MONTHYEARSBK-L-24030, 2023 Annual Environmental Operating Report2024-04-12012 April 2024 2023 Annual Environmental Operating Report SBK-L-23053, Radiological Emergency Plan (Ssrep), Revision 802023-06-22022 June 2023 Radiological Emergency Plan (Ssrep), Revision 80 SBK-L-23031, 2022 Annual Radioactive Effluent Release Report2023-04-28028 April 2023 2022 Annual Radioactive Effluent Release Report SBK-L-23044, 2022 Annual Radiological Environmental Operating Report2023-04-28028 April 2023 2022 Annual Radiological Environmental Operating Report SBK-L-23033, 2022 Annual Environmental Operating Report2023-04-11011 April 2023 2022 Annual Environmental Operating Report SBK-L-22093, 75 Day and 150 Day Submittal Letters2022-12-0101 December 2022 75 Day and 150 Day Submittal Letters SBK-L-22113, Radiological Emergency Plan (Ssrep), Revision 792022-11-16016 November 2022 Radiological Emergency Plan (Ssrep), Revision 79 SBK-L-22114, Independent Spent Fuel Storage Installation (Isfsi), Cask Registration2022-11-0909 November 2022 Independent Spent Fuel Storage Installation (Isfsi), Cask Registration SBK-L-22112, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2022-11-0303 November 2022 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration SBK-L-22094, Relief Request 4RA-22-001, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2)2022-10-26026 October 2022 Relief Request 4RA-22-001, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) SBK-L-22105, Supplement to 2021 Annual Radioactive Effluent Release Report2022-10-24024 October 2022 Supplement to 2021 Annual Radioactive Effluent Release Report SBK-L-22103, 5 to the Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan2022-10-12012 October 2022 5 to the Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan SBK-L-22102, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2022-10-0606 October 2022 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration SBK-L-22080, Submittal of 10 CFR 72.48 Report of Changes, Tests and Experiments for August 2020 to July 20222022-08-12012 August 2022 Submittal of 10 CFR 72.48 Report of Changes, Tests and Experiments for August 2020 to July 2022 SBK-L-22054, SBK-L-22054 - License Amendment Request 22-01, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-06-0909 June 2022 SBK-L-22054 - License Amendment Request 22-01, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections SBK-L-22044, 2021 Annual Radioactive Effluent Release Report2022-04-29029 April 2022 2021 Annual Radioactive Effluent Release Report SBK-L-22036, Steam Generator Tube Inspection Report2022-04-25025 April 2022 Steam Generator Tube Inspection Report SBK-L-22040, Radiological Emergency Plan (Ssrep), Revision 7822022-04-20020 April 2022 Radiological Emergency Plan (Ssrep), Revision 782 SBK-L-22024, Response to Request for Additional Information (Raj) Regarding License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2022-03-0707 March 2022 Response to Request for Additional Information (Raj) Regarding License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements SBK-L-22003, Inservice Inspection Examination Report2022-01-24024 January 2022 Inservice Inspection Examination Report SBK-L-21126, Fourth 10 Year Interval - Inservice Inspection (ISI) Program Plan2022-01-0404 January 2022 Fourth 10 Year Interval - Inservice Inspection (ISI) Program Plan SBK-L-21135, Submittal of Changes to the Seabrook Station Technical Specification Bases2021-12-29029 December 2021 Submittal of Changes to the Seabrook Station Technical Specification Bases SBK-L-21108, Core Operating Limits Report for Cycle 222021-11-0404 November 2021 Core Operating Limits Report for Cycle 22 SBK-L-21106, Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program2021-09-30030 September 2021 Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program SBK-L-21105, Withdrawal of Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink One-Time Allowed Outage Time (AOT) Extension2021-09-27027 September 2021 Withdrawal of Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink One-Time Allowed Outage Time (AOT) Extension SBK-L-21104, Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink Onetime Allowed Outage Time (AOT) Extension2021-09-25025 September 2021 Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink Onetime Allowed Outage Time (AOT) Extension SBK-L-21103, Request for Exercise of Enforcement Discretion2021-09-25025 September 2021 Request for Exercise of Enforcement Discretion SBK-L-21098, Supplement to License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2021-09-22022 September 2021 Supplement to License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements SBK-L-21083, NextEra Energy Seabrook, LLC - Relief Request 3IR-18 and 3IR-19 for End of Third 10-Year ISI Interval for Examinations with Limited Coverage2021-08-18018 August 2021 NextEra Energy Seabrook, LLC - Relief Request 3IR-18 and 3IR-19 for End of Third 10-Year ISI Interval for Examinations with Limited Coverage SBK-L-21067, License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2021-07-21021 July 2021 License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements SBK-L-21049, Revision to Updated Final Response to NRC Generic Letter 2004-022021-06-24024 June 2021 Revision to Updated Final Response to NRC Generic Letter 2004-02 SBK-L-21056, Response to Request