From: Santos, Cayetano Sent: Friday, January 29, 2021 2:37 PM To: Vogtle PEmails
Subject:
FW: Question on 10 CFR 73.55 applicability milestone for VRG Attachments: Question to Staff on 73.55 Milestone Basis.pdf From: Kellenberger, Nicholas <X2NRKELL@SOUTHERNCO.COM>
Sent: Friday, January 15, 2021 11:21 AM To: King, Mike <Michael.King2@nrc.gov>
Cc: Roberts, Kelli Anne <KROBERTS@southernco.com>; Leighty, Steven <sleighty@southernco.COM>
Subject:
[External_Sender] Question on 10 CFR 73.55 applicability milestone for VRG
- Mike, As discussed during the touchpoint call on Wednesday, attached is our question on 10 CFR 73.55(a)(4).
As I say in the attached, we dont think we will need to submit any licensing action related to the Protected Area. Our plan is still to establish the PA prior to 103(g), but as Kelli said during the December VRG, we still do not understand the Staffs regulatory basis for tying PA establishment to 103(g).
- Thanks, Nick Kellenberger Site Licensing Supervisor Vogtle 3 and 4 phone: (706) 437-2333 mobile: (803) 391-9671
Hearing Identifier: Vogtle_COL_Docs_Public Email Number: 604 Mail Envelope Properties (MN2PR09MB52445610957728BB2421BF83E5B99)
Subject:
FW: Question on 10 CFR 73.55 applicability milestone for VRG Sent Date: 1/29/2021 2:36:49 PM Received Date: 1/29/2021 2:36:53 PM From: Santos, Cayetano Created By: Cayetano.Santos@nrc.gov Recipients:
"Vogtle PEmails" <Vogtle.PEmails@nrc.gov>
Tracking Status: None Post Office: MN2PR09MB5244.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 1067 1/29/2021 2:36:53 PM Question to Staff on 73.55 Milestone Basis.pdf 190859 Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
SNCstillplanstoestablishthePApriortothe10CFR52.103(g)finding.Wedonotforeseeaneedto
requestanexemptionfrom10CFR73.55(a)(4)aspreviouslydiscussed.However,ifthatexemption
becomesanecessity,itisimportantthatSNCandtheStaffhaveacommonunderstandingofthe
regulatorybasisoftheapplicableregulation.AsrequestedattheDecemberVRG,SNCispreparingto
discussthistopicatthe1/21/21cVRGandwouldliketoreceivefeedbackonthequestionposedduring
the9/2/20cVRG(copiedbelow).The9/2meetingfollowedan8/27/20publicmeeting.Afterthe
9/2/20cVRGSNCidentifiedfurtherinformationfromtheCOLAreviewwhichisprovidedbelowand
substantiatesthepositionSNChascommunicatedtothestaffregardingthemilestoneofpriortoinitial
fuelloadbeingapplicabletotheapplicabilityof10CFR73.55.
Question:
SNCseekstounderstandtheregulatorybasistosupporttyingtheapplicabilityof10CFR73.55tothe10
CFR52.103(g)finding.SNCunderstandsthedefinitionofoperationalphasebutcannotfindatiefrom
theoperationalphaseto10CFR73.55.Also,SNCcannotfindsupportintheregulations,licensingbasis,
orregulatoryguidanceforthestaffsassertionthattheProtectedAreaexistsatthe10CFR52.103(g)
finding.
Background:
ThefollowinginformationisprovidedtorefreshthestaffonthediscussionsheldinAugustand
SeptemberandtoprovidehistoricalcorrespondencethatwasidentifiedaftertheSeptemberVRG.
