Category:DRAWINGS
MONTHYEARML20263Q6241984-04-0202 April 1984 Diesel Generator Typical Utility Interconnection Plan Above El 634 Ft 6 Inches ML20263M2701984-02-15015 February 1984 Marked-up Hanger Isometric:Main Steam Turbine Steam Aux & Turbine Bldgs Unit 2 Sys A. Sheet 2.Rev Date Illegible ML20263M2691984-02-15015 February 1984 Marked-up Hanger Isometric:Main Steam & Turbine Steam Aux & Turbine Bldgs Unit 1 System B. Sheet 3.Rev Date Illegible ML20263M4431984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plans at El 674 Ft & El 685 Ft ML20263M5231984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Interior Wall Elevs. Sheet 5 ML20263M5261984-02-0707 February 1984 Auxiliary Building:Crack Survey Wall Elevations. Sheet 6 ML20263M5291984-02-0707 February 1984 Auxiliary Building:Crack Survey Wall Elev at 5.3 & K (E of 7.8) ML20263M5211984-02-0707 February 1984 Auxiliary Building:Crack Survey Interior Wall Elevs. Sheet 4 ML20263M5181984-02-0707 February 1984 Auxiliary Building:Crack Survey Interior Wall Elevs. Sheet 3 ML20263M5151984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Interior Wall Elevs. Sheet 2 ML20263M5131984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Interior Wall Elevs. Sheet 1 ML20263M5101984-02-0707 February 1984 Auxiliary Building:Crack Survey Wall Elevs at Col 8.7 & C ML20263M5551984-02-0707 February 1984 Auxiliary Building:Crack Survey Wall Elevs 7.8 & K (E of 7.8) ML20263M5591984-02-0707 February 1984 Auxiliary Building:Crack Survey W Wing Plans & El 614 Ft - El 708 Ft 6 Inches ML20263M5611984-02-0707 February 1984 Auxiliary Building:Crack Survey E Wing Plans & El 614 Ft - El 708 Ft 6 Inches ML20263M5681984-02-0707 February 1984 Auxiliary Building:Crack Survey Elevs at Col Aa ML20263M5691984-02-0707 February 1984 Auxiliary Building:Crack Survey Control Tower Walls Elevs ML20263M5711984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Railroad Bay Plans ML20263M5731984-02-0707 February 1984 Auxiliary Building:Crack Survey Plan at El 624 Ft & Miscl Walls ML20263M5741984-02-0707 February 1984 Auxiliary Building:Crack Survey Wall Elevs at Col a & B & Misc Walls ML20263M5091984-02-0707 February 1984 Auxiliary Building:Crack Survey Wall Elev at Col 7.4 ML20263M5061984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Wall Elev at Col 5.6 ML20263M5031984-02-0707 February 1984 Auxiliary Building:Crack Survey Wall Elevs at Col 5.1,7.9 & Hk ML20263M5001984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Wall Elev at Col Line a ML20263M4551984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Wall Elev at Col Line B ML20263M4531984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Wall Elevs at Col D & 4.55 ML20263M4511984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Wall Elevs at Col G & F ML20263M4481984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Wall Elevs at Col H ML20263M4461984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Wall Elevs at Col Kc ML20263M4401984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plan at El 659 Ft ML20263M4371984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plan at El 646 Ft ML20263M4351984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plan at El 634 Ft 6 Inches ML20263M4321984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plan at El 614 Ft ML20263M4291984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plan at El 599 Ft ML20263M4271984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plan at El 584 Ft ML20263M4241984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plan at El 568 Ft ML20263K7261984-01-30030 January 1984 Diesel Generator Typical Utility Interconnection Plan Above El 634 Ft 6 Inches ML20263M2771984-01-13013 January 1984 Unit 2 Turbine Roll Integrated Schedule ML20263M2731983-09-13013 September 1983 Marked-up Hanger Isometric:Main Steam Turbine Steam Aux Turbine Bldgs Unit 2 Sys B. Sheet 3 ML20263M2491983-08-25025 August 1983 Marked-up Piping and Instrument Diagram:Service Water Cooling Tower and Pump Structure Unit 1 & 2 ML20263M2541983-08-25025 August 1983 Marked-up Piping and Instrument Diagram:Service Water Cooling Tower and Pump Structure Unit 1 & 2 ML20261A6001983-07-25025 July 1983 Settlement Vs Time:Reactor Buildings. No Rev Date ML20263M2581983-07-14014 July 1983 Marked-up Hanger Isometric:High Pressure Steam to Evaporator Building. Sheet 1 ML20259D0491983-06-28028 June 1983 Dewatering Events ML20263B7941983-06-24024 June 1983 Hanger Isometric:Decay Heat Removal and Core Flooding System Unit 2 (Reactor Bldg Headers). Sheet 1 ML20259C6921983-06-0707 June 1983 Geologic Cross Section B-B and C-C Service Water Pump Structure ML20259C6871983-06-0606 June 1983 Geologic Cross Sections A-A and D-D Service Water Pump Structure ML20259C6821983-06-0606 June 1983 Geologic Cross Section Location Plan Service Water Pump Structure ML20263M2611983-02-15015 February 1983 Marked-up Hanger Isometric:Main Steam and Turbine Steam Aux & Turbine Unit 1 System A. Sheet 2 ML20263J1161983-01-13013 January 1983 Hanger Isometric:Aux Bldg Safety Related Chilled Water System Train B. Sheet 45.Rev Date Illegible 1984-04-02
[Table view] |