for Additional Information Regarding Seabrook Steam Generator Tube Inspection Report Review References:2021-05-20020 May 2021 Response to Request for Additional Information Regarding Seabrook Steam Generator Tube Inspection Report Review References: SBK-L-21044, 2020 Annual Radiological Environmental Operating Report2021-04-30030 April 2021 2020 Annual Radiological Environmental Operating Report SBK-L-21045, Submittal of 2020 Annual Radioactive Effluent Release Report2021-04-30030 April 2021 Submittal of 2020 Annual Radioactive Effluent Release Report SBK-L-21042, Response to RIS 2021-01 Preparation and Scheduling of Operator Licensing Examinations2021-04-22022 April 2021 Response to RIS 2021-01 Preparation and Scheduling of Operator Licensing Examinations SBK-L-21033, Response to Request for Additional Information (RAI) Regarding License Amendment Request (LAR) 20-02, Resolve Non-Conservative Heat Flux Hot Channel Factor (Fo(Z)) Requirements2021-03-24024 March 2021 Response to Request for Additional Information (RAI) Regarding License Amendment Request (LAR) 20-02, Resolve Non-Conservative Heat Flux Hot Channel Factor (Fo(Z)) Requirements SBK-L-21023, Radiological Emergency Plan (Ssrep), Revision 772021-03-0404 March 2021 Radiological Emergency Plan (Ssrep), Revision 77 SBK-L-20154, Submittal of Changes to the Seabrook Station Technical Specification Bases2020-12-22022 December 2020 Submittal of Changes to the Seabrook Station Technical Specification Bases SBK-L-20149, Response to Request for Additional Information in Respect to One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-12-0808 December 2020 Response to Request for Additional Information in Respect to One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic SBK-L-20146, One-Time Exemption Request for the Biennial Emergency Preparedness Exercise Requirements of 10 CFR 50, Appendix E. IV.F.2.b and IV.F.2.c2020-12-0303 December 2020 One-Time Exemption Request for the Biennial Emergency Preparedness Exercise Requirements of 10 CFR 50, Appendix E. IV.F.2.b and IV.F.2.c SBK-L-20144, Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-23023 November 2020 Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic SBK-L-20143, Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 004-022020-11-19019 November 2020 Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 004-02 SBK-L-20132, Fourth Interval Inservice Testing (IST) Program2020-10-21021 October 2020 Fourth Interval Inservice Testing (IST) Program SBK-L-20127, Generator Tube Inspection Report2020-10-20020 October 2020 Generator Tube Inspection Report SBK-L-20117, Response to Request for Additional Information Regarding Technical Specification 3/4.8.1 for a One-Time Extension of Allowed Outage Time License Amendment Request2020-09-23023 September 2020 Response to Request for Additional Information Regarding Technical Specification 3/4.8.1 for a One-Time Extension of Allowed Outage Time License Amendment Request SBK-L-20103, Inservice Inspection Examination Report2020-07-27027 July 2020 Inservice Inspection Examination Report SBK-L-20068, License Amendment Request 20-01, One-Time Change to the Seabrook Technical Specifications A.C. Sources - Operating2020-07-13013 July 2020 License Amendment Request 20-01, One-Time Change to the Seabrook Technical Specifications A.C. Sources - Operating SBK-L-20092, Response to Request for Additional Information Regarding License Amendment Requests to Adopt TSTF-411 and TSTF-4182020-07-13013 July 2020 Response to Request for Additional Information Regarding License Amendment Requests to Adopt TSTF-411 and TSTF-418 SBK-L-20085, Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic2020-06-16016 June 2020 Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic SBK-L-20077, Core Operating Limits Report for Cycle 212020-06-0101 June 2020 Core Operating Limits Report for Cycle 21 2024-04-12
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARL-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-141, Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit2024-08-15015 August 2024 Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Be L-2024-137, Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent .2024-08-12012 August 2024 Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent . L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite.2024-07-16016 July 2024 Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite. ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-005, Response to Request for Additional Information for Seabrook Relief Request 4RA-22-0012023-01-26026 January 2023 Response to Request for Additional Information for Seabrook Relief Request 4RA-22-001 ML22307A1682022-11-0303 November 2022 Cover Memo and Response to C-10 Questions Regarding 2Q2022 Inspection Report - Corrected L-2022-157, Response to Request for Additional Information Regarding Seabrook Steam Generator Tube Inspection Report2022-09-28028 September 2022 Response to Request for Additional Information Regarding Seabrook Steam Generator Tube Inspection Report L-2022-106, Revised Response to Request for Additional Information (RAI) Regarding License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2022-06-27027 June 2022 Revised Response to Request for Additional Information (RAI) Regarding License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements