Letter Sequence Meeting |
---|
EPID:L-2020-LLA-0140, License Amendment Request to Revise Technical Specification Requirements Related to Inspection Method and Service Life for Alloy 800 Steam Generator Tubesheet Sleeves (Approved, Closed) |
|
|
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML22187A0652022-06-0808 June 2022 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - NRC Presentation Slides ML21165A1942021-06-16016 June 2021 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation ML21165A2882021-06-16016 June 2021 Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) ML21095A1332021-04-0505 April 2021 Information for April 6, 2021 Public Meeting ML20168A3192020-06-15015 June 2020 Joint Annual Assessment Meeting for Pa/Md Power Plants - Webinar Presentation ML20143A0422020-05-22022 May 2020 Presentation Slides - Technical Justification for the Ghent Version 2 Probe Qualification and Probability of Detection - May 26, 2020 (Non-Proprietary Version) ML20143A0352020-05-22022 May 2020 Presentation Slides - Ghent Version 2 Probe License Amendment Request - Pre-submittal Phone Call - May 26,2020 ML19157A0542019-06-0606 June 2019 Joint Annual Assessment Meeting (Webinar) for Pennsylvania Power Plants - NRC Presentation Slides ML16089A0622016-03-30030 March 2016 Meeting to Discuss BVPS Draft PRA RAI - Slides ML15230A2882015-08-13013 August 2015 Slides: NRC Fundamental of Emergency Preparedness Beaver Valley Power Station, August 13, 2015 ML12319A1322012-11-15015 November 2012 FENOC - NRC Pre-Application Meeting License Amendment Request November 15, 2012 ML12269A0612012-09-26026 September 2012 FENOC Presentation for 2012-09-26 Public Meeting ML12215A4152012-08-0101 August 2012 Presentation from Firstenergy Nuclear Operating Company Beaver Valley NFPA 805 Transition ML1112503982011-05-0505 May 2011 Aam - NRC Slides ML1027903512010-10-18018 October 2010 Summary of Meeting with Firstenergy Nuclear Operating Company, on the Request for Additional Resposnses Regarding the Spent Fuel Rerack for Beaver Valley Power Station, Unit No. 2 ML1014706172010-05-27027 May 2010 Region I and Region III Fire Protection Organization Meeting Slides ML0913906312009-06-0404 June 2009 ACRS Meeting with the U.S. Nuclear Regulatory Commission, - June 4, 2009, Slides ML0832400512008-11-17017 November 2008 Preliminary Results of Environmental Review ML0834504752008-11-0202 November 2008 11/12/2008 Meeting Slides, Beaver Valley License Renewal Public Exit Meeting. ML0818403982008-06-20020 June 2008 NFPA-805 Workshop Handouts - Beaver Valley Rules-Based Presentation ML0808800882008-03-25025 March 2008 FENOC 3-25-08 Annual Assessment Mtg Slides ML0807003932008-03-10010 March 2008 2007 Beaver Valley Annual Assessment Slides ML0735202822007-11-27027 November 2007 Slides, Beaver Valley Power Station License Renewal Process and Environmental Scoping Meeting. ML0722500232007-08-0202 August 2007 (PA-LR) Beaver Valley Power Station License Renewal Project Presentation to NRC August 2, 2007, Meeting Handouts ML0708706692007-03-28028 March 2007 Annual Performance Assessment, Slides, 4-24-07 ML0603002272006-01-10010 January 2006 Multi-Regional NRC Public Meeting Licensee (FENOC) Slide Presentation ML0802205572005-09-12012 September 2005 NRC Commissioners Briefing by Firstenergy Nuclear Operating Co ML0523703812005-08-24024 August 2005 Meeting Slides from Beaver Valley 8/24/05 Public Meeting ML0511902682005-03-23023 March 2005 Meeting Presentation Slides - Summary of Meeting with FENOC Re Category 1, Pre-Application Review Re BVPS-1 Steam Generator (SG) Replacement and Related Alternate Source Term (AST) Approval ML0324812782003-09-10010 September 2003 Agenda and Handout for Public Meeting Between NRC and Firstenergy Nuclear Operating Company Davis-Besse Nuclear Power Station ML0317404152003-06-20020 June 2003 Enclosure 2 - BVPS 1R15 - NRC Outage Phone Call ML0227603992002-09-25025 September 2002 Firstenergy Nuclear Operating Co., & Bnfl Westinghouse Electric Co., LLC, Meeting on Risk-Informed In-service Inspection(Is) Augmented High Energy Line Break (HELB) 2023-06-06
[Table view] |
Text
April 6th Public Meeting - Public Information The NRC has approved the use of Westinghouse leak-limiting Alloy 800 sleeves to repair flawed steam generator tubes in Beaver Valley Unit 2. The tubesheet sleeves are currently limited to no more than eight cycles of operation due to NRC staff questions about the ability to detect flaws, if they were to occur, in the parent tube within the tubesheet. The licensee requested a license amendment that would remove the limit on the number of operating cycles based on an improved eddy current technique for detecting cracking that could potentially occur in the parent tube adjacent to the sleeve nickel band (ADAMS Accession No. ML20177A272). The nickel band is on the outside surface of the sleeve and rolled against the inside surface of the parent tube during installation to enhance leakage integrity.
In letters dated January 22, 2021, and February 16, 2021), Energy Harbor provided responses to staff questions in a request for additional information (RAI) (ADAM Accession Nos.
ML21022A132 and ML21048A082, respectively).
The purpose of the meeting is for the staff to ask clarifying questions about the RAI responses in the following two subject areas:
- Effect of the nickel band thickness on the probability of detection (POD) of the Ghent Version 2 eddy current probe
- Details of the licensees eddy current analysis techniques to determine the POD from test samples with known flaws Some of the details of the sleeve design and the testing that was performed to address NRC staff questions is proprietary. Therefore, discussion of this information will not be available to the public.