Letter Sequence Request |
---|
EPID:L-2021-LLR-0015, General Station - Fourth Ten-Year Interval Inservice Inspection (ISI) Program 4ISI-10, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (Open) |
|
|
|
---|
Category:Inservice/Preservice Inspection and Test Report
MONTHYEARGO2-23-097, In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26)2023-09-0606 September 2023 In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26) ML22278B0972022-10-0505 October 2022 Fourth Ten-Year Interval Inservice Inspection Program Relief Request 4ISl-11 GO2-21-107, In-Service Inspection Summary Report for the Twenty-Fifth Refueling (R25)2021-08-26026 August 2021 In-Service Inspection Summary Report for the Twenty-Fifth Refueling (R25) GO2-21-020, General Station - Fourth Ten-Year Interval Inservice Inspection (ISI) Program 4ISI-10, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2021-03-0101 March 2021 General Station - Fourth Ten-Year Interval Inservice Inspection (ISI) Program 4ISI-10, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI GO2-20-146, Erratum to Fourth Ten-Year Inservice Inspection (ISI) Program Relief Request 4ISI-092020-11-17017 November 2020 Erratum to Fourth Ten-Year Inservice Inspection (ISI) Program Relief Request 4ISI-09 ML20114E2352020-04-22022 April 2020 Columbia,Fourth Ten-Year Interval Inservice Inspection Program Relief Request 4ISI-09 ML20057E9542020-02-26026 February 2020 Fourth Ten-Year Interval Inservice Inspection Program Relief Request 4ISI-08 GO2-19-127, In-Service Inspection Summary Report for the Twenty-Fourth Refueling Outage (R24)2019-09-11011 September 2019 In-Service Inspection Summary Report for the Twenty-Fourth Refueling Outage (R24) GO2-17-153, Inservice Inspection Summary Report for the Twenty-Third Refueling Outage (R23)2017-09-12012 September 2017 Inservice Inspection Summary Report for the Twenty-Third Refueling Outage (R23) GO2-16-068, Re-Submittal of Fourth Ten-Year Interval Inservice Inspection (ISI) Program Relief Request 4ISI-072016-04-26026 April 2016 Re-Submittal of Fourth Ten-Year Interval Inservice Inspection (ISI) Program Relief Request 4ISI-07 GO2-16-008, Fourth Ten-Year Interval Inservice Inspection (ISI) Program Relief Request 4ISIS-042016-02-0404 February 2016 Fourth Ten-Year Interval Inservice Inspection (ISI) Program Relief Request 4ISIS-04 GO2-15-157, Fourth Ten-Year Interval Inservice Inspection (ISI) Program Request 4ISI-022015-12-10010 December 2015 Fourth Ten-Year Interval Inservice Inspection (ISI) Program Request 4ISI-02 GO2-15-136, In-Service Inspection Summary Report for the Twenty-Second Refueling Outage (R22)2015-09-22022 September 2015 In-Service Inspection Summary Report for the Twenty-Second Refueling Outage (R22) GO2-15-055, Submittal of Fourth 10-Year Inservice Testing (IST) Program Plan2015-04-23023 April 2015 Submittal of Fourth 10-Year Inservice Testing (IST) Program Plan GO2-15-024, Withdrawal of Inservice Inspection (ISI) Program Request 3ISI-162015-02-18018 February 2015 Withdrawal of Inservice Inspection (ISI) Program Request 3ISI-16 GO2-14-152, Erratum for Relief Requests for the Fourth Ten-Year Interval Inservice Testing Program2014-10-23023 October 2014 Erratum for Relief Requests for the Fourth Ten-Year Interval Inservice Testing Program GO2-14-017, Inservice Inspection (ISI) Program Request 3 ISI-142014-02-0606 February 2014 Inservice Inspection (ISI) Program Request 3 ISI-14 GO2-13-133, In-Service Inspection Summary Report for the Twenty-First Refueling Outage (R21)2013-09-18018 September 2013 In-Service Inspection Summary Report for the Twenty-First Refueling Outage (R21) ML13249A1602013-08-28028 August 2013 Submittal of Revision 1 of the Third Ten-Year Interval Pump and Valve Inservice Testing (IST) Program Plan GO2-11-193, In-Service Inspection Summary Report for the Twentieth Refueling Outage (R20)2011-12-14014 December 2011 In-Service Inspection Summary Report for the Twentieth Refueling Outage (R20) GO2-09-134, Inservice Inspection Summary Report for Refueling Outage R-192009-09-22022 September 2009 Inservice Inspection Summary Report for Refueling Outage R-19 GO2-07-141, Inservice Inspection Summary Report for Refueling Outage R-182007-09-18018 September 2007 Inservice Inspection Summary Report for Refueling Outage R-18 ML0708707152007-03-22022 March 2007 Response to Request for Additional Information Regarding the Third Ten-Year Interval Inservice Testing Program ML0636201472006-12-14014 December 2006 Columbia Generating Station, Second Ten-Year