ML20263H968
From kanterella
Jump to navigation
Jump to search
ML20263H968 | |
Person / Time | |
---|---|
Site: | Midland |
Issue date: | 07/15/1982 |
From: | BECHTEL GROUP, INC. |
To: | CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
Shared Package | |
ML19304A216 | List:
|
References | |
CON-7220 H-619(Q), NUDOCS 8302150300 | |
Download: ML20263H968 (1) | |
Similar Documents at Midland | |
---|---|
Category:DRAWINGS
MONTHYEARML20263Q6241984-04-0202 April 1984
[Table view]Diesel Generator Typical Utility Interconnection Plan Above El 634 Ft 6 Inches ML20263N5331984-03-0101 March 1984 Service Water Pump Structucrack Survey Interior Wall Elevations ML20263N5381984-03-0101 March 1984 Service Water Pump Structucrack Survey Misc Plans & Misc Walls ML20263N5251984-03-0101 March 1984 Service Water Pump Structucrack Survey Plans at Elev 656 Ft ML20263N5221984-03-0101 March 1984 Service Water Pump Structucrack Survey Plans at Els 592 Ft,620 Ft & 634 Ft 6 Inches ML20263N5281984-03-0101 March 1984 Service Water Pump Structucrack Survey Exterior Walls North & South and Miscellaneous Columns ML20263N5301984-03-0101 March 1984 Service Water Pump Structucrack Survey Exterior Walls East & West ML20263N5361984-03-0101 March 1984 Service Water Pump Structucrack Survey Misc Wall Elevations ML20263M2691984-02-15015 February 1984 Marked-up Hanger Isometric:Main Steam & Turbine Steam Aux & Turbine Bldgs Unit 1 System B. Sheet 3.Rev Date Illegible ML20263M2701984-02-15015 February 1984 Marked-up Hanger Isometric:Main Steam Turbine Steam Aux & Turbine Bldgs Unit 2 Sys A. Sheet 2.Rev Date Illegible ML20263M5681984-02-0707 February 1984 Auxiliary Building:Crack Survey Elevs at Col Aa ML20263M4401984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plan at El 659 Ft ML20263M4511984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Wall Elevs at Col G & F ML20263M5261984-02-0707 February 1984 Auxiliary Building:Crack Survey Wall Elevations. Sheet 6 ML20263M5211984-02-0707 February 1984 Auxiliary Building:Crack Survey Interior Wall Elevs. Sheet 4 ML20263M5181984-02-0707 February 1984 Auxiliary Building:Crack Survey Interior Wall Elevs. Sheet 3 ML20263M4271984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plan at El 584 Ft ML20263M4241984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plan at El 568 Ft ML20263M4431984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plans at El 674 Ft & El 685 Ft ML20263M4291984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plan at El 599 Ft ML20263M5001984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Wall Elev at Col Line a ML20263M5231984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Interior Wall Elevs. Sheet 5 ML20263M5291984-02-0707 February 1984 Auxiliary Building:Crack Survey Wall Elev at 5.3 & K (E of 7.8) ML20263M4461984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Wall Elevs at Col Kc ML20263M4481984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Wall Elevs at Col H ML20263M5061984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Wall Elev at Col 5.6 ML20263M4531984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Wall Elevs at Col D & 4.55 ML20263M5101984-02-0707 February 1984 Auxiliary Building:Crack Survey Wall Elevs at Col 8.7 & C ML20263M5611984-02-0707 February 1984 Auxiliary Building:Crack Survey E Wing Plans & El 614 Ft - El 708 Ft 6 Inches ML20263M5741984-02-0707 February 1984 Auxiliary Building:Crack Survey Wall Elevs at Col a & B & Misc Walls ML20263M5091984-02-0707 February 1984 Auxiliary Building:Crack Survey Wall Elev at Col 7.4 ML20263M4351984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plan at El 634 Ft 6 Inches ML20263M5151984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Interior Wall Elevs. Sheet 2 ML20263M5131984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Interior Wall Elevs. Sheet 1 ML20263M5731984-02-0707 February 1984 Auxiliary Building:Crack Survey Plan at El 624 Ft & Miscl Walls ML20263M5711984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Railroad Bay Plans ML20263M5691984-02-0707 February 1984 Auxiliary Building:Crack Survey Control Tower Walls Elevs ML20263M5031984-02-0707 February 1984 Auxiliary Building:Crack Survey Wall Elevs at Col 5.1,7.9 & Hk ML20263M4551984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Wall Elev at Col Line B ML20263M4371984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plan at El 646 Ft ML20263M4321984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plan at El 614 Ft ML20263M5551984-02-0707 February 1984 Auxiliary Building:Crack Survey Wall Elevs 7.8 & K (E of 7.8) ML20263M5591984-02-0707 February 1984 Auxiliary