ML22109A0342022-04-19019 April 2022 Cover Memo and Response to C-10 Questions Regarding 4Q2021 Inspection Report SBK-L-22024, Response to Request for Additional Information (Raj) Regarding License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2022-03-0707 March 2022 Response to Request for Additional Information (Raj) Regarding License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements ML21280A2622021-10-0707 October 2021 Response Letter to N. Treat (C-10 Research and Education Foundation) Regarding 2Q 2021 Integrated Inspection Report Questions SBK-L-21049, Revision to Updated Final Response to NRC Generic Letter 2004-022021-06-24024 June 2021 Revision to Updated Final Response to NRC Generic Letter 2004-02 SBK-L-21056, Response to Request for Additional Information Regarding Seabrook Steam Generator Tube Inspection Report Review References:2021-05-20020 May 2021 Response to Request for Additional Information Regarding Seabrook Steam Generator Tube Inspection Report Review References: SBK-L-21033, Response to Request for Additional Information (RAI) Regarding License Amendment Request (LAR) 20-02, Resolve Non-Conservative Heat Flux Hot Channel Factor (Fo(Z)) Requirements2021-03-24024 March 2021 Response to Request for Additional Information (RAI) Regarding License Amendment Request (LAR) 20-02, Resolve Non-Conservative Heat Flux Hot Channel Factor (Fo(Z)) Requirements SBK-L-20149, Response to Request for Additional Information in Respect to One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-12-0808 December 2020 Response to Request for Additional Information in Respect to One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic SBK-L-20117, Response to Request for Additional Information Regarding Technical Specification 3/4.8.1 for a One-Time Extension of Allowed Outage Time License Amendment Request2020-09-23023 September 2020 Response to Request for Additional Information Regarding Technical Specification 3/4.8.1 for a One-Time Extension of Allowed Outage Time License Amendment Request SBK-L-20092, Response to Request for Additional Information Regarding License Amendment Requests to Adopt TSTF-411 and TSTF-4182020-07-13013 July 2020 Response to Request for Additional Information Regarding License Amendment Requests to Adopt TSTF-411 and TSTF-418 SBK-L-20057, Response to Request for Additional Information Regarding Degraded Voltage Time Delay Setpoint License Amendment Request2020-05-20020 May 2020 Response to Request for Additional Information Regarding Degraded Voltage Time Delay Setpoint License Amendment Request SBK-L-19120, Response to Request for Additional Information Related to Seabrook Inverter Amendment2019-10-30030 October 2019 Response to Request for Additional Information Related to Seabrook Inverter Amendment SBK-L-18106, Response to Requests for Additional Information Related to License Renewal Application Environmental Review2018-06-14014 June 2018 Response to Requests for Additional Information Related to License Renewal Application Environmental Review SBK-L-18074, Response to Request for Additional Information Regarding License Amendment Request 16-032018-06-0707 June 2018 Response to Request for Additional Information Regarding License Amendment Request 16-03 L-2018-068, Florida Power and Light Co. - Response to Request for Additional Information Re Decommissioning Funding Plan Updates for Independent Spent Fuel Storage Installations2018-04-0303 April 2018 Florida Power and Light Co. - Response to Request for Additional Information Re Decommissioning Funding Plan Updates for Independent Spent Fuel Storage Installations SBK-L-18028, 0 - Response to Final Requests for Additional Information for the Safety Review of the Seabrook Station License Renewal Application - ASME Section XI, Subsection Iwl Program2018-02-28028 February 2018 0 - Response to Final Requests for Additional Information for the Safety Review of the Seabrook Station License Renewal Application - ASME Section XI, Subsection Iwl Program SBK-L-18027, Supplement 59 - Response to Final Requests for Additional Information for the Safety Review of the Seabrook Station License Renewal Application - 10 CFR 50 Appendix J Program2018-02-28028 February 2018 Supplement 59 - Response to Final Requests for Additional Information for the Safety Review of the Seabrook Station License Renewal Application - 10 CFR 50 Appendix J Program SBK-L-17202, Response to Seabrook Station, Unit No. 1 - Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment to Delete Operator Action and Request for Exemption2017-12-14014 December 2017 Response to Seabrook Station, Unit No. 1 - Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment to Delete Operator Action and Request for Exemption SBK-L-17204, Response to Request for Additional Information Regarding License Amendment Request Related to Alkali-Silica Reaction (CAC No. MF8260; EPID L-2016-LLA-0007)2017-12-11011 December 2017 Response to Request for Additional Information Regarding License Amendment Request Related to Alkali-Silica Reaction (CAC No. MF8260; EPID L-2016-LLA-0007) SBK-L-17180, Supplement 58, Revised Alkali-Silica Reaction Aging Management Program2017-11-0303 November 2017 Supplement 58, Revised Alkali-Silica Reaction Aging Management Program SBK-L-17169, Supplement 58 - Non-Proprietary Enclosure 1 to