ML20308A412
| ML20308A412 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 07/13/2020 |
| From: | Exelon Generation Co |
| To: | Chuck Zoia NRC/RGN-III/DRS/OLB |
| Zoia C | |
| Shared Package | |
| ML19121A250 | List: |
| References | |
| Download: ML20308A412 (1) | |
Text
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:
Dresden Generating Station Date of Examination:
6/8/2020 Exam Level: RO SRO-I SRO-U Operating Test Number:
2020-301 Control Room Systems:* 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title Type Code*
Safety Function
A, D, EN, S 1
- c. 295025 G.2.4.6 3.7/4.7 - GLAND SEAL - Alternate Depressurization using Gland Seal N, E, L, S 3
A, N, E, S 4
- e. 262001.A4.04 3.6/3.7 - AUX POWER - Transfer Aux Power D, P, S 6
A, D, L, S 7
A, D, P,S 8
- h. 261000.A4.02 3.1/3.1 - SBGT - Start Standby Gas Treatment D, EN,S 9
In-Plant Systems:* 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U
- i. 295028.EA1.03 3.9/3.9 - CONTAINMENT - Bypass Drywell Cooler Trip D, E, EN, P 5
A, D, EN, R 8
- k. 239002.A2.03 4.1/4.2 - MAIN STEAM - Take Action for a Failed Relief Valve D, E, R 3
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power/Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6/4-6 /2-3 9/ 8/ 4 1/ 1/ 1 1/ 1/ 1 (control room system) 1/ 1/ 1 2/ 2/ 1 3/ 3/ 2 (randomly selected) 1/ 1/ 1