse Electric Company LLC - Approval of Environmental Sampling and Monitoring Program ML23138A3762023-05-18018 May 2023 Westinghouse Submittal of Columbia Fuel Fabrication Facility Site Emergency Plan, Revision 23 ML23096A2812023-05-15015 May 2023 Letter - Transfer of Control Approval 2023 ML23094A1582023-05-0505 May 2023 Westinghouse Electric Company, LLC - Revision to Temporarily Store Hematite Ash Above License Limits and Removal of Uranium Flywheel ML23115A2382023-04-26026 April 2023 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151/2023001 ML23114A3592023-04-24024 April 2023 Westinghouse Submittal of Environmental Sampling and Monitoring Program for NRC Review and Approval ML23114A3612023-03-23023 March 2023 Enclosures 2 & 3 - SCDHEC Approval Letter of Westinghouse Ri Report, Dated March 23, 2023 and Environmental Sampling and Monitoring Program Section of SNM-1107 License Application ML23058A2722023-02-27027 February 2023 Westinghouse, NRC Semiannual Discharge Report July - December 2022 ML23058A4482023-02-27027 February 2023 Request for Threshold Determination for Interim Transaction Included in December 20, 2022 Application for Consent to Indirect Change of Control with Respect to a Materials License, Export Licenses, and Notification Regarding Other Approvals ML23053A0712023-02-17017 February 2023 Westinghouse Electric Company LLC, Supplement to Application for Consent to Indirect Change of Control with Respect to a Materials License, Export Licenses, and Notification Regarding Other Approvals and Request for Threshold Determination ML23053A0752023-02-17017 February 2023 Westinghouse Electric Co. - Supplement 2 to Application for Consent to Indirect Change of Control with Respect to a Materials License, Export Licenses, and Notification Regarding Other Approvals and Request for Threshold Determination ML23047A4562023-02-16016 February 2023 Westinghouse, Response to Request for Additional Information - Request for Temporary License Amendment for Storage of Hematite Ash ML23030B8552023-01-30030 January 2023 Westinghouse 10CFR70.72 Facility Change Report ML23024A2312023-01-30030 January 2023 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151//2022004 ML23013A2122023-01-27027 January 2023 Acceptance Letter for Westinghouse License Transfer - Cac/Epid L-2022-LLM-0004 ML23026A3642023-01-26026 January 2023 Westinghouse, January 2023 Updated Integrated Safety Analysis Summary ML22354A0732023-01-19019 January 2023 Response to Westinghouse Revised Funding Instrument in Support of the Decommissioning Funding Plan ML22363A0152022-12-29029 December 2022 Westinghouse Electric Co - 60-Day Report Regarding the November 1, 2022, Incident Reported Under 10 CFR 70 Appendix a 24-Hr Report, Columbia Fuel Fabrication Facility (License No. SNM-1107, Docket No. 70-1151) 2024-09-18
[Table view] |
Text
July 7, 2021 Mr. Mike Annacone Vice President, Columbia Fuel Operations and Manager, Columbia Plant Westinghouse Electric Company 5801 Bluff Rd Hopkins, SC 29061
SUBJECT:
WESTINGHOUSE ELECTRIC COMPANY - INTEGRATED INSPECTION REPORT 07001151/2021002
Dear Mr. Annacone:
On June 30, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Westinghouse Electric Company. On June 22, 2021, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Noel A. Pitoniak, Chief (Acting)
Projects Branch 2 Division of Fuel Facility Inspection Docket No. 07001151 License No. SNM-1107
Enclosure:
As stated cc w/ encl: Distribution via LISTSERV
ML21188A027 X Non-Sensitive X Publicly Available X SUNSI Review Sensitive Non-Publicly Available OFFICE RIIDFFI RIIDFFI RIIDFFI RIIDFFI NAME J. Rivera L. Cooke R. Womack T. Vukovinsky DATE 7/1/21 7/1/21 7/1/21 7/1/21 OFFICE RIIDFFI N. Pitoniak for E.
NAME Michel DATE 7/7/2021 U.S. NUCLEAR REGULATORY COMMISSION Inspection Report Docket Number: 07001151 License Number: SNM-1107 Report Number: 07001151/2021002 Enterprise Identifier: I-2021-002-0116 Licensee: Westinghouse Electric Company Facility: Columbia Fuel Fabrication Facility Location: Hopkins, SC Inspection Dates: June 21 to June 25, 2021 Inspectors: L. Cooke, Fuel Facility Inspector J. Rivera Ortiz, Sr. Fuel Facility Project Inspector R. Womack, Sr. Fuel Facility Projects Inspector Approved By: Noel A. Pitoniak, Chief (Acting)
Projects Branch 2 Division of Fuel Facility Inspection Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Westinghouse Electric Company, in accordance with the fuel cycle facility inspection program. This is the NRCs program for overseeing the safe operation of licensed fuel cycle facilities. Refer to https://www.nrc.gov/materials/fuel-cycle-fac.html for more information.
List of Violations No violations of more than minor significance were identified.
Additional Tracking Items None.
2
PLANT STATUS The Westinghouse Facility converts uranium hexafluoride (UF6) into uranium dioxide using a wet conversion process and fabricated fuel assemblies for use in commercial nuclear power reactors. During the inspection period, normal production activities were ongoing.