SBK-L-171552017-10-17017 October 2017 Supplement 58 - Non-Proprietary Enclosure 1 to SBK-L-17155 SBK-L-17170, Non-Proprietary Enclosure 1 to SBK-L-171562017-10-17017 October 2017 Non-Proprietary Enclosure 1 to SBK-L-17156 SBK-L-17156, Response to Request for Additional Information Regarding License Amendment Request 16-03 Related to Alkali-Silica Reaction2017-10-0303 October 2017 Response to Request for Additional Information Regarding License Amendment Request 16-03 Related to Alkali-Silica Reaction SBK-L-17155, Supplement 58 - Response to Request for Additional Information for the Review of the License Renewal Application - Building Deformation Analyses Related to Concrete Alkali-Silica Reaction2017-10-0303 October 2017 Supplement 58 - Response to Request for Additional Information for the Review of the License Renewal Application - Building Deformation Analyses Related to Concrete Alkali-Silica Reaction SBK-L-17133, Clarification to Supplement 55 - Response to Request for Additional Information for the Review of the Seabrook Station License Renewal Application - Bolting Integrity Program2017-08-11011 August 2017 Clarification to Supplement 55 - Response to Request for Additional Information for the Review of the Seabrook Station License Renewal Application - Bolting Integrity Program SBK-L-17103, Supplement 55 - Response to Request for Additional Information for the Review of the License Renewal Application - Bolting Integrity Program2017-06-20020 June 2017 Supplement 55 - Response to Request for Additional Information for the Review of the License Renewal Application - Bolting Integrity Program SBK-L-17087, Supplement 53 - Response to Request for Additional Information for the Review of the Seabrook Station License Renewal Application - LR-ISG-2016-01 - Changes to Aging Management Guidance for Various Steam Generator Components2017-05-25025 May 2017 Supplement 53 - Response to Request for Additional Information for the Review of the Seabrook Station License Renewal Application - LR-ISG-2016-01 - Changes to Aging Management Guidance for Various Steam Generator Components SBK-L-17082, Response to Request for Additional Information for the Review of the Seabrook Station License Renewal Application - LR-ISG-2016-01 -Changes to Aging Management Guidance for Various Steam Generator Components2017-05-19019 May 2017 Response to Request for Additional Information for the Review of the Seabrook Station License Renewal Application - LR-ISG-2016-01 -Changes to Aging Management Guidance for Various Steam Generator Components SBK-L-17063, Response to Request for Additional Information Regarding License Amendment Request 17-01 One-Time Exigent Change to the Seabrook Licensing Basis Regarding Service Water Cooling Tower Functionality2017-04-0808 April 2017 Response to Request for Additional Information Regarding License Amendment Request 17-01 One-Time Exigent Change to the Seabrook Licensing Basis Regarding Service Water Cooling Tower Functionality SBK-L-16205, Response to Request for Supplemental Information Regarding License Amendment Request 16-01, Request to Extend Containment Leakage Test Frequency and EMCB-RAI-22016-12-30030 December 2016 Response to Request for Supplemental Information Regarding License Amendment Request 16-01, Request to Extend Containment Leakage Test Frequency and EMCB-RAI-2 SBK-L-16196, Response to Request for Supplemental Information Regarding License Amendment Request 15-02, Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive...2016-12-15015 December 2016 Response to Request for Supplemental Information Regarding License Amendment Request 15-02, Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive... SBK-L-16186, Supplement 50, Response to Request for Additional Information for the Review of License Renewal Application Providing Changes to Buried and Underground Piping and Tank Recommendations2016-11-23023 November 2016 Supplement 50, Response to Request for Additional Information for the Review of License Renewal Application Providing Changes to Buried and Underground Piping and Tank Recommendations SBK-L-16190, Response to Request for Supplemental Information Regarding License Amendment Request 16-01, Request to Extend Containment Leakage Test Frequency2016-11-17017 November 2016 Response to Request for Supplemental Information Regarding License Amendment Request 16-01, Request to Extend Containment Leakage Test Frequency ML16314D4272016-11-0707 November 2016 Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.1, Flooding - Submittal of Flooding Hazards Reevaluation Report, Revision 1 L-2016-188, Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools, Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)2016-11-0303 November 2016 Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools, Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) SBK-L-16162, Response to Request for Additional Information Regarding License Amendment Request 15-02, Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors2016-10-27027 October 2016 Response to Request for Additional Information Regarding License Amendment Request 15-02, Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors SBK-L-16170, Response to Request for Additional Information for the 04/22/2016 Steam Generator Tube Inspection Report2016-10-27027 October 2016 Response to Request for Additional Information