8/27/20PublicMeeting
DuringthemeetingNRCstaffprovidedapresentation(ML20238C109)inwhichtheyprovidedtheir
interpretationofwhenthelicenseemustbeincompliancewith10CFR73.55.10CFR73.55(a)(4)
requiresimplementationof73.55priortofuelbeingallowedonsite(protectedarea).Thestaffstated
theprotectedareaexistsatthe10CFR52.103(g)findingbecauseallphysicalsecuritySSCrequiredby
regulationwillhavebeenconstructedandfoundacceptablebythestaff.Theystatedthat10CFR73.55
appliestopowerreactorsintheoperationalphase,andthatplantsareintheoperationalphasewhen
the52.103(g)findingismade.Therefore,10CFR73.55appliesuponthesetwoconditions:1)10CFR
52.103(g)findinghasbeenmadeand2)fuelassembliesarecontainedwithinthePAboundary.
DuringthemeetingSNCprovidedthepositionbasedonreviewofintheITAAC,SNMPP,andPSP,SNC
thatthelicensingbasis:
x AllowsforreceiptandstorageofSNMundertheSNMPPP;
x Oncenewfuelisstored,itmustremainprotectedinaccordancewiththeSNMPPPuntilthePAis
declaredoperationalinaccordancewith10CFR73.55;
x ProtectioninaccordancewiththeSNMPPPislimitedtothedefinedCAA;and
x OnceprotectionofSNMisrequiredoutsidetheboundsoftheSNMPPP,SNCmustmeetthe
requirementsinUFSARTable13.4201byhavinganoperationalprotectedareacompliantwith
allaspectsof10CFR73.55.
SNCsreviewoftheregulationsandrulemakingfor10CFR73.55foundnoclearanddocumented
regulatorytiebetween10CFR73.55andthe10CFR52.103(g)finding.
9/2/20cVRG
SNCprovidedadditionalinformationduringthemeetingandprovidedcommentsandquestionsonthe
staffspositionpresentedduringthe8/27/20publicmeeting.
NRCposition:AllphysicalsecuritySSCsrequiredtoimplementourPhysicalSecurityPlanarenotcovered
byITAAC
SNCcomment:Aslicensed,theUnit3ITAAConlycoverthreesidesofthePAboundary.PAisintegrated
forUnits1through3,ITAACdoesnotcoverUnit1&2SSCsortheintegrationactivities.TheNRC
acceptedsecurityUINsandthesubmittedICNsstate,TheVEGPUnit3PlantSecuritySystemITAACs
onlycovertheUnit3plantsecuritysystemdesigncommitmentscope.
NRCPosition:10CFR73.55appliestoplantsintheoperationalphase.
SNCComment:NRCsdraftandfinalRulefor10CFR73.55(RIN3150AG63)appeartobesilentonatie
of73.55totheoperationalphaseandtothe103(g)finding.
NRCPosition:TheprotectedareaexistswhentheSSCsareinstalledandtested.
SNCComment:Thedefinitionofprotectedareafrom10CFR73.2Definitions,Protectedareameansan
areaencompassedbyphysicalbarriersandtowhichaccessiscontrolled.
Thedefinitionrequiresmorethanjustthephysicalsecurityhardwarerequiredbyregulationtoexist
foraPAtoexist,controlofaccessmustbeimplementedforaPAtoexist.Theabilitytocontrolaccess
requirestheotheraspectsoftheprogramrequiredby73.55thatareoutsideofITAAC(e.g.,staffing,
training,procedures,etc.)
NRCPosition:Alternatively,licenseesmayrelyontheirNRCapproved10CFR73.67planstoprotect
specialnuclearmaterialpriortothe10CFR52.103(g)finding.
SNCComment:NotieswereidentifiedintheSNMPPPorPSPthattiestheirusetothe103(g)finding.No
limitationswereidentifiedintheregulationontheuseof73.67toprotectnewfuelafterthe103(g)
finding.
NUREG2124FinalCOLASER,section1.5.5discussesthetransitionfromtheSNMPPPunder73.67tothe
73.55PAusingthefollowinglanguage:
TheapplicantalsostatedthatoncethePAisdeclaredoperationalinaccordancewith10CFR
73.55(a)(4),theannex[containingtheSNMPPP]wouldnolongerberequiredandcouldberemovedin
accordancewith10CFR50.54(p).
