ML21173A292

From kanterella
Jump to navigation Jump to search
5-20-21 St. Lucie Plant Units 1 & 2 Subsequent License Renewal Environmental Pre-Application Meeting Summary
ML21173A292
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 07/09/2021
From: Lance Rakovan
NRC/NMSS/DREFS/ELRB
To: Coffey R
Florida Power & Light Co
Rakovan L, NRC/NMSS/ELRB
References
Download: ML21173A292 (2)


Text

Mr. Robert Coffey Vice President, Nuclear and

& Chief Nuclear Officer Florida Power & Light Company 700 Universe Boulevard Mail Stop: EX/JB Juno Beach, FL 33408

SUBJECT:

ST. LUCIE PLANT, UNITS 1 AND 2, SUBSEQUENT LICENSE RENEWAL APPLICATION - PUBLIC MEETING

SUMMARY

OF PRE-SUBMITTAL ENVIRONMENTAL REVIEW MEETING

Dear Mr. Coffey:

By Subsequent License Renewal Application Notification|letter dated March 17, 2021]] (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21076A314), Florida Power & Light Company (FPL or the applicant), submitted a letter of intent to submit a subsequent license renewal application (SLRA) for St. Lucie Plant (St. Lucie), Units 1 and 2.

On May 20, 2021, the U.S. Nuclear Regulatory Commission (NRC, or the staff) held a public meeting with FPL to discuss the expected content of the upcoming submittal of the SLRA for St. Lucie with a focus on the environmental review. The slides for the staff presentation are available at ADAMS Accession No. ML21139A307, and the slides for the applicants presentation are available at ADAMS Accession No. ML21139A300. A similar meeting was held April 21, 2021, with a focus on the safety review. A summary of that meeting is available at ADAMS Accessions No. ML21127A218.

The NRC staff began with a brief overview of the subsequent license renewal (SLR) process.

The process consists of two tracks: an environmental review and a safety review. During the meeting, the staff shared a tentative review schedule. For an application submission date of August 3, 2021, the tentative review schedule would be as follows:

Project Start Date (SLRA Acceptance)

Scoping Period (with public meeting approximately midway through)

Environmental Audit Draft Supplemental Environmental Impact Statement (SEIS)

Published DSEIS Public Comment Period Final SEIS Published September 17, 2021 October - November 2021 Early January 2021 July 2022 August 2022 March 2023 FPL then began their presentation with a description of St. Lucie. The St. Lucie Unit 1 entered initial period of extended operation (PEO) in March 1, 2016 and Unit 2 is scheduled to enter PEO in April 6, 2023.

July 9, 2021

R. Coffey 2

In the development of the St. Lucie SLRA, FPL will benchmark against other successful SLR utilities and incorporate industry license renewal operating experience. In addition, FPL will incorporate lessons learned from NextEra fleet experience. FPL will review and incorporate previous SLRA request for additional information from Turkey Point, Peach Bottom and Surry.

In support of the NRC review, the applicant will populate an e-Portal.

Following the presentations, NRC and FPL representatives discussed a number of issues, including: coordination with the State Historic Preservation Officer and Tribal nations; coastal zone management act consistency determination; site-specific assessments of Category 2 issues; ground water; replacement power alternatives; and alternative cooling systems.

There were no members of the public in attendance, and thus no questions or comments during the public question and answer portion of the meeting.

If you have any questions, please feel free to contact me at Lance.Rakovan@nrc.gov.

Sincerely, Lance J Rakovan Senior Environmental Project Manager Division of Rulemaking, Environmental, and Financial Support Office of Nuclear Material Safety and Safeguards Docket No.s 50-335 & 50-389

Enclosure:

List of Attendees Signed by Rakovan, Lance on 07/09/21

Ltr ML21173A292 OFFICE NMSS/MSST/MSTB NMSS/REFS/ERLRB NMSS/MSST/MSTB*

NAME LRakovan RElliott LRakovan DATE Jun 30, 2021 Jun 30, 2021 Jul 9, 2021

Enclosure List of Attendees All attendees participated remotely NRC Attendees Arlene, Briana Clark, Phyllis Elliott, Robert Gibson, Lauren Guo, Lifeng Hsu, Caroline Hoffman, Robert James, Lois Johnson, Marieliz Martinez, Nancy Palmrose, Donald Rakovan, Lance Rikhoff, Jeffrey Rodriguez-Luccioni, Hector Florida Power & Light Company (and Contractors) Attendees Andrews, Doug (FPL)

Atkinson, Paul (FPL)

Burgess, Stacy (ENERCON)

Corneille, Ana (FPL)

Eaton, Kristin (FPL)

Estabrook, Desiree (FPL)

Eldridge, Jodie (FPL)

Estabrook, Richard (FPL)

Daily, John (FPL)

Flowers, Tom (FPL)

Franzone, Steve (FPL)

Godes, Wyatt (FPL)

Hamrick, Steven (FPL)

Heiba, Mahmoud (FPL)

Johnson, Neil (ENERCON)

Maher, William (FPL)

McLamb, Erica (ENERCON)

Nguyen, Diane (FPL)

Orthen, Richard (FPL)

Pineda, Jessica (FPL)

Proctor Jr., Kennard (FPL)

Raab, Autumn (FPL)

Robbins, Peter (FPL)

Slavonic, Tom (ENERCON)

Turney, Rachel (ENERCON)

Watkins, Kaitlyn (FPL)

Wesbury, Brandon (ENERCON)