for the 04/22/2016 Steam Generator Tube Inspection Report SBK-L-16165, Response to RAI Regarding License Amendment Request 16-01, Request to Extend Containment Leakage Test Frequency2016-10-27027 October 2016 Response to RAI Regarding License Amendment Request 16-01, Request to Extend Containment Leakage Test Frequency SBK-L-16156, Response to Issuance of LR-ISG-2015-01 Changes to Buried and Underground Piping and Tank Recommendations2016-10-0707 October 2016 Response to Issuance of LR-ISG-2015-01 Changes to Buried and Underground Piping and Tank Recommendations SBK-L-16134, Response to RAI Related to Severe Accident Mitigation Alternatives License Renewal Application2016-09-0606 September 2016 Response to RAI Related to Severe Accident Mitigation Alternatives License Renewal Application 2024-09-16
[Table view] |
Text
NEXTera*
EN~
March 24, 2021 SBK-L-21033 10 CFR 50.90 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington DC 20555-0001 RE: Seabrook Station Docket No. 50-443 Renewed Facility Operating License No. NPF-86 Response to Request for Additional Information (RAI) Regarding License Amendment Request (LAR) 20-02, Resolve Non-Conservative Heat Flux Hot Channel Factor (Fo(Z)) Requirements References :
- 1. License Amendment Request 20-02 , Resolve Non-Conservative Heat Flux Hot Channel Factor (FQ(Z)) Requirements, August 17, 2020 (ADAMS Accession No. ML20230A425)
- 2. NRR Email Capture, Request for Additional Information Regarding Seabrook Heat Flux Hot Channel Requirement Amendment Request (L-2020-LLA-0187), February 23 , 2021 In Reference 1, NextEra Energy Seabrook, LLC (NextEra) requested an amendment to Renewed Facility Operating License (RFOL) NPF-86 for Seabrook Nuclear Plant Unit 1 (Seabrook) . The proposed license amendment revises the Seabrook Technical Specifications (TS) to resolve non-conservative requirements associated with the nuclear heat flux hot channel factor, Fo(Z) [RAOC-W(Z) Methodology], as reported in Westinghouse Nuclear Safety Advisory Letter (NSAL) 09-5, Revision 1, "Relaxed Axial Offset Control Fo Technical Specification Actions", dated September 23, 2009, and NSAL 15-1 , "Heat Flux Hot Channel Factor Technical Specification Surveillance", dated February 3, 2015.
In Reference 2, the NRC requested additional information determined necessary to complete its review.
The enclosure to this letter provides NextEra's response to the request for additional information (RAJ) . In addition, and as discussed in the enclosure, NextEra is proposing an additional change to the Seabrook TS. Attachment 1 to the enclosure provides the additional TS page marked up to show the proposed change. The TS marked up page in Attachment 1 is to be added to the corresponding TS marked up pages provided in Reference 1. No changes are proposed to the TS Bases pages provided in Reference 1.
The supplements included in this RAI response provide additional information that clarifies the application, do not expand the scope of the application as originally noticed, and should not change the NRC staffs original proposed no significant hazards consideration determination as published in the Federal Register.
This letter contains no new regulatory commitments.
Should you have any questions regarding this submission , please contact Mr. Ken Browne, Safety Assurance and Learning Site Director, at 603-773-7932.
NextEra Energy Seabrook, LLC P.O. Box 300, Lafayette Road , Seabrook, NH 03874
Seabrook Station SBK-L-21033 Docket Nos. 50-443 Page 2 of2 I declare under penalty of perjury that the foregoing is true and correct.
- ).d.
Executed on the
"°'day of March 2021.
Sincerely,
~~
Brian Booth Nuclear Site Vice President - Seabrook Nuclear Power Station NextEra Energy Enclosure cc: USNRC Region I Administrator USNRC Project Manager USNRC Senior Resident Inspector Director Homeland Security and Emergency Management New Hampshire Department of Safety Division of Homeland Security and Emergency Management Bureau of Emergency Management 33 Hazen Drive Concord, NH 03305 Katharine Cederberg, Lead Nuclear Planner The Commonwealth of Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA 01702-5399
Seabrook Station SBK-L-21033 Docket Nos. 50-443 Enclosure Page 1 of 8 Seabrook Station Response to Request for Additional Information (RAI) Regarding LAR 20-02.
Resolve Non-Conservative Heat Flux Hot Channel Factor (Fa(Z)) Requirements In Reference 1, NextEra requested an amendment to Renewed Facility Operating License (RFOL) NPF-86 for Seabrook Nuclear Plant Unit 1 (Seabrook). The proposed license amendment revises the Seabrook Technical Specifications (TS) to resolve non-conservative requirements associated with the nuclear heat flux hot channel factor, FQ(Z) [RAOC-W(Z) Methodology], as reported in Westinghouse NSAL 09-5, Revision 1 (Reference 2), and NSAL 15-1 (Reference 3).
In Reference 4, the NRC requested additional information determined necessary to complete its review, as provided below. NextEra's RAI response follows:
RAl#1 Justify the validity of the adoption of the Rj factor in light of the fact that doing so will result in COLR specifications that do not adhere to the methods referenced in 6.8.1.6.b.14, as required by the Seabrook TS. As necessary, consider proposing a revised TS citation that specifies, with adequate accuracy, the Seabrook-specific methods that would be used.
