OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION OFFICIAL USE ONLY - SECURITY RELATED INFORMATION November 24, 2020 Mr. Mike Annacone Vice President, Columbia Fuel Operations and Manager, Columbia Plant Westinghouse Electric Company 5801 Bluff Road Hopkins, SC 29061
SUBJECT:
WESTINGHOUSE ELECTRIC COMPANY - NUCLEAR REGULATORY COMMISSION INSPECTION REPORT NO. 70-1151/2020-401
Dear Mr. Annacone:
The Nuclear Regulatory Commission (NRC) conducted an announced inspection November 16-18, 2020, at the Westinghouse Columbia Fuel Fabrication Facility (CFFF) in Hopkins, SC. The purpose of the inspection was to determine whether activities authorized by the license were conducted safely and in accordance with U.S. Nuclear Regulatory Commission (NRC) requirements. At the conclusion of the inspection on November 18, 2020, the inspector discussed the findings with members of your staff.
Areas examined during the inspection included fixed site and transportation shipment physical protection programs for special nuclear material of low strategic significance, physical protective measures implemented as required by NRC Orders for Interim Compensatory Measures dated June 17, 2002, and your safeguards information protection program. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observation of activities in progress.
The enclosed inspection report contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability.
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION M. Annacone 2
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS),
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Should you have any questions concerning this letter, please contact us at 404-997-4563.
Sincerely,
/RA by Jared Justice Acting for/
James Shehee, Chief Plant Support Branch Division of Reactor Safety Docket No. 70-1151 License No. SNM-1107
Enclosure:
NRC Inspection Report 70-1151/2020-401 w/Supplemental Information cc:
Elise Malek Licensing Manager malekem@westinghouse.com Electronic Mail Distribution Patrick Donnelly Principal Licensing Engineer donnelpb@westinghouse.com Electronic Mail Distribution
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION M. Annacone 3
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
SUBJECT:
WESTINGHOUSE ELECTRIC COMPANY - NUCLEAR REGULATORY COMMISSION INTEGRATED INSPECTION REPORT NO. 70-1151/2020-401 Dated November 24, 2020 DISTRIBUTION:
E. Michel, RII T. Vukovinsky, RII N. Simonian, NSIR/DSO/SOSB Daryl Johnson, NSIR/DSO/SOSB Dante Johnson, NSIR/DSO/SPEB A. Letoumeau, NSIR/DSO/SOSB T. Keene, NSIR/DSO/SOSB A. Richardson, NSIR/DSO/SOSB F. Sullivan, NSIR/DSO/SOSB J. Rubenstone, NMSS PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE ADAMS: Yes ACCESSIONUMBER:ML20329A374 SUNSI REVIEW NON-SENSITIVE FORM 665 ATTACHED OFFICE RII:DRS/PSB RII:DFFI/PB2 RII:DFFI/PB2 RII:DRS/PSB NAME O. Smith T. Vukovinsky E. Michel J. Shehee DATE 11/ 24/2020 11/23/2020 11/ 23 /2020 11/ 24 /2020 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY