ML21077A076
| ML21077A076 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 03/11/2021 |
| From: | Bates A Southern California Edison Co |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML21077A076 (1) | |
Text
~EDISON*
An EDISON INTERNATIONAL> Company ATTN: Document Control Desk U.S. *Nuclear Regulatory Commission Washington, D.C. 20555-0001 March 11, 2021
Subject:
- oocket Nos. 50-206, 50-361 and 50-362 Nuclear Property Insurance San Onofre Nuclear Generating Station Units 1, 2, and 3
Dear Sir or Madam:
Al Bates.
Manager, Regulatory Affairs 10 CFR 50.54 This letter is the report required by 1 O CFR 50.54(w)(3). The following Nuclear Property and Decontamination Liability Insurance will be in effect for the San Onofre Nuclear Generating Station on the April 1, 2021 policy renewal date:
- Policy (Amount)
Primary Property and Decontamination Liability
- insurance Policy
($130 million)
Source Nuclear Electric Insurance
. Limited (NEIL Primary)
The policy providing coverage mentioned above complies with 10 CFR 50.54(w), including
_provisions for the insurance proceeds to be prioritized for dedicated reactor stabilization/safety and then for decontamination of the site.
There are no commitments contained in this letter.
If you have any questions or require additional infomiation, please contact.me at 949-368-7024.
cc:
S. A Morris, Regional Administrator, NRC Region IV A M. Snyder, NRC Project Manager, San Onofre Units 1, 2, and 3 N D D 1
- J1---J
- SS6 l
- Jl-,e_
A)Hs--5.