ML21132A283
| ML21132A283 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 05/12/2021 |
| From: | Sterdis A Holtec Decommissioning International |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML21132A282 | List: |
| References | |
| HDI-Pil-21-046 | |
| Download: ML21132A283 (1) | |
Text
Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 HDI-Pil-21-046 Technical Specification 5.6.2 10 CFR 50, Appendix I May 12, 2021 Attn: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Pilgrim Nuclear Power Station Renewed Facility Operating License No. DPR-35 Docket No. 50-293 and 72-1044
Subject:
Annual Radiological Environmental Operating Report for January 1 through December 31, 2020.
In accordance with Pilgrim Nuclear Power Station Technical Specification 5.6.2. Holtec Decommissioning International, LLC submits the attached Annual Radiological Environmental Operating Report for January 1, through December 31, 2020.
This letter contains no new regulatory commitments.
Should you have any question or require further information, please contact me at (856) 797-0900 x 3813.
Respectfully, Andrea L. Sterdis Vice President, Regulatory and Environmental Affairs Holtec Decommissioning International, LLC
Enclosure:
Annual Radiological Environmental Operating Report, January 1 through December 31, 2020 cc:
USNRC Regional Administrator, Region I USNRC Project Manager, NMSS - Pilgrim Nuclear Power Station USNRC Region I, Lead Inspector - Pilgrim Nuclear Power Station Director, Massachusetts Emergency Management Agency Digitally signed by Andrea Sterdis DN: cn=Andrea Sterdis, c=US, o=Holtec Decommissioning International, ou=HDI, email=a.sterdis@holtec.com Date: 2021.05.12 15:51:54 -04'00' Andrea Sterdis