INSPECTION SCOPES Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Inspections were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2600, Fuel Cycle Facility Operational Safety and Safeguards Inspection Program. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
FACILITY SUPPORT 88051 - Evaluation of Exercises and Drills The inspectors observed and evaluated the licensees graded biennial exercise conducted on June 22, 2021, as well as briefings and post-drill evaluations involving both on-site and off-site participants, to verify compliance with 10 CFR 70.22(i)(3)(xii), the Emergency Plan, and Chapter 9 of the license application. The scenario included a spill of special nuclear material, followed by a simulated medical emergency and a spill of ammonia solution near the initial spill of SNM. The exercise was designed to test emergency response actions for plant evacuation and accountability, control of spilled material, assessment of plant conditions and potential hazards, and treatment of plant personnel with medical needs. External emergency responders included Columbia Fire, Richland County Emergency Services, South Carolina Department of Health and Environmental Control, and PRISMA Richland Hospital.
Exercise Planning (IP Section 02.01)
The inspectors reviewed the emergency exercise scenario, discussed the exercise objectives with licensee personnel, observed the exercise drill controller briefing, and walked down plant areas before the exercise to verify compliance with the Emergency Plan, Emergency Plan Implementing Procedure and 10 CFR 70.22(i)(3)(xii). The inspectors reviewed the following:
- the frequency of exercises conducted by the licensee
- the scenario as it related to testing all elements of the Emergency Plan and probability
- pre-staging of equipment in preparation for the exercise
- duties and responsibilities for exercise personnel including controllers, evaluators, and observers
- confidentiality of the scenario and objectives 3
Exercise Execution and Emergency Plan Implementation (IP Section 02.02)
The inspectors observed the initiation of the emergency exercise in the selected process area and the activation of the Incident Commander post and the Emergency Operations Center (EOC) to verify compliance with the Emergency Plan, Emergency Plan Implementing Procedures, and 10 CFR 70.22(i)(3)(xii). The inspectors observed or reviewed the following:
- the licensees analysis of plant conditions including assessment and classification of the accident scenario
- staffing for EOC and Incident Command positions
- protective action recommendations implemented by the EOC
- timeliness of notifications to the NRC and local government agencies
- onsite communication to occupational workers as it related to protective action recommendations
- occupational workers participation in evacuation protective actions and the process to conduct personnel accountability
- Emergency Director's command and control of the EOC
- Incident Commander's control of the emergency response team and coordination of actions with off-site emergency responders
- health physics collection and use of applicable radiation survey and environmental monitoring results during assessment of the accident scenario
- response coordinators recommendations regarding conditions for terminating the event and restarting normal operations
- recovery and re-entry recommendations implemented by the EOC
- members of the licensees emergency response team assembly at designated assembly areas and the arrival of off-site emergency responders including fire and medical emergency services
- emergency response teams actions including assessment of the affected area, actions to medically treat and transport contaminated workers, and implementation of emergency plan procedures
- response to emerging situations to address the exercise scenario and meet the exercise objectives Critiques, Exercise Control, and Identification and Resolution of Problems (IP Section 02.03)
The inspectors observed the staff critiques of the emergency exercise and reviewed the licensees related corrective action program entries to verify compliance with the Emergency Plan, Emergency Plan Implementing Procedure and 10 CFR 70.22(i)(3)(xii). The inspectors conducted the following:
- observed the post-drill critiques conducted by the licensee
- reviewed the After Action Report identifying deficiencies captured during critiques including items planned for entry into the licensees corrective action program 4
INSPECTION RESULTS No issues were identified.
EXIT MEETINGS AND DEBRIEFS The inspectors verified no proprietary information was retained or documented in this report.
- On June 22, 2021, the inspectors presented the integrated inspection results to Mike Annacone and other members of the licensee staff.
5
DOCUMENTS REVIEWED Inspection Type Designation Description or Title Revision or Procedure Date 88051 Corrective Action 2019-7994 Documents Resulting from Inspection Miscellaneous N/A Westinghouse CFFF Emergency Exercise Planning - June 2021 Worksheet for Developing Emergency Exercises N/A Master Scenario Events List (MSEL) June 2021 N/A Exercise Evaluator Checklists for Emergency Operations June 2021 Center N/A After Action Report Westinghouse CFFF Biennial Exercise - June 2021 2021 Procedures CA-134 Columbia Plant Significant Event Response Guidelines 2 N/A Site Emergency Plan for the Columbia Fuel Fabrication 21 Facility ROP-05-002 Performing Smear Surveys 16 ROP-06-002 Roof Effluent Air Sampling and Counting 29 ROP-06-003 Ambient Environmental Air Monitoring for Radioactivity 15 ROP-07-001 Health Physics Response to Emergency Events 14 SEP-002 Classification 6 SEP-005 Evacuation, Emergency Shelter, Accountability, and General 13
Response
SEP-007 Notification Guidelines for NRC and Other Agencies 52 SEP-013 Post Incident Analysis 2 SEP-018 Emergency Operations Center (EOC) Operations 5 SEPF-009-12 Command Check Sheet - Radiological Airborne Release 6 Inside of Building SEPF-009-14 Chemical Area Evacuaitons 2 SEPF-009-3 Command Check Sheet - Injured Employee 16 SEPF-009-4 Command Check Sheet - Ammonia Release 4 SEPF-018-1 Emergency Director Checklist 9 SEPF-018-12 Maintenance Checklist 0 SEPF-018-2 Safety Checklist 3 6
Inspection Type Designation Description or Title Revision or Procedure Date SEPF-018-3 EH&S Checklist 3 SEPF-018-4 Regulatory Checklist 3 SEPF-018-5 Communications Checklist 6 SEPF-018-6 Operations Checklist 6 7