COL Docs - Slides for Protected Area Declaration Meeting 8-27-20ML20238C109 |
Person / Time |
---|
Site: |
Vogtle |
---|
Issue date: |
08/25/2020 |
---|
From: |
NRC |
---|
To: |
NRC/NRR/DNRL |
---|
References |
---|
Download: ML20238C109 (11) |
|
|
---|
Category:E-Mail
MONTHYEARML24311A2242024-11-0606 November 2024 NRR E-mail Capture - Change to Estimated Completion Date for the SNC Fleet Physical Barrier Exemptions (L-2023-LLE-0018 and L-2023-LLE-0021) ML24290A1572024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley and Vogtle 1 and 2 - Alternative Request for Pressurizer Welds (L-2024-LLR-0047) ML24290A1552024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley, Hatch, and Vogtle 1 and 2 - Proposed Alternative Request for Code Case N-572 ML24289A2002024-10-15015 October 2024 NRR E-mail Capture - for Your Action - RAI - Proposed License Amendment Request (LAR) for Vogtle Electric Generating Plant, Units 3 and 4 TS 3.7.6 Action E and SR 3.7.6.5 (L-2024-LLA-0083) ML24261B9282024-09-17017 September 2024 NRR E-mail Capture - for Your Action Discussion Points - Steam Generator Tube Inspection Call with SNC Regarding Vogtle, Unit 3 ML24250A1132024-09-0303 September 2024 Inspection Report 2024004 Radiation Safety Baseline Inspection Information Request ML24247A0092024-09-0303 September 2024 NRR E-mail Capture - Fyi - Revised Estimated Completion Date - Vogtle 3 and 4 - UFSAR Scheduler Exemption Request ML24250A1922024-08-29029 August 2024 Amendment Nos. 223/206 (1) - Email ML24232A0052024-08-16016 August 2024 NRR E-mail Capture - Acceptance Review - LAR and Exemption Request to Remove Tier 1 and Tier 2 Requirements for Vogtle 3 and 4 ML24253A0722024-08-15015 August 2024 Perspectives on Proposed Removal of Tier 1 and Tier 2 Requirements ML24225A0062024-08-0909 August 2024 NRR E-mail Capture - Acceptance Review - Vogtle 3 and 4 - LAR Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves), Action a and SR 3.7.6.6 (L-2024-LLA-0101) ML24206A0252024-07-20020 July 2024 NRR E-mail Capture - for Your Comments - State of Georgia - Vogtle Unit 1 - Emergency License Amendment Request for Technical Specification 3.7.9 ML24199A1592024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information - Vogtle 3 and 4 - Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Report ML24198A1672024-07-16016 July 2024 NRR E-mail Capture - Acceptance Review Vogtle 3 and 4 - License Amendment Request Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Surveillance Requirement L-2024-LLA-0083 ML24197A1572024-07-15015 July 2024 NRR E-mail Capture - Acceptance Review - Farley and Vogtle 1 and 2, LAR - TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown ML24197A0172024-07-12012 July 2024 NRR E-mail Capture - Fyi - Acceptance Review - Farley and Vogtle 1 and 2 - Alternative Request for Pressurizer Welds ML24194A0032024-07-11011 July 2024 NRR E-mail Capture - Fyi - Acceptance Review - Farley, Hatch, and Vogtle 1 and 2 - Alternative Request for Code Case N-572 ML24180A0012024-06-26026 June 2024 NRR E-mail Capture - Acceptance Review Farley 1 and 2 and Vogtle 1 and 2 - Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) (L-2024-LLR-0041) ML24170A9362024-06-18018 June 2024 NRR E-mail Capture - Fyi - Change to Estimated Completion Date for the SNC Fleet Physical Barrier Exemptions (L-2023-LLE-0018 and L-2023-LLE-0021) ML24178A3422024-05-16016 May 2024 NRR E-mail Capture - Request for Call - Proposed Vogtle 3 & 4 Tier 1 and Tier 2 Exemptions and LAR ML24120A0262024-04-29029 April 2024 COL Docs - FW Vogtle Electric Generating Plant, Unit 4 - Project Manager Reassignment ML24120A0462024-04-29029 April 2024 COL Docs - Re Fyi - SNC Notification Received of Vogtle Unit 4 - Completion of Power Ascension Tests ML24119A0012024-04-28028 April 2024 COL Docs - Fyi - SNC Notification Received of Vogtle Unit 4 - Completion of Power Ascension Tests ML24108A0132024-04-16016 April 2024 NRR E-mail Capture - (External_Sender) Responses from Wednesday 4/10/2024 Call with Southern Nuclear Operating Co. Vogtle 3&4 Licensing Actions ML24107A7292024-04-15015 April 2024 Request for Vogtle Electric Generating Plant Units 1 & 2 - Radiation Protection Inspection - Inspection Report 2024-02 ML24107A9322024-04-15015 April 2024 Document Request for Vogtle Electric Generating Plant Units 1 & 2 - Radiation Protection Inspection Report 2024-02 ML24106A0522024-04-12012 