Post Fukushima Order Implementation Status
ML21055A547
Person / Time
Issue date: 01/08/2021
From: Robert Bernardo
NRC/NRR/DORL/LPMB
To:
Bernardo R
References
Download: ML21055A547 (2)


Text

January 8, 2021 Post Fukushima Order Implementation Status Mitigating Strategies (MS) Order (EA-12-049) Compliance Status

- As of June 18, 2018, all operating power reactor units are in compliance with Order EA-12-049.

- The NRC staff performed inspections in accordance with NRC Inspection Manual Temporary Instruction 2515/191 (TI-191) after all units at a site were in compliance to verify that required FLEX equipment and connections are in place.

- As of June 28, 2019, the staff has completed TI-191 inspections at all operating power reactor sites.

Spent Fuel Pool Instrumentation (SFPI) Order (EA-12-051) Compliance Status

- As of June 30, 2017, all operating power reactor units are in compliance with Order EA-12-051.

- The NRC staff inspected for compliance with the SFPI Order in conjunction with the inspections for Order EA-12-049.

Severe Accident Capable Hardened Containment Vent System (HCVS) Order (EA-13-109) Compliance Status

- As of June 21, 2019, all 17 applicable operating boiling-water reactor sites subject to the order are in full compliance with the order.

- The NRC staff is performing inspections for compliance with the HCVS Order in accordance with NRC Inspection Manual Temporary Instruction 2515/193 (TI-193).

- A pilot TI-193 inspection was completed at Dresden on July 28, 2018. The staff has completed TI-193 inspections at 14 sites and expects to complete the inspections at the remaining 3 sites in calendar year 2021.

A table with the Order Compliance Status is provided on the following page. Site names that are highlighted in green have completed all post-Fukushima activities. The NRC has issued a completion letter to those sites highlighted in dark green.

January 8, 2021 Order Implementation Status for Operating Reactors - By Region