ML20311A238

From kanterella
Jump to navigation Jump to search
Acceptance of Requested Licensing Action Relief Request CISI-03-01 Concerning Containment Unbonded Post- Tensioning System Inservice Inspection Requirements
ML20311A238
Person / Time
Issue date: 11/06/2020
From: Marshall M, Rowley J
Licensing Processes Branch
To: Tom Loomis, Mascitelli F
Exelon Generation Co, Exelon Nuclear
Jonathan Rowley, NRR/DORL/LPLI, 301-415-
References
EPID: L-2020-LLR-0135
Download: ML20311A238 (2)


Text

From:

Rowley, Jonathan To:

Loomis, Thomas R:(GenCo-Nuc); Mascitelli, Francis J:(Exelon Nuclear)

Cc:

Marshall, Michael; Danna, James

Subject:

Acceptance of Calvert CliffsCISI-03-01 Relief Request Date:

Friday, November 06, 2020 7:51:00 AM

SUBJECT:

Calvert Cliffs Nuclear Power Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Re: Relief Request CISI-03-01 Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements (EPID: L-2020-LLR-0135)

By letter dated October 6, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20280A508), Exelon Generation Company, LLC submitted a relief request for Calvert Cliffs Nuclear Power Plant, Units 1 and 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Pursuant to Sections 50.55a(z)(1) and 50.55a(z)(2) of Title 10 of the Code of Federal Regulations (10CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 160 hours0.00185 days <br />0.0444 hours <br />2.645503e-4 weeks <br />6.088e-5 months <br /> to complete. The NRC staff expects to complete this review by the end of November 2021. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, and unanticipated addition of scope to the review. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me.

Jonathan Rowley, Project Manager U.S. Nuclear Regulatory Commission (NRC)

Office of Nuclear Reactor Regulation (NRR)

Division of Operating Reactor Licensing (DORL)

Plant Licensing Branch 1 (LPL1)

Phone: 301-415-4053 Email: jonathan.rowley@nrc.gov