ML20279A368
| ML20279A368 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 12/02/2020 |
| From: | John Lubinski Office of Nuclear Material Safety and Safeguards |
| To: | Halnon G GPU Nuclear |
| SMITH T/NMSS/DUWP | |
| Shared Package | |
| ML20279A366 | List: |
| References | |
| EA-20-136, EPID L-2019-LLA-0257 | |
| Download: ML20279A368 (4) | |
Text
December 2, 2020 EA-20-136 Mr. Gregory H. Halnon President and Chief Nuclear Officer GPU Nuclear, Inc.
Mail Stop A-G0-18 76 South Main Street Akron, OH 44308
SUBJECT:
THREE MILE ISLAND NUCLEAR STATION, UNIT NO. 2 - ORDER APPROVING TRANSFER OF LICENSE FROM THE FIRSTENERGY COMPANIES TO TMI-2 SOLUTIONS, LLC AND DRAFT CONFORMING ADMINISTRATIVE LICENSE AMENDMENT (EPID L-2019-LLA-0257)
Dear Mr. Halnon:
By application dated November 12, 2019, as supplemented by letters dated December 12, 2019, March 18, 2020, and June 12, 2020; and an e-mail dated September 2, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession Nos.
ML19325C600, ML20013E535, ML20079D788, ML20188A048, and ML20275A326, respectively), GPU Nuclear, Inc., Metropolitan Edison Company, Jersey Central Power and Light Company, and Pennsylvania Electric Company (collectively, the FirstEnergy Companies) and TMI-2 Solutions, LLC (TMI-2 Solutions) (together with the FirstEnergy Companies, the applicants) requested U.S. Nuclear Regulatory Commission (NRC, the Commission) consent to the transfer from the FirstEnergy Companies to TMI-2 Solutions of NRC Possession Only License No. DPR-73 for Three Mile Island Nuclear Station, Unit No. 2 (TMI-2). This request was submitted to the NRC for approval pursuant to Section 184, Inalienability of Licenses, of the Atomic Energy Act of 1954, as amended, and Title 10 of the Code of Federal Regulations (10 CFR) 50.80, Transfer of licenses. The applicants also requested that the NRC approve a conforming administrative license amendment pursuant to 10 CFR 50.90, Application for amendment of license, construction permit, or early site permit.
Notice of the application was published in the Federal Register (FR) on March 26, 2020 (85 FR 17102). The supplemental letters dated December 12, 2019, March 18, 2020, and June 12, 2020; and e-mail dated September 2, 2020, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the NRC staffs no significant hazards consideration determination.
The NRC staff has completed its review of the application. The Order in Enclosure 1 approves the proposed transfer, subject to the condition described therein. The Order also approves the draft conforming administrative license amendment in Enclosure 2, which will be issued and made effective at the time the transfer actions are completed. Enclosure 3 is the NRC staffs safety evaluation related to the application.
The Order has been forwarded to the Office of the Federal Register for publication.
In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs ADAMS. The ADAMS is accessible from the NRC Web site at https://www.nrc.gov/reading-rm/adams.html.
Should you have any questions regarding this action, please contact Theodore Smith at 301-415-6721 or via e-mail at Theodore.Smith@nrc.gov.
Sincerely, John W. Lubinski, Director Office of Nuclear Material Safety and Safeguards Docket No.: 50-320
Enclosures:
- 1. Order
- 2. Draft Conforming Amendment to DPR-73
- 3. Safety Evaluation cc w/enclosures: TMI-2 listserv John W.
Lubinski Digitally signed by John W. Lubinski Date: 2020.12.02 12:49:50 -05'00'
Mr. John Sauger President and Chief Nuclear Officer TMI-2 Solutions, LLC 121 West Trade Street, Suite 2700 Charlotte, NC 28202 Mr. Russell G. Workman General Counsel and Secretary TMI-2 Solutions, LLC 423 West 300 South, Suite 200 Salt Lake City, UT 841901 Mr. Daniel F. Stenger Hogan Lovells US LLP 555 13th St NW Washington, DC 20004 Mr. Gerry van Noordennen Senior Vice President and Regulatory Affairs Manager EnergySolutions LLC 121 West Trade Street, Suite 2700 Charlotte, NC 28202 Ms. Karen A. Sealy Senior Corporate Counsel FirstEnergy Service Company 76 South Main Street Akron, OH 44308 Mr. Timothy P. Matthews Morgan, Lewis & Bockius, LLP 1111 Pennsylvania A venue, NW Washington, DC 20004
Package ML20279A366
- via Email