April 2024 NRR E-mail Capture - Acceptance Review - Vogtle 1 and 2 - Emergency Diesel Generator (EDG) Voltage and Frequency License Amendment Request (LAR) (L-2024-LLA-0031) ML24100A7842024-04-0909 April 2024 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Vogtle, Units 3 and 4 - Alternative Request for Explosively Actuated Valves (L-2023-LLR-0016) ML24099A0372024-04-0505 April 2024 NRR E-mail Capture - Acceptance Review - Vogtle Unit 3, License Amendment Request (LAR) Technical Specification (TS) 5.5.13, Ventilation Filter Testing Program (VFTP) - L-2024-LLA-0043 ML24095A2412024-04-0404 April 2024 NRR E-mail Capture - Acceptance Review for the Exemption Request Regarding the Final Safety Analysis Report Update Schedule at Vogtle, Units 3 and 4 ML24072A3982024-03-12012 March 2024 NRR E-mail Capture - for Your Action - Second Round Request for Additional Information (RAI) - Vogtle, Unit 1 - SG Tube Inspection Report - 1R24 (L-2023-LRO-0067) ML24061A2372024-03-0101 March 2024 SNC Email Dated March 1, 2024, Regarding SNC Response to NRC Letter for Vogtle 3 & 4 RES Info ML24057A0872024-02-23023 February 2024 NRR E-mail Capture - Acceptance Review - Alternative Request for Explosively Actuated Valves at Vogtle, Units 3 and 4 ML24046A1352024-02-15015 February 2024 COL Docs - Fyi - SNC Notification Received of Vogtle Unit 4 - Completion of Initial Criticality and Low-Power Testing ML24039A1122024-02-0808 February 2024 COL Docs - Re Fyi - SNC Notification Received of Vogtle Unit 4 Completion of Pre-Critical Tests ML24039A0882024-02-0808 February 2024 COL Docs - Fyi - SNC Notification Received of Vogtle Unit 4 Completion of Pre-Critical Tests ML24039A1922024-02-0808 February 2024 COL Docs - Correction - Re Fyi - SNC Notification Received of Vogtle Unit 4 Completion of Pre-Critical Tests ML24031A0502024-01-31031 January 2024 COL Docs - FW Erroneous Description of Tier 2 Change Process in Construction Lessons-Learned Report ML24017A1122024-01-17017 January 2024 NRR E-mail Capture - Request for Access to Cyber Security Data - Vogtle, Units 3 and 4 ML23360A0042023-12-23023 December 2023 NRR E-mail Capture - Fyi - Office of Nuclear Regulatory Research (RES) Requests for Vogtle 3 & 4 ML23348A0782023-12-13013 December 2023 NRR E-mail Capture - Voluntary Request for Closed Meeting Regarding Cyber Security Assessments at Vogtle, Units 3 and 4 ML23342A0802023-12-0808 December 2023 NRR E-mail Capture - Request for Additional Information (RAI) - Vogtle, Unit 1 - Review of SG Tube Inspection Report for Refueling Outage 24 (L-2023-LRO-0067) ML23331A9992023-11-27027 November 2023 COL Docs - Re Re Re ML23079A125 - Vogtle Electric Generating Station, Unit 3, NRC Response Letter to P. Durand, Regarding Comment on Federal Register Notice License Amendment No. 189 ML23331A9492023-11-26026 November 2023 Email Dated November 26, 2023, from Bo Pham to SNC and NRC - Vogtle Seismic Hazard Report ML23331A9622023-11-22022 November 2023 Email Dated November 22, 2023, from SNC to NRC - Vogtle Seismic Hazard Report ML23326A2802023-11-22022 November 2023 COL Docs - Re Re ML23079A125 - Vogtle Electric Generating Station, Unit 3, NRC Response Letter to P. Durand, Regarding Comment on Federal Register Notice License Amendment No. 189 ML23320A0342023-11-16016 November 2023 COL Docs - Re Acceptance Review of Southern Nuclear Operating Company’S License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23312A2632023-11-0808 November 2023 COL Docs - Action Request for State of Georgia Comment by 5pm Monday, November 13, 2023 - Vogtle Units 3&4, LAR-22-002, TS 3.8.3, Inverters - Operating Completion Time Extension ML23320A2372023-11-0808 November 2023 NRR E-mail Capture - (External_Sender) Proposed LAR Regarding the Ultimate Heat Sink at Vogtle, Units 1 and 2 ML23311A1512023-11-0707 November 2023 COL Docs - Re Acceptance Review of Southern Nuclear Operating Company’S License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) 2024-09-03
[Table view] |
Text
From:
Santos, Cayetano Sent:
Tuesday, August 25, 2020 3:29 PM To:
Vogtle PEmails Cc:
Schiller, Alina
Subject:
Slides for Protected Area Declaration Meeting 8-27-20 Attachments:
Vogtle 3 Public Meeting 8-27-2020 Final.pdf
Hearing Identifier:
Vogtle_COL_Docs_Public Email Number:
585 Mail Envelope Properties (BL0PR0901MB4177568DE958169C96163930E5570)
Subject:
