ML20287A358

From kanterella
Jump to navigation Jump to search

Letter to Licensee, San Onofre Nuclear Generating Station (SONGS) Units 1, 2 and 3, Exemption from Certain Low-Level Waste Shipment Tracking Requirements of 10 CFR Part 20, Appendix G, Section Iii.E
ML20287A358
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 11/13/2020
From: Amy Snyder
Reactor Decommissioning Branch
To: Bates A
Southern California Edison Co
Amy Snyder, NMSS/DUWP
Shared Package
ML20287A353 List:
References
EPID L-2020-LLE-0142
Download: ML20287A358 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 13, 2020 Mr. Albert Bates Manager, Regulatory Affairs Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128

SUBJECT:

SAN ONOFRE NUCLEAR GENERATING STATION, UNIT NOS. 1, 2, AND 3 -

EXEMPTION FROM TITLE 10 OF THE CODE OFFEDERAL REGULATIONS PART 20, APPENDIX G, SECTION III.E (EPID NO. L-2020-LLE-0142)

Dear Mr. Bates:

The U.S. Nuclear Regulatory Commission has granted Southern California Edison (SCE) the enclosed exemption from the requirements of Title 10 of the Code of Federal Regulations Part 20, Appendix G,Section III.E, for investigating, tracing and reporting shipments of low-level radioactive wastes where receipt is not acknowledged by the recipient within 20 days after transfer to the shipper. The exemption extends the receipt acknowledgment period from 20 days to 45 days before SCE will have to investigate, trace and report on the status of a low-level radioactive waste shipment being transported from San Onofre Nuclear Generating Station (SONGS), Unit Nos. 1, 2 and 3 to a licensed low-level radioactive waste processing or land disposal facility.

A copy of the exemption is enclosed and has been forwarded to the Office of the Federal Register for publication. If you have any questions concerning this evaluation, please contact me at (301) 415-6822 or via e-mail at Amy.Snyder@nrc.gov.

Sincerely, Amy M. Snyder Digitally signed by Amy M. Snyder Date: 2020.11.13 12:21:04 -05'00' Amy M. Snyder, Senior Project Manager Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery and Waste Programs Office of Nuclear Material Safety and Safeguards

Enclosure:

Exemption cc: SONGS ListServ

SUBJECT:

SAN ONOFRE NUCLEAR GENERATING STATION, UNIT NOS. 1, 2, AND 3 -

EXEMPTION FROM TITLE 10 OF THE CODE OF FEDERAL REGULATIONS PART 20, APPENDIX G, SECTION III.E (EPID NO. L-2020-LLE-0142)

DATE: NOVEMBER 13, 2020 DISTRIBUTION:

RDB r/f G. Warnick, RIV B. Maier, RIV A. Moreno, OCA RidsRgn4MailCenter Resource RidsNMSSDuwpRDB Resource PUBLIC ADAMS Accession Package ML20287A353 *via e-mail OFFICE DUWP OGC (NLO) DUWP DUWP DUWP NAME ASnyder* SClark* BWatson* PHolahan* ASnyder*

DATE 10/8/20 11/02/20 10/14/20 11/13/20 11/13/20 OFFICIAL RECORD COPY