ThistypeoflanguagetyingthesunsettingoftheSNMPPPtothedeclarationofanoperationalPAunder
73.55isrepeatedthreetimes
Informationidentifiedafterthe9/2/20cVRG
DuringtheCOLAreviewtheNRCaskedRAI13.06VR2whichasked,inpart,
IntheabsenceofexistingNRCregulationregardingthetimingforprovidinganoperationalPA,
identifytheappropriatemilestonefordeclarationofanoperationalPAandimplementationof
the§73.55requirements,andspecifyanacceptableregulatoryframeworkforassuringthe
licensee'sadherencetothismilestoneactivity.
SNCresponsetothisportionoftheRAI,
IntheabsenceofexistingNRCregulationregardingthetimingforprovidinganoperationalPA,
theapplicantproposestheadditionofanewlicenseconditiontoprovideassuranceofthe
licensee'sadherencetothismilestoneactivity.Thismilestonewouldspecifythatnewfuelas
SNMmaybereceivedandstoredinacontrolledaccessarea(CAA)inaccordancewiththe
requirementsof10CFR73.67,untilsuchtimeasanoperationalPAthatsatisfiesthe
requirementsof10CFR73.55(e)(8)isestablished.BecauseSNMwillbestoredinsidetheCAA,
whichisentirelyencompassedwithintheboundaryoftheproposedPA,upondeclarationofan
operationalPA,theremainingrequirementsof10CFR73.55shallbeimplemented.ThePAshall
beestablishedanddeclaredoperationalpriortoinitialfuelload.
VogtleCOLAPart10wasrevisedinCOLARevision8toincludethisproposedlicensecondition:
ThelicenseeshallreceiveandstorenewfuelasSNMinacontrolledaccessarea(CAA)in
accordancewiththerequirementsof10CFR73.67,untilsuchtimeasanoperationalprotected
area(PA)thatsatisfiestherequirementsof10CFR73.55(e)(8)isestablished.Ifnewfuelis
alreadystoredinaCAAthatiswithintheboundaryoftheproposedPA,thenupondeclaration
ofanoperationalPA,theremainingrequirementsof10CFR73.55shallbeimplemented.ThePA
shallbeestablishedanddeclaredoperationalpriortoinitialfuelload.
(SNCletterND110313,ADAMSAccessionNo.ML110660153)
WhiletheproposedlicenseconditiondidnotendupintheCOL,SNCcannotfindanystaffresponse
rejectingtheinformationprovidedinthedocketedcorrespondencefromtheCOLA.
ThisresponsewasbasedontheguidancefoundinRG5.76whichties10CFR73.55applicabilitytowhen
thePAboundarymeets10CFR73.55(e)(8)andtheprotectedareabeingdeclaredoperationalnottothe
10CFR52.103(g)finding.
(U)Exceptformixedoxide(MOX)fuelassemblies,theCommissionrequirementsof10CFR73.67,
LicenseeFixedSiteandInTransitRequirementsforthePhysicalProtectionofSpecialNuclear
MaterialofModerateandLowStrategicSignificance,applyandmustbemetuntilfuelassemblies
arereceivedinsideanoperationalprotectedarea.Consistentwith10CFR73.55(a)(4),applicantsfor
anoperatinglicenseundertheprovisionsof10CFRPart50,orholdersofaCOLundertheprovisions
of10CFRPart52,shallimplementtherequirementsof10CFR73.55beforespecialnuclearmaterial
(SNM)intheformoffuelassembliesareallowedonsite(intheprotectedarea).Anacceptable
methodtomeetthisrequirementisforlicenseestodeterminewhentheprotectedareameetsthe
requirementsof10CFR73.55(e)(8).Whenthisisaccomplishedandtheprotectedareahasbeen
declaredoperational,therequirementsof73.55(a)(4)apply.
Whilethisguidancedoesnotreference10CFR52.103(g)orfuelloaditisconsistentwithSNCscurrent
positionandSNCs2011RAIresponse.