NextEra Response:
The current Fa Technical Specifications (TS) surveillance requirement includes the application of the greater of a 1.02 factor or a factor specified in the COLR to account for potential increases in FaW(Z) between surveillances. As stated in WCAP-17661-P-A, (Reference 5), Section 3.2.5, this penalty factor, which is now referred to as Ri, will continue to be applied, with no minimum of 2%, whenever the minimum margin to the Faw(z) limit is predicted to decrease.
The penalty factor, Ri, is generated in the same manner as for the current Fa TS surveillance, except for the elimination of 2% minimum penalty. This penalty factor, Ri, is determined using the WCAP-10216-P-A, Revision1A (Reference 6), methodology, as discussed in WCAP-17661-P-A, Section 3.2.5 and Section 5.5 (page 5-6). WCAP-10216-P-A, Revision 1A, is listed as an approved COLR methodology in TS 6.8.1.6.b. To implement the proposed methodology related to the elimination of minimum penalty of 2% and the application of the Ri penalty based on the predicted margin trends, the license amendment proposed by this amendment request will be added to the listing of COLR approved methodologies referenced in Seabrook TS 6.8.1.6.b, consistent with the NRC staffs recommendation.
Attachment 1 provides the existing TS 6.8.1.6.b page marked up to show the change proposed in this RAI response. The TS marked up page is in addition to the corresponding TS marked up pages provided in Reference 1. No changes are proposed to the TS Bases pages provided in Reference 1.
RAl#2 Justify the applicability of the Rj factor, in light of the fact that the Seabrook licensee does not intend to adopt the broader surveillance formulation described in WCAP-17661-P-A.
Seabrook Station SBK-L-21033 Docket Nos. 50-443 Enclosure Page 2 of 8 NextEra Response:
The penalty factor Ri is unrelated to the adoption of new Fa surveillance formulation and remains applicable to the current Fa formulation, based on W(z), as seen in the example of flux map application in Section 6.7 of WCAP-17661-P-A, Equation 6-1.
A note in the current Fa TS, which requires application of the greater of a 1.02 factor or a factor specified in the COLR, is to account for potential increases in Faw(z) between surveillances. As stated in WCAP-17661-P-A, Section 3.2.5, the note will be eliminated but application of the penalty factor, which is now referred to as Ri, will continue to be required whenever the minimum margin to the FaW(Z) limit is predicted to decrease. Additionally, a minimum penalty of 2% in the current TS is eliminated and the magnitude of the penalty factor is based on the predicted margin which is set to 1.0 when the margin is predicted to increase.
RAl#3 Justify the implementation of RAOC Operating Spaces as consistent with WCAP-10216-P-A, Revision 1A, or provide additional information to describe how the RAOC Operating Spaces would be formulated. As necessary, consider proposing a revised TS citation that specifies, with adequate accuracy, the Seabrook-specific methods that would be used.
NextEra Response:
The implementation of RAOC Operating Spaces remains consistent with WCAP-10216-P-A, Revision 1A. The proposed Fa margin improvement by reducing RAOC Axial Flux Difference (AFD) Operating Space, including reduction in power if necessary, is discussed in WCAP-17661-P-A in Section 3.2.3, specifically on top of page 3-14, as applicable to the current TS Faw(z) formulation with an example in Figure 3-6.
The required limits on thermal power and required reductions on AFD limits will be determined using the standard RAOC methodology of WCAP-10216-P-A, Revision 1A, which is the current method used to analyze RAOC Operating Spaces. The WCAP-10216-P-A, Revision 1A methodology is referenced in the current Seabrook TS 6.8.1.6.b.14.
RAl#4 Describe how the required margin improvements contained in Table 3 of the COLR were formulated, demonstrate that they provide the required, additional margin to justify continued operation in the event FQW(Z) exceeds its limit, and as necessary, consider proposing a revised TS citation that specifies, with adequate accuracy, the Seabrook-specific methods that would be used.
NextEra Response:
The proposed COLR changes include sample data in Table 3, which is not considered to be representative of any Seabrook cycle design. For the Seabrook cycle-specific COLR, Seabrook core design specific data will continue to be generated using the RAOC WCAP-10216-P-A, Revision 1A methodology with the discrete maximum power levels and reduced AFD limits, as required, to quantify the margin improvements. The methodology used (WCAP-10216-P-A, Revision 1A) is the same as that used in the current RAOC analysis and is in the Seabrook list of approved COLR methods for Fa referenced in TS 6.8.1.6.b.14. If more than one Operating Space is specified in the COLR, cycle specific data similar to Table 3 of the sample COLR will be generated for each of the Operating Spaces.
