ML21133A121

From kanterella
Jump to navigation Jump to search
0 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Table of Contents
ML21133A121
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 04/29/2021
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML21138A803 List: ... further results
References
Download: ML21133A121 (5)


Text

LGS UFSAR CHAPTER 13 - CONDUCT OF OPERATIONS TABLE OF CONTENTS 13.1 ORGANIZATIONAL STRUCTURE 13.1.1 Deleted 13.1.2 Operating Organization 13.1.2.1 Deleted 13.1.2.1.1 Deleted 13.1.2.1.2 Deleted 13.1.2.1.3 Deleted 13.1.2.1.4 Deleted 13.1.2.1.5 Deleted 13.1.2.2 Deleted 13.1.2.3 Deleted 13.1.2.4 Deleted 13.1.2.5 Deleted 13.1.2.6 Deleted 13.1.2.7 Deleted 13.1.2.8 Deleted 13.1.3 Qualification of Nuclear Plant Personnel 13.1.3.1 Deleted 13.1.3.2 Deleted 13.1.4 Special Projects 13.2 TRAINING 13.2.1 Plant Personnel Training Program 13.2.1.1 INPO Accredited Training Programs 13.2.1.2 Access Training 13.2.1.3 Emergency Preparedness Training 13.2.1.4 Radwaste Shipping Training 13.2.1.5 Fire Protection Training 13.2.1.6 Fire Protection Requalification Training 13.2.2 Records 13.2.3 Training Organization 13.2.3.1 See Figure 13.2-1 13.3 EMERGENCY PLANNING 13.4 REVIEW AND AUDIT 13.4.1 General 13.4.2 Onsite Review 13.4.3 Independent Review 13.4.4 Audit Program 13.4.5 Independent Safety Engineering Group CHAPTER 13 13-i REV. 20, SEPTEMBER 2020

LGS UFSAR TABLE OF CONTENTS (CONT'D) 13.5 PLANT PROCEDURES 13.5.1 Administrative Procedures 13.5.1.1 Procedure for Preparation and Control of Administrative Procedures 13.5.1.2 Procedure for Plant Operations Review Committee 13.5.1.3 Procedure for Plant and Shift Operations 13.5.1.4 Procedure for Release of Safety-Related Equipment 13.5.1.5 Procedure for Temporary Modifications 13.5.1.6 Procedure for Control of Plant Modifications 13.5.1.7 Procedure for Control of In-plant Work 13.5.1.8 Procedure for Administration of the Preventive Maintenance Program 13.5.1.9 Procedure for Administration of the Surveillance Testing Program 13.5.1.10 Procedure for Administration of Plant Records 13.5.1.11 Procedure for Procurement 13.5.1.12 Procedure for Administration of the Plant Security Program 13.5.1.13 Procedure for Preparation of Maintenance Procedures 13.5.1.14 Procedure for Preparation of Transient Response Implementation Plan Procedures 13.5.1.15 Procedure for Preparation of Emergency Plan Procedures 13.5.1.16 Procedure for Preparation of General Plant Procedures 13.5.1.17 Procedure for Preparation of System Procedures 13.5.1.18 Procedure for Preparation of Operational Transient Procedures 13.5.1.19 Procedure for Preparation of Alarm Response Cards 13.5.1.20 Procedure for Preparation of Fuel Handling Procedures 13.5.1.21 Procedure for Preparation of Health Physics Procedures 13.5.1.22 Procedure for Preparation of Chemistry Procedures 13.5.1.23 Procedure for Temporary Changes to Approved Procedures 13.5.1.24 Procedure for Preparation of Off-Normal Procedures 13.5.1.25 Procedure for Preparation of Event Procedures and Special Event Procedures 13.5.1.25.1 Procedure for the Preparation of Event Procedures 13.5.1.25.2 Procedure for the Preparation of Special Event Procedures 13.5.1.26 Procedure for Preparation of Radwaste Procedures 13.5.2 Operating and Maintenance Procedures 13.5.2.1 Control Room Operating Procedures 13.5.2.2 Control of Unit 2 Construction Activities During Unit 1 Operation 13.5.2.3 Additional Operating and Maintenance Procedures 13.5.3 Operations Technical Requirements Manual (TRM) 13.5.4 Surveillance Frequency Control Program (SFCP) 13.5.5 Risk Informed Categorization and Treatment 13.5.5.1 Introduction 13.5.5.2 SSC Categorization CHAPTER 13 13-ii REV. 20, SEPTEMBER 2020

LGS UFSAR TABLE OF CONTENTS (CONT'D) 13.5.5.3 SSC Treatment 13.5.5.3.1 Treatment of Components Categories 13.5.5.3.2 Enhanced Treatment of RISC-2 SSCs 13.5.6 References 13.6 INDUSTRIAL SECURITY CHAPTER 13 13-iii REV. 20, SEPTEMBER 2020

LGS UFSAR CHAPTER 13 - CONDUCT OF OPERATIONS LIST OF TABLES TABLE TITLE 13.1-1 Deleted 13.1-2 Shift Crew Composition - Minimum Requirements 13.2-1 Matrix of LGS Training Program Guidelines 13.5-1 Systems Categorized in the 10 CFR 50.69 Categorization Process CHAPTER 13 13-iv REV. 20, SEPTEMBER 2020

LGS UFSAR CHAPTER 13 - CONDUCT OF OPERATIONS LIST OF FIGURES FIGURE TITLE 13.1-1 Deleted 13.1-2 Deleted 13.1-3 Deleted 13.1-4 Deleted 13.2-1 Deleted 13.5-1 Definition of "At the Controls" 13.5-2 SRO Control Room Boundaries CHAPTER 13 13-v REV. 20, SEPTEMBER 2020