ML21006A020

From kanterella
Jump to navigation Jump to search

Summary of Meeting Between the U.S. Nuclear Regulatory Commission Staff and the Electric Power Research Institute to Discuss MRP-230, Revision 3
ML21006A020
Person / Time
Site: Electric Power Research Institute
Issue date: 02/11/2021
From: Joseph Holonich
Licensing Processes Branch
To: Dennis Morey
Licensing Processes Branch
Holonich J
References
EPID L-2020-PPM-0002
Download: ML21006A020 (2)


Text

February 11, 2021 MEMORANDUM TO:

Dennis C. Morey, Chief Licensing Processes Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:

Joseph J. Holonich, Senior Project Manager /RA/

Licensing Processes Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF JANUARY 12, 2021, MEETING BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION STAFF AND THE ELECTRIC POWER RESEARCH INSTITUTE TO DISCUSS MRP-230, REVISION 3 (L-2020-PPM-0002)

On January 12, 2021, the U. S. Nuclear Regulatory Commission (NRC) staff met with representatives from the Electric Power Research Institute (EPRI). The purpose of the meeting was to discuss the Materials Reliability Program: Functionality Analysis for Westinghouse and Combustion Engineering Representative PWR [Pressurized Water Reactor] Internals (MRP-230, Revision 3). The information related to the meeting including the meeting attendee list can be found in Agencywide Documents Access and Management System Package Accession No. ML21005A044.

The meeting was bifurcated in two parts. The first part was open to the public. In that part, the EPRI representatives provided a general overview of MRP-230, Revision 3. In the closed portion of the meeting, the EPRI representatives discussed in detail the analyses and results contained in MRP-230, Revision 3. A nonproprietary version of the presentation was not provided and thus is not available for stakeholders. A few questions were asked by the NRC staff to help gain a better understanding of the analyses.

In closing the meeting, the EPRI representatives stated that this meeting along with several other informational meetings on different reports will help provide the NRC staff with a technical base for review MRP-227, Revision 2, Pressurized Water Reactor (PWR) Internals Inspection and Evaluation Guidelines, when it is submitted.

Docket No. 99902021 CONTACT: Joseph Holonich, NRR/DORL 301-415-7297

ML21005A044 (Package)

ML21006A020 (Summary)

  • via e-mail OFFICE NRR/DORL/LLPB/PM*

NRR/DORL/LLPB/LA*

NRR/DNLR/NVIB/BC*

NAME JHolonich DHarrison HGonzalez DATE 01/20/2021 01/22/2021 02/11/2021 OFFICE NRR/DORL/LLPB/BC*

NRR/DORL/LLPB/PM*

NAME DMorey JHolonich DATE 02/11/2021 02/11/2021