Interval ISI Request 2ISI-32 GO2-06-062, Correction to Third Ten-Year Interval Inservice Inspection Program Plan2006-04-27027 April 2006 Correction to Third Ten-Year Interval Inservice Inspection Program Plan GO2-05-196, Submittal of the Third Ten-Year Interval Inservice Inspection Program Plan and 10 CFR 50.55a Requests 3ISI-01 Through 3ISI-072005-12-15015 December 2005 Submittal of the Third Ten-Year Interval Inservice Inspection Program Plan and 10 CFR 50.55a Requests 3ISI-01 Through 3ISI-07 ML0527103602005-09-15015 September 2005 Enclosure, Columbia Generating, Analytical Evaluation of Inservice Inspection Examination Results GO2-05-153, Analytical Evaluation of Inservice Inspection Examination Results2005-09-15015 September 2005 Analytical Evaluation of Inservice Inspection Examination Results ML0525801582005-09-0606 September 2005 Inservice Inspection Summary Report for Refueling Outage R-17 GO2-04-065, Request to Incorporate ASME Code Case N-663 in Columbia'S Second Ten-Year Interval Inservice Inspection Program Plan2004-04-0808 April 2004 Request to Incorporate ASME Code Case N-663 in Columbia'S Second Ten-Year Interval Inservice Inspection Program Plan GO2-03-147, Inservice Inspection Summary Report for Refueling Outage R-162003-09-16016 September 2003 Inservice Inspection Summary Report for Refueling Outage R-16 2023-09-06
[Table view] Category:Letter type:GO
MONTHYEARGO2-24-109, Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations GO2-24-110, Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification GO2-24-088, Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-24024 September 2024 Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan GO2-24-051, Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2024-09-23023 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements GO2-24-082, Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-10010 September 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan GO2-24-060, Reply to a Notice of Violation, EA-21-170 and EA-23-0542024-07-30030 July 2024 Reply to a Notice of Violation, EA-21-170 and EA-23-054 GO2-24-070, Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program2024-07-29029 July 2024 Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program GO2-24-063, Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan2024-07-15015 July 2024 Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan GO2-24-057, Notice of Readiness for Supplemental Inspection2024-06-19019 June 2024 Notice of Readiness for Supplemental Inspection GO2-24-056, Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing2024-06-11011 June 2024 Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing GO2-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-13013 May 2024 2023 Annual Radiological Environmental Operating Report GO2-24-050, Annual Environmental Operating Report2024-04-30030 April 2024 Annual Environmental Operating Report GO2-24-042, 2023 Annual Radioactive Effluent Release Report2024-04-22022 April 2024 2023 Annual Radioactive Effluent Release Report GO2-24-044, Voluntary Response to Regulatory Issue Summary 2024-012024-04-11011 April 2024 Voluntary Response to Regulatory Issue Summary 2024-01 GO2-24-034, Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan2024-03-20020 March 2024 Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan GO2-24-041, Level of Financial Protection - Annual Reporting Requirement2024-03-12012 March 2024 Level of Financial Protection - Annual Reporting Requirement GO2-24-039, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462024-03-11011 March 2024 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 GO2-24-036, Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate2024-03-11011 March 2024 Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate GO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing GO2-24-014, Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-01-15015 January 2024 Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-136, Guarantee of Payment of Deferred Premium2023-12-20020 December 2023 Guarantee of Payment of Deferred Premium GO2-23-135, Notice of Readiness for Supplemental Inspection2023-12-14014 December 2023 Notice of Readiness for Supplemental Inspection GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-105, Licensing Basis Document Update and Biennial Commitment Change Report2023-12-12012 December 2023 Licensing Basis Document Update and Biennial Commitment Change Report GO2-23-107, Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation2023-12-0505 December 2023 Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-23-126, Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-012023-11-28028 November 2023 Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-01 GO2-23-121, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-27027 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation GO2-23-097, In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26)2023-09-0606 September 2023 In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26) GO2-23-100, Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication2023-08-31031 August 2023 Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication GO2-23-056, Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2023-08-29029 August 2023 Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling GO2-23-093, Supplement to Reply to a Notice of Violation: EA-21-1702023-07-27027 July 2023 Supplement to Reply to a Notice of Violation: EA-21-170 GO2-23-068, Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation2023-07-19019 July 2023 Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation GO2-23-090, Reply to a Notice of Violation2023-07-12012 July 2023 Reply to a Notice of Violation GO2-23-073, Notification of NPDES Permit Issuance2023-06-26026 June 2023 Notification of NPDES Permit Issuance GO2-23-072, Cycle 27 Core Operating Limits Report2023-06-0505 June 2023 Cycle 27 Core Operating Limits Report GO2-23-055, Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report GO2-23-006, License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications2023-05-0101 May 2023 License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications GO2-23-053, 2022 Annual Environmental Operating Report2023-04-26026 April 2023 2022 Annual Environmental Operating Report GO2-23-057, 2022 Annual Radioactive Effluent Release Report2023-04-25025 April 2023 2022 Annual Radioactive Effluent Release Report GO2-23-012, Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2023-03-27027 March 2023 Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-038, Plant Decommissioning Fund Status Report2023-03-15015 March 2023 Plant Decommissioning Fund Status Report GO2-23-041, Generation Station - Level of Financial Protection - Annual Reporting Requirement2023-03-15015 March 2023 Generation Station - Level of Financial Protection - Annual Reporting Requirement GO2-23-034, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462023-03-13013 March 2023 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 GO2-23-035, Supplement to License Amendment Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-03-0909 March 2023 Supplement to License Amendment Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling GO2-23-019, Emergency Plan - Summary of Changes and Analysis for Revision 68 of the EP-012023-02-0808 February 2023 Emergency Plan - Summary of Changes and Analysis for Revision 68 of the EP-01 GO2-22-131, Guarantee of Payment of Deferred Premium2022-12-19019 December 2022 Guarantee of Payment of Deferred Premium GO2-22-122, Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-11-28028 November 2022 Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GO2-22-076, Status of License Renewal Commitments2022-10-31031 October 2022 Status of License Renewal Commitments 2024-09-24
[Table view] |
Text
ENERGY J. Kent Dittmer Columbia Generating Station P.O. Box 968, Mail Drop PE01 NORTHWEST Richland, WA 99352-0968 Ph. 509-377-4348 F. 509-377-2354 jkdittmer@energy-northwest.com March 1, 2021 GO2-21-020 10 CFR 50.55a U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
COLUMBIA GENERATING STATION, DOCKET NO. 50-397 FOURTH TEN-YEAR INTERVAL INSERVICE INSPECTION (ISI) PROGRAM 4ISI-10, REQUEST TO USE A PROVISION OF A LATER EDITION OF THE ASME BOILER AND PRESSURE VESSEL CODE, SECTION XI
Dear Sir or Madam:
In accordance with 10 CFR 50.55a, "Codes and standards," paragraph (g)(4)(iv), and NRC Regulatory Issue Summary 2004-12, "Clarification on Use of Later Editions and Addenda to the ASME OM Code and Section Xl," dated July 28, 2004, Energy Northwest requests Nuclear Regulatory Commission (NRC) approval to use a specific provision of a later edition of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code,Section XI, for Columbia Generating Station. Specifically, Energy Northwest requests approval to use IWA-4540(b) of the 2017 Edition of the ASME B&PV Code. The details of the 10 CFR 50.55a request are included in the Enclosure.
