Letter Sequence Meeting |
|---|
|
Administration
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
|
MONTHYEARML20322A3202020-10-31031 October 2020 Materials Reliability Program: Functionality Analysis for Babcock & Wilcox Representative PWR Internals (MRP-229, Revision 4) NON-PROPRIETARY Project stage: Request ML20322A3212020-11-17017 November 2020 Transmittal Letter for Topical Report MRP-229, Revision 4 Project stage: Request ML21006A0102021-01-0606 January 2021 Transmittal Email for Withholding Determination of MRP-229, Rev 4 Project stage: Other ML21006A0112021-01-0606 January 2021 NRC 897 Withholding Determination for MRP-229 Rev 4 Project stage: Other ML21006A0202021-02-11011 February 2021 Summary of Meeting Between the U.S. Nuclear Regulatory Commission Staff and the Electric Power Research Institute to Discuss MRP-230, Revision 3 Project stage: Meeting ML21049A0692021-02-18018 February 2021 NRC Staff Withholding Determination for Feb 23, 2021 Meeting on MRP-229, Rev 4 Project stage: Meeting ML21019A0062021-02-18018 February 2021 NRC Form 897 for Withholding Determination for MRP-228, Rev 4 Project stage: Other ML21019A0072021-02-18018 February 2021 Transmittal Email for Withholding Determination for MRP-228, Rev 4 Project stage: Other ML21049A0682021-02-18018 February 2021 NRC Form 897, Withholding Determination EPRI Presentations for Feb 23 2021 Meeting on MRP 229 Rev 4 Project stage: Meeting ML21007A0092021-03-0101 March 2021 Summary of Meeting Between the U.S. Nuclear Regulatory Commission Staff and the Electric Power Research Institute to Discuss MRP-229, Revision 4 (L-2020-PPM-0002) Project stage: Meeting PMNS20210898, Meeting Between the NRC Staff and Electric Power Research Institute2021-07-0808 July 2021 Meeting Between the NRC Staff and Electric Power Research Institute Project stage: Request ML21224A0062021-08-12012 August 2021 NRC 897, Withholding Determination for EPRI Aug 12 2021 Meeting Slides Project stage: Meeting ML21224A0072021-08-12012 August 2021 Transmittal Email for EPRI Aug 12 2021 Meeting Slides Withholding Determination Project stage: Meeting ML21189A0142021-09-10010 September 2021 Summary of August 12, 2021 MRP232 Rev 2 EPRI Meeting with U. S. Nuclear Regulatory Commission Project stage: Meeting ML21285A0232021-10-12012 October 2021 Meeting Attendees for October 12, 2021, Information Exchange on Materials Reliability Program: Aging Management Strategies for B&W Pressurized Water Reactor Internals (MRP-231, Rev. 4) Project stage: Meeting ML21285A1782021-11-0101 November 2021 NRC Form 897, Withholding Determination for MRP-231, Rev. 4 October 12, 2021, Meeting Slides Project stage: Meeting ML21285A1772021-11-0101 November 2021 Transmittal Email for NRC Form 897, Withholding Determination for MRP-231, Rev. 4 October 12, 2021, Meeting Slides Project stage: Meeting ML21285A0222021-11-0303 November 2021 Summary of October 12, 2021, Meeting Between the U.S. Nuclear Regulatory Commission Staff and the Electric Power Research Institute to Discuss MRP-231 Revision 4 Project stage: Meeting 2021-11-03
[Table View] |
Text
February 11, 2021 MEMORANDUM TO:
Dennis C. Morey, Chief Licensing Processes Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:
Joseph J. Holonich, Senior Project Manager /RA/
Licensing Processes Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF JANUARY 12, 2021, MEETING BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION STAFF AND THE ELECTRIC POWER RESEARCH INSTITUTE TO DISCUSS MRP-230, REVISION 3 (L-2020-PPM-0002)
On January 12, 2021, the U. S. Nuclear Regulatory Commission (NRC) staff met with representatives from the Electric Power Research Institute (EPRI). The purpose of the meeting was to discuss the Materials Reliability Program: Functionality Analysis for Westinghouse and Combustion Engineering Representative PWR [Pressurized Water Reactor] Internals (MRP-230, Revision 3). The information related to the meeting including the meeting attendee list can be found in Agencywide Documents Access and Management System Package Accession No. ML21005A044.
The meeting was bifurcated in two parts. The first part was open to the public. In that part, the EPRI representatives provided a general overview of MRP-230, Revision 3. In the closed portion of the meeting, the EPRI representatives discussed in detail the analyses and results contained in MRP-230, Revision 3. A nonproprietary version of the presentation was not provided and thus is not available for stakeholders. A few questions were asked by the NRC staff to help gain a better understanding of the analyses.
In closing the meeting, the EPRI representatives stated that this meeting along with several other informational meetings on different reports will help provide the NRC staff with a technical base for review MRP-227, Revision 2, Pressurized Water Reactor (PWR) Internals Inspection and Evaluation Guidelines, when it is submitted.
Docket No. 99902021 CONTACT: Joseph Holonich, NRR/DORL 301-415-7297
ML21005A044 (Package)
ML21006A020 (Summary)
- via e-mail OFFICE NRR/DORL/LLPB/PM*
NRR/DORL/LLPB/LA*
NRR/DNLR/NVIB/BC*
NAME JHolonich DHarrison HGonzalez DATE 01/20/2021 01/22/2021 02/11/2021 OFFICE NRR/DORL/LLPB/BC*
NRR/DORL/LLPB/PM*
NAME DMorey JHolonich DATE 02/11/2021 02/11/2021