Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 HDI-Pil-21-047 Technical Specification 5.6.3 10 CFR 50.36(a)

May 12, 2021 Attn: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Pilgrim Nuclear Power Station Renewed Facility Operating License No. DPR-35 Docket No. 50-293 and 72-1044

Subject:

Annual Radioactive Effluent Release Report for January 1 through December 31, 2020.

In accordance with Pilgrim Nuclear Power Station Technical Specification 5.6.3. Holtec Decommissioning International, LLC submits the attached Annual Radioactive Effluent Release Report for January 1, 2020 through December 31, 2020.

This letter contains no new regulatory commitments.

Should you have any question or require further information, please contact me at (856) 797-0900 x 3813.

Respectfully, Andrea L. Sterdis Vice President, Regulatory and Environmental Affairs Holtec Decommissioning International, LLC

Enclosure:

Annual Radioactive Effluent Release Report, January 1 through December 31, 2020 cc:

USNRC Regional Administrator, Region I USNRC Project Manager, NMSS - Pilgrim Nuclear Power Station USNRC Region I, Lead Inspector - Pilgrim Nuclear Power Station Director, Massachusetts Emergency Management Agency Digitally signed by Andrea Sterdis DN: cn=Andrea Sterdis, c=US, o=Holtec Decommissioning International, ou=HDI, email=a.sterdis@holtec.com Date: 2021.05.12 15:46:04 -04'00' Andrea Sterdis