Approval of the request is requested by April 15, 2021 to support the upcoming Columbia Generating Station refueling outage scheduled for May 2021. Once approved, the request shall be implemented within 30 days.
There are no new commitments made in this submittal. If you have any questions or require additional information, please contact Mr. R. M. Garcia, Licensing Supervisor, at 509-377-8463.
GO2-21-020 Page 2 of 2 Executed this _1st day of March 2021.
Respectfully, J. Kent Dittmer Vice President Engineering
Enclosure:
As stated cc: NRC Region IV Administrator NRC NRR Project Manager NRC Sr. Resident Inspector CD Sonoda - BPA EFSECutc.wa.gov - EFSEC E Fordham - WDOH R Brice - WDOH L Albin - WDOH
GO2-21-020 Enclosure Page 1 of 2 10 CFR 50.55a Request Number 4ISI-10 Proposed Use of Subsequent ASME Code Edition and Addenda In Accordance with 10 CFR 50.55a(g)(4)(iv) for Inservice Inspection Items
- 1. ASME Code Component(s) Affected All Class 1, 2, and 3 items located in the American Society of Mechanical Engineers (ASME)Section XI boundaries.
2. Applicable Code Edition and Addenda
The applicable ASME Section XI Code Edition and Addenda for Columbia Generating Station (Columbia) fourth ten-year Inservice Inspection (ISI) interval is the 2007 Edition through the 2008 Addenda.
- 3. Proposed Subsequent Code Edition and Addenda (or Portion)
For the current ISI Interval, Columbia performs Repair/Replacement activities in accordance with ASME Section XI, 2007 Edition through the 2008 Addenda as modified by Code of Federal Regulations 10 CFR Part 50.55a.
Pursuant to 10 CFR 50.55a(g)(4)(iv), Columbia requests permission to utilize IWA-4540(b) from the 2017 Edition. This subparagraph outlines items that are exempt from pressure testing after repair/replacement activities.
- 4. Related Requirements 10 CFR 50.55a(g)(4)(iv) states:
Inservice examination of components and system pressure tests may meet the requirements set forth in subsequent editions and addenda that are incorporated by reference in paragraph (a) of this section, subject to the conditions listed in paragraph (b) of this section, and subject to Commission approval. Portions of editions or addenda may be used, provided that all related requirements of the respective editions or addenda are met.
Federal Register, Volume 85, Number 86, dated May 4, 2020 (85 FR 26540),
incorporates by reference the 2015 and 2017 Editions of the ASME Code for inservice inspection. Columbia is requesting to use IWA-4540(b) of the 2017 Edition of ASME Section XI to utilize the exemptions listed. There are no related requirements or applicable conditions associated with this subparagraph, IWA-4540(b).
GO2-21-020 Enclosure Page 2 of 2
- 5. Duration of Proposed Relief Alternative The duration of this request is for the remainder of the current ISI Interval which expires on December 12, 2025.
6. Precedents
Docket numbers 50-424 and 50-425, Vogtle Electric Generating Plant Units 1&2 VEGP-ISI-ALT-04-06, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code,Section XI, dated July 31, 2020, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20213C712), was approved by the Nuclear Regulatory Commission (NRC) on August 6, 2020 under (EPID L-2020-LLR-01 01). This request was approved by the NRC for the same proposed request that is being submitted by Energy Northwest.
- 7. References
- 1) NRC Regulatory Issue Summary 2004-12, Clarification on Use of Later Editions and Addenda to the ASME OM Code and Section Xl, dated July 28, 2004
- 2) U.S. Nuclear Regulatory Commission Memorandum from David L. Rudland to Anna H.
Bradford, Summary of the June 25, 2020, Public Meeting with the Nuclear Industry to Discuss Title 10 of the Code of Federal Regulations Section 50.55a(b)(2)(xxvi) Condition on the Pressure Testing of Class 1, 2, and 3 Mechanical Joints, dated July 8, 2020 (ADAMS Accession No. ML20189A286)
- 3) Federal Register 26540, Volume 85, No. 86, dated May 4, 2020