Seabrook Station SBK-L-21033 Docket Nos. 50-443 Enclosure Page 3 of 8 RAl#5 Discuss the applicability of LIMITATION 2 imposed in the NRG safety evaluation approving WGAP-17661-P-A to Seabrook specific methods. If the licensee determines that LIMITATION 2 is not applicable, please provide rationale for the basis of the determination. If LIMITATION 2 is applicable, please justify a value, other than 50 percent, that would be "specified in cycle specific GOLR," as stated in the LAR.
NextEra Response:
LIMITATION 2 is applicable to Seabrook and the final power decrease to 50% will be specified in the Seabrook GOLR based on the NRG's prior approval of this power level in WGAP-17661-P-A. The intent of the "as specified in cycle specific GOLR" was to allow change in the event of any future NRG approved changes. For the GOLR, implementing the changes proposed in this amendment request, Seabrook will comply with LIMITATION 2 imposed in the SE for WGAP-17661-P-A to use 50 percent as the final power level reduction.
RAl#6 Discuss how the effect of terms, such as [T(z)]GOLR and AXY(z), on the proposed FQW formulation in the GOLR were determined to involve low safety significance, and justify the adequacy of the proposed surveillance formulations in GOLR with use of FQ(Z) instead of FXY(Z) in the NRG-approved formulations (Equations 5-1 and 5-2) in WGAP-17661-P-A.
NextEra Response:
The proposed Faw formulation in the GOLR is the same as the current formulation in the TS, which is based on W(z). The acceptability/adequacy of this W(z) formulation is discussed below.
WGAP-17661-P-A states the following in RAI 15.a response:
"However, the option of using Method 1 to set Axv(z) factor to unity (as discussed in Section 4.3.1 of the TR) will still be retained as an alternative to using Method 2 to explicitly calculate the Axv(z) factor at the time of the surveillance. Setting the Axv(z) factor to 1.0 is effectively the same as not using it at all. In this respect, using Method 1 is consistent with the current Fa Surveillance methodology, which makes no correction for surveillances that are performed at conditions different than were assumed in generating the Fa surveillance factors."
"Section 4.3.1 of the TR states that setting Axv(z) to 1.0, "is a reasonable option that will in all likelihood result in conservative surveillances at off-normal conditions."
NRG SE (Section 4.1.1) on page 18, states:
"Several considerations justify an allowance to keep the RAOG surveillance uncorrected. First among these is the fact that the vast majority of surveillances are performed in a Hot Full Power (HFP), All Rods Out configuration, such that there would be little deviation from the reference condition. Stated differently, in most cases, the Axy factor would seldom deviate from unity, and deviations are usually expected to be minor. Second, the existing methodology does not include this correction. Third, in response to RAI 15.e, several tables were provided for a demonstration plant with several successive surveillances completed slightly above BO-percent RTP, with a 14-percent D-bank control rod insertion. These tables show that the Axy factor removes a small amount of conservatism from the uncorrected surveillance, meaning that, in these conditions, a unity-value Axy is conservative."
Seabrook Station SBK-L-21033 Docket Nos. 50-443 Enclosure Page 4 of 8 Based on the above conclusions documented in WCAP-17661-P-A, where the Method 1 of the new formulation is considered to be consistent with the current Fa Surveillance methodology, the use of the current Fa surveillance formulation is considered to be an acceptable method with no identified safety concerns. Also, Seabrook operates essentially with all rods out (ARO) conditions, which further justifies the use of the current Fa surveillance methodology.
References:
- 1. License Amendment Request 20-02, Resolve Non-Conservative Heat Flux Hot Channel Factor (FQ(Z)) Requirements, August 17, 2020 (ADAMS Accession No. ML20230A425)
- 2. Westinghouse Nuclear Safety Advisory Letter 09-5, Revision 1, Relaxed Axial Offset Control Fa Technical Specification Actions, September 23, 2009.
- 3. Westinghouse Nuclear Safety Advisory Letter 15-1, Heat Flux Hot Channel Factor Technical Specification Surveillance, February 3, 2015.
- 4. NRR Email Capture, Request for Additional Information Regarding Seabrook Heat Flux Hot Channel Requirement Amendment Request (L-2020-LLA-0187), February 23, 2021
- 5. Westinghouse WCAP-17661-P-A, Revision 1, Improved RAOC and CAOC Fa Surveillance Technical Specifications, February 2019 (ADAMS Accession No. ML18298A314)
- 6. Westinghouse WCAP-10216-P-A, Revision 1A, Relaxation of Constant Axial Offset Control Fa Surveillance Technical Specification, February 1994 (ADAMS Accession No. ML20063L185)
Seabrook Station SBK-L-21033 Docket No. 50-443 Enclosure Page 5 of 8 ATTACHMENT 1 PROPOSED TECHNICAL SPECIFICATION PAGES (MARKUP)
(3 pages follow)
jThis page is provided for information only. No changes are proposed on this page. j ADMINISTRATIVE CONTROLS 6.8.1.6.b The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC in:
- 1. WCAP-12945P-A, "Code Qualification Document for Best Estimate LOCA Analysis," Volume 1, Revision 2, and Volumes 2 through 5, Revision 1; Bajorek, S. M., et al, 1998.