Slides for Protected Area Declaration Meeting 8-27-20 Sent Date:
8/25/2020 3:28:37 PM Received Date:
8/25/2020 3:28:42 PM From:
Santos, Cayetano Created By:
Cayetano.Santos@nrc.gov Recipients:
"Schiller, Alina" <Alina.Schiller@nrc.gov>
Tracking Status: None "Vogtle PEmails" <Vogtle.PEmails@nrc.gov>
Tracking Status: None Post Office:
BL0PR0901MB4177.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3
8/25/2020 3:28:42 PM Vogtle 3 Public Meeting 8-27-2020 Final.pdf 1180442 Options Priority:
Normal Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Implementation of 10 CFR 73.55
10 CFR 73.55(a)(4) 10 CFR 73.55(a)(4): [H]olders of a combined license under the provisions of part 52 of this chapter, shall implement the requirements of this section before fuel is allowed onsite (protected area).
2009 Power Reactor Security Rule: Section 73.55(a)(4) establishes when an applicants physical protection program must be implemented. The Commission concluded that the receipt of special nuclear material (SNM) in the form of fuel assemblies onsite, i.e. in the licensees protected area, is the event that subjects a licensee to the requirements of § 73.55. It is the responsibility of the applicant/
licensee to implement an effective physical protection program before SNM in the form of fuel assemblies is received in the protected area. (74 FR 13936, Mar. 27, 2009) 2
Protected Area at 52.103(g) Finding
- The licensee will have a constructed plant with all physical security hardware required by regulation (including the protected area hardware required by 10 CFR 73.55).
- The NRC, through making the 52.103(g) finding, will have found that the requirements for this hardware were met.
- 10 CFR 73.55 provides requirements for a power reactor in the operations phase and the facility is in the operations phase when the 10 CFR 52.103(g) finding is made.
3
Prior to 52.103(g) Finding
4
10 CFR 73.55 Considerations
- The licensee is required to implement the requirements of 10 CFR 73.55 before the following conditions are met:
-10 CFR 52.103(g) finding (because the protected area exists by this point), and
-fuel assemblies onsite in the licensees protected area.
5
10 CFR 73.55 Considerations For Example:
3/4 If a licensee does not implement 10 CFR 73.55 before the 52.103(g) finding and is protecting the fuel under its 10 CFR 73.67 plan at a location within what will become the protected area, then it would have to meet the requirements of 10 CFR 73.55 at the 52.103(g) finding, as required by 10 CFR 73.55(a)(4).
3/4 If a licensee does not implement 10 CFR 73.55 before the 52.103(g) finding and is protecting the fuel under its 10 CFR 73.67 plan at a location outside the protected area after the 52.103(g) findingthe licensee is not required to implement 10 CFR 73.55 until it brings the fuel into the protected area after the 52.103(g) finding is made.
6
Questions?
=
Background===
Slide
Specifics on April 13, 2017 Letter Although the protected area does have physical security-inspections, tests, analyses, and acceptance criteria (PS-ITAAC) associated with it, that does not prohibit implementing 10 CFR 73.55 in advance of the 10 CFR 52.103(g) finding. An operable protected area before the 52.103(g) finding would be supporting only those activities that can be legally undertaken before the 52.103(g) finding is made. However, licensees need to ensure that all the elements of their security plans required by 10 CFR 73.55 are implemented or that compensatory measures that meet the requirements of 10 CFR 73.55(o) have been implemented.
Licensee:
Ensure that all the structures, systems and components necessary to meet the 10 CFR 73.55 requirements are in operable condition.
Satisfy the PS-ITAAC related to the Physical Protection Program and submit the ITAAC closure notifications for these ITAAC.
NRC:
Shall have the opportunity to inspect the licensees implementation of the 10 CFR 73.55 plan to ensure that the plan is properly implemented in accordance with regulatory requirements.
Will need to confirm that all PS-ITAAC related to the Physical Protection Program are satisfactorily met and applicable operational programs are in place or that compensatory measures are implemented for both.
Will conduct, as appropriate, the inspection of all programs and procedures required under 10 CFR 73.55, before the licensee declares the protected area operable (ML17074A370).