ND-21-0603, Electrical Construction and Measuring & Test Equipment Control

From kanterella
(Redirected from ML21176A200)
Jump to navigation Jump to search
Electrical Construction and Measuring & Test Equipment Control
ML21176A200
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 06/25/2021
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ND-21-0603
Download: ML21176A200 (7)


Text

Michael J. Yox 7825 River Road A Southern Nuclear Rs9u,ato.,Affa,rsD,rector Regulatory Al Vogtle 3 & 4 wav<<

myoxtfflsouthernco.com June 25, 2021 Docket Nos.: 52-025 ND-21-0603 52-026 10 CFR 50.55(e)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 Submittal of 10 CFR 50.55(e) Report Regarding Electrical Construction and Measuring & Test Equipment Control Ladies and Gentlemen:

This submittal is made with regard to the Vogtle Electric Generating Plant, Units 3 and 4 (VEGP 3&4), license numbers NPF-91 and NPF-92, pursuant to 10 CFR 50.55(e).

Southern Nuclear Operating Company(SNC) hereby submits a report in accordance with 10 CFR 50.55(e) pertaining to electrical construction and measuring & test equipment control.

This letter contains no regulatory commitments.

If there are any questions regarding this letter, please contact Steve Leighty at(706) 848-6790.

U.S. Nuclear Regulatory Commission ND-21-0603 Page 2 of 4 Respectfully submitted, Michael J. Yox Regulatory Affairs Director Vogtle 3 & 4 Southern Nuclear Operating Company MJY/CAC/sfr

Enclosure:

10 CFR 50.55(e) Report Regarding Electrical Construction and Measuring & Test Equipment Control

U.S. Nuclear Regulatory Commission ND-21-0603 Page 3 of 4 cc:

Southern Nuclear Operating Company / Georgia Power Company Mr. S. E. Kuczynski (w/o enclosures)

Mr. P. P. Sena III (w/o enclosures)

Mr. M. D. Meier (w/o enclosures)

Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. D. L. McKlnney (w/o enclosures)

Mr. T. W. Yelverton (w/o enclosures)

Mr. B. H. Whitley Mr. W. Levis Ms. C. A. Gayheart Ms. M. Ronnlund Mr. J. M. Delano Mr. M. J. Vox Mr. C. T. Defnall Mr. J. Tupik Ms. A. C. Chamberlain Mr. S. Leighty Ms. K. Roberts Mr. J. Haswell Mr. D. T. BIythe Mr. K. Warren Mr. A. S. Parton Mr. A. Nix Nuclear Regulatory Commission Ms. A. Veil(w/o enclosures)

Mr. M. King (w/o enclosures)

Mr. G. Bowman (w/o enclosures)

Ms. M. Bailey (w/o enclosures)

Mr. G.J. Khouri Mr. G. Armstrong Mr. C. Patel Mr. C. Santos Mr. B. Kemker Mr. J. Eargle Mr. C. J. Even Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. O. Lopez-Santiago Mr. M. Webb Mr. B. Gleaves

U.S. Nuclear Regulatory Commission ND-21-0603 Page 4 of 4 Nuclear Regulatory Commission Mr. T. Fredette Ms. K. McCurry Mr. B. Davis Mr. J. Parent Mr. B. Griman Mr. P. McKenna State of Georoia Mr. R. Dunn Qqlethorpe Power Corporation Mr. M. W. Price Mr. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georoia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utilities Mr. T. Bundros Westinohouse Electric Company. LLC Mr. L. Oriani (w/o enclosures)

Mr. T. Rubenstein (w/o enclosures)

Mr. M. Corletti Mr. D. Hawkins Mr. J. Coward Other Mr. S. W. Kline, Bechtel Power Corporation Ms. L. A. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.

Mr. S. Roetger, Georgia Public Service Commission Mr. R.L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham

Southern Nuclear Operating Company ND-21-0603 Enclosure 1 10 CFR 50.55(e) Report Regarding Electrical Construction and Measuring & Test Equipment Control (This Enclosure consists of 2 pages, not including this cover page)

U.S. Nuclear Regulatory Commission ND-21-0603 Page 1 of 2 (i) Name and address of the individual or individuals informing the Commission.

Michael J. Vox, 7825 River Road, Waynesboro, GA 30830 (ii) Identification of the facility, the activity, or the basic component supplied for the facility or the activity within the United States which contains a defect or fails to comply.

The activities include construction processes including, installation of some electrical and mechanical commodities, and control of measuring & test equipment at the Vogtle 3&4 construction project.

(iii) Identification of the firm constructing or manufacturing the facility or supplying the basic component which fails to comply or contains a defect.

The Vogtle 3&4 construction project primary construction firm is Bechtel Power Corporation (Bechtel).

(iv) Nature of the defect or failure to comply and the safety hazard which is created or could be created by the defect or failure to comply.

This report is being provided based on construction nonconformances including, installation of some electrical and mechanical commodities, and control of measuring & test equipment (M&TE)for Vogtle Units 3&4. The nonconformances affect cable separation and other raceway structural elements. The extent of condition for the M&TE issue is under evaluation and may impact additional safety-related work.

The identified construction nonconformances are a small fraction of the overall structures and components. There is no specifically identified substantial safety hazard (SSH)for these nonconformances. The nonconformances identified affect some safety-related components and based on this it was conservatively judged that the issues could be related to an SSH. These issues were discovered while the facility is under construction. The identified conditions will be corrected prior to completion of the facility.

(v) The date on which the information of a defect or failure to comply was obtained.

The evaluation was completed on June 24, 2021.

(vi) In the case of a basic component which contains a defect or fails to comply, the number and location of all the basic components in use at the facility subject to the regulations in this part.

As stated in the response to (iv) above, there are no specifically identified basic components that have been identified to contain a defect for Vogtle Units 3&4. The nonconformances identified affect some safety-related components and based on this it was conservatively judged that these conditions involve a failure to comply that could be related to an SSH.

U.S. Nuclear Regulatory Commission ND-21-0603 Page 2 of 2 (vii) In the case of a completed reactor manufactured under part 52 of this chapter, the entities to which the reactor was supplied.

Not applicable.

(viii) The corrective action which has been, is being, or will be taken; the name of the individual or organization responsible for the action; and the length of time that has been or will be taken to complete the action.

Comprehensive extent-of-condition reviews and correction of identified conditions are being conducted. The actions to identify and resolve the nonconforming conditions are in process and will be completed in accordance with the site corrective action program. Bechtel, and other subcontractors as needed, will implement actions to correct the identified conditions and ensure that processes are in place to avoid future occurrences. Southern Nuclear Operating Company(SNC)is the organization responsible for ensuring Bechtel and the other subcontractors complete the required actions to correct the nonconforming conditions and ensuring that processes are in place to avoid future occurrences.

(ix) Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to other entities.

None.