ML21063A527

From kanterella
Jump to navigation Jump to search
Acknowledgment of Response to Triennial Fire Inspeection Report 05000416/2020013 and Notice of Violation
ML21063A527
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 03/08/2021
From: Nick Taylor
NRC/RGN-IV/DRS/EB-2
To: Franssen R
Entergy Operations
Okonkwo N
References
IR 2020013
Download: ML21063A527 (3)


See also: IR 05000416/2020013

Text

March 8, 2021

Mr. Robert Franssen, Site Vice President

Entergy Operations, Inc.

Grand Gulf Nuclear Station

P.O. Box 756

Port Gibson, MS 39150

SUBJECT: GRAND GULF NUCLEAR STATION - ACKNOWLEDGMENT OF RESPONSE

TO TRIENNIAL FIRE PROTECTION INSPECTION REPORT

05000416/2020013 AND NOTICE OF VIOLATION

Dear Mr. Franssen:

On December 3, 2020, the U.S. Nuclear Regulatory Commission (NRC) cited Grand Gulf

Nuclear Station for failure to complete corrective actions for multiple spurious operation

concerns identified in 2011 and documented as non-cited violation 05000416/2017008-01,

Untimely Corrective Action. The Notice of Violation, enclosed with Inspection Report 05000416/2020013 (Agencywide Documents Access and Management System Accession No.

ML20338A271), required you to respond in writing within 30 days. As referenced in your

response by letter dated February 1, 2021, the NRC granted an extension of an additional 30

days for the response.

We have reviewed your response and find that it meets the requirements of the Code of Federal

Regulations (10 CFR) 2.201. We have no further questions at this time and will review the

implementation of your corrective actions during a future inspection to determine whether full

compliance has been achieved and maintained.

In accordance with 10 CFR 2.390 of the NRC's "Agencys Rules of Practice and Procedure," a

copy of this letter will be made available electronically for public inspection in the NRC Public

R. Franssen 2

Document Room or from the NRCs Agencywide Documents Access and Management System,

which is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

Sincerely,

Nicholas Digitally signed by

Nicholas H. Taylor

H. Taylor Date: 2021.03.08

10:57:04 -06'00'

Nick Taylor, Chief

Engineering Branch 2

Division of Reactor Safety

cc: Distribution via LISTSERV

ML21063A527

SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: NPO Yes No Publicly Available Sensitive NRC-002

OFFICE DRS/EB2 DRP/BC ORA/ACES DRS/EB2

NAME NOkonkwo JKozal JGroom NTaylor

SIGNATURE /RA/ /RA/ /RA/ /RA/

DATE 03/05/2021 03/05/2021 03/05/21 03/08/2021