Methodology for Specification:
3.2.2 Heat Flux Hot Channel Factor
- 2. WCAP-10079-P-A, (Proprietary) and WCAP-10080-A (Nonproprietary),
"NOTRUMP: A Nodal Transient Small Break and General Network Code",
August 1985.
Methodology for Specification:
3.2.2 Heat Flux Hot Channel Factor
- 3. YAEC-1363-A, "CASM0-3G Validation," April, 1988.
YAEC-1659-A, "SIMULATE-3 Validation and Verification,"
September, 1988.
WCAP-11596-P-A, (Proprietary), "Qualification of the PHOENIX-P/ANC Nuclear Design System for Pressurized Water Reactor Cores", June, 1988.
WCAP-10965-P-A, (Proprietary), "ANC: A Westinghouse Advanced Nodal Computer Code", September, 1986.
Methodology for Specifications:
3.1.1.1 SHUTDOWN MARGIN for MODES 1,2, 3, and 4 3.1.1.2 SHUTDOWN MARGIN for MODE 5 3.1.1.3 Moderator Temperature Coefficient 3.1.3.5 Shutdown Bank Insertion Limit 3.1.3.6 Control Rod Insertion Limits 3.2.1 AXIAL FLUX DIFFERENCE 3.2.2 Heat Flux Hot Channel Factor 3.2.3 Nuclear Enthalpy Rise Hot Channel Factor
- 4. Seabrook Station Updated Final Safety Analysis Report, Section 15.4.6, "Chemical and Volume Control System Malfunction That Results in a Decrease in the Boron Concentration in the Reactor Coolant System".
Methodology for Specifications:
3.1.1.1 SHUTDOWN MARGIN for MODES 1, 2, 3, and 4 3.1.1.2 SHUTDOWN MARGIN for MODE 5 SEABROOK - UNIT 1 6-17 Amendment No. 22, 66, 104, 115, 162
ADMINISTRATIVE CONTROLS 6.8.1.6.b (Continued)
- 12. NYN-95048, Letter from T. C. Feigenbaum (NAESCo) to NRC, "License Amendment Request 95-05: Positive Moderator Temperature Coefficient",
May 30, 1995.
Methodology for Specification:
3.1.1.3 Moderator Temperature Coefficient
- 13. WCAP-12610-P-A, "VANTAGE+ Fuel Assembly Reference Core Report".
April, 1995, (Westinghouse Proprietary).
WCAP-12610-P-A & CENPD-404-P-A, Addendum 1-A, "Optimized ZIRLO'",
July 2006.
Methodology for Specification:
3.2.2 Heat Flux Hot Channel Factor
- 14. WCAP-10216-P-A, Revision 1A (Proprietary), "Relaxation of Constant Axial Offset Control Fa Surveillance Technical Specification", February, 1994.
Methodology for Specification:
3.2.1 AXIAL FLUX DIFFERENCE 3.2.2 Heat Flux Hot Channel Factor
- 15. WCAP-9272-P-A, (Proprietary), "Westinghouse Reload Safety Evaluation Methodology", July, 1985.
Methodology for Specifications:
2.1 Safety Limits 3.1.1.1 SHUTDOWN MARGIN for MODES 1,2,3, and 4 3.1.1.2 SHUTDOWN MARGIN for MODE 5 3.1.1.3 Moderator Temperature Coefficient 3.1.2. 7 Isolation of Un borated Water Sources - Shutdown 3.1.3.5 Shutdown Bank Insertion Limit 3.1.3.6 Control Rod Insertion Limits 3.2.1 AXIAL FLUX DIFFERENCE 3.2.2 Heat Flux Hot Channel Factor 3.2.3 Nuclear Enthalpy Rise Hot Channel Factor 3.2.5 DNB Parameters 3.5.1.1 Accumulators for MODES 1, 2, and 3 3.5.4 Refueling Water Storage Tank for MODES 1, 2, 3, and 4 3.9.1 Boron Concentration
- 16. WCAP-13749-P-A, (Proprietary) "Safety Evaluation Supporting the Conditional Exemption of the Most Negative Moderator Temperature Coefficient Measurement," March, 1997.
INSERT new"17" from next page. Methodology for Specifications:
3.1.1 .3 Moderator Temperature Coefficient SEABROOK - UNIT 1 6-20 Amendment No. 66, 88, 104, 107, 115, 139, ~
INSERT for TS 6.9.1.6.b
- 17. License Amendment [XXX] issued [XX/XX/21] (ADAMS Accession No.[MLXXXXXXX])
Methodology for Specification:
3.2.2 - Heat Flux Hot Channel Factor