Building:Crack Survey W Wing Plans & El 614 Ft - El 708 Ft 6 Inches ML20263K7261984-01-30030 January 1984 Diesel Generator Typical Utility Interconnection Plan Above El 634 Ft 6 Inches ML20263M2771984-01-13013 January 1984 Unit 2 Turbine Roll Integrated Schedule ML20263G8551983-11-21021 November 1983 Instrument Location Drawing Area 3 Plan of El 634 Ft 6 Inches. Rev Date Illegible ML20263G5951983-11-21021 November 1983 Instrument Rack Unit 2C31 Post Acc Monitor Panel Insert. Sheet 3.Rev Date Illegible ML20263G6651983-11-21021 November 1983 Instrument Location Drawing Reactor Building Unit 1 Plan of El 640 Ft. Rev Date Illegible ML20263G8591983-11-21021 November 1983 Instrument Location Drawing Area 3 Plan of Elev 646 Ft. Rev Date Illegible ML20263H9141983-11-21021 November 1983 Facing Sheet:Schematic Diagram Plant Water Storage & Transfer System. Rev Date Illegible 1984-04-02 Category:DRAWINGS-PIPING & INSTRUMENTATION DIAGRAMS-APPLICANT'S MONTHYEARML20263Q6241984-04-0202 April 1984
[Table view]Diesel Generator Typical Utility Interconnection Plan Above El 634 Ft 6 Inches ML20263M2701984-02-15015 February 1984 Marked-up Hanger Isometric:Main Steam Turbine Steam Aux & Turbine Bldgs Unit 2 Sys A. Sheet 2.Rev Date Illegible ML20263M2691984-02-15015 February 1984 Marked-up Hanger Isometric:Main Steam & Turbine Steam Aux & Turbine Bldgs Unit 1 System B. Sheet 3.Rev Date Illegible ML20263K7261984-01-30030 January 1984 Diesel Generator Typical Utility Interconnection Plan Above El 634 Ft 6 Inches ML20263D4041983-11-21021 November 1983 Hanger Isometric:Auxiliary Feedwater Suction System Units 1 & 2. Sheet 4.Rev Date Illegible ML20263E0051983-11-21021 November 1983 Hanger Isometric:Make-up and Purification System Unit 2. Sheet 17.Rev Date Illegible ML20263D6301983-11-21021 November 1983 Hanger Isometric:Make-up and Purification System Unit 1 (Reactor Bldg Primary Coolant Letdown Line). Sheet 3. Rev Date Illegible ML20263E0421983-11-21021 November 1983 Hanger Isometric:Decay Heat Removal Discharge System a Engineered Safeguards Room Unit 1. Sheet 4.Rev Date Illegible ML20263D7131983-11-21021 November 1983 Hanger Isometric:Make-up and Purification System Unit 2 (Reactor Bldg Primary Coolant Letdown Line). Sheet 3.Rev Date Illegible ML20263D3631983-11-21021 November 1983 Hanger Isometric:Main Steam and Turbine Steam System Unit 2 (Reactor Bldg Main Steam Header). Sheet 1.Rev Date Illegible ML20263E1101983-11-21021 November 1983 Hanger Isometric:Decay Heat Removal Discharge System B Unit 2. Sheet 6.Rev Date Illegible ML20263D2791983-11-21021 November 1983 Piping and Instrument Diagram:Heating - Ventilation and Air Conditioning - Control Room - Battery Room-Switchgear and Cable Spreading Room. Sheet 2.Rev Date Illegible ML20263D3181983-11-21021 November 1983 Hanger Isometric:Service Water Return System B Unit 1 & 2. Sheet 7.Rev Date Illegible ML20263D1621983-11-21021 November 1983 Piping & Instrument Diagram:Evaporator Process Steam to Dow. Sheet 4A.Rev Date Illegible ML20263E1221983-11-21021 November 1983 Hanger Isometric:Decay Heat Removal Suction & Discharge in Pipeway System a & B Unit 2. Sheet 7.Rev Date Illegible ML20263D6791983-11-21021 November 1983 Hanger Isometric:Make-up and Purification System Unit 1. Sheet 13.Rev Date Illegible ML20263D3151983-11-21021 November 1983 Hanger Isometric:Service Water Supply System B Units 1 & 2. Sheet 6.Rev Date Illegible ML20263D7171983-11-21021 November 1983 Hanger Isometric:Make-up and Purification System Unit 2 (Rc Pump Seal Return Line Reactor Bldg Header. Sheet 4.Rev Date Illegible ML20263D2881983-11-21021 November 1983 Hanger Isometric:Service Water System Reactor and Aux Bldgs Unit 2 (Reactor Bldg System a Supply Headers). Rev Date Illegible ML20263D6381983-11-21021 November 1983 Hanger Isometric:Make-up and Purification System Unit 1 (Rc Pump Seal). Sheet 4.Rev Date Illegible ML20263E0591983-11-21021 November 1983 Hanger Isometric:Decay Heat Removal Suction & Discharge in Pipeway - System a & B - Unit 1. Sheet 7.Rev Date Illegible ML20263D6661983-11-21021 November 1983 Hanger Isometric:Make-up & Purification System Discharge System Unit 1. Sheet 9.Rev Date Illegible ML20263E1571983-11-21021 November 1983 Hanger Isometric:Reactor Bldg Spray System Unit 1 (Reactor Bldg Headers). Sheet 2.Rev Date Illegible ML20263D3661983-11-21021 November 1983 Hanger Isometric:Main Steam Turbine Steam Aux Turbine Bldgs Unit-2 Sys A. Sheet 2.Rev Date Illegible ML20263E0791983-11-21021 November 1983 Hanger Isometric:Decay Heat Removal and Core Flooding System Unit 2 (Reactor Bldg Decay Heat Return Header). Sheet 2.Rev Date Illegible ML20263D2771983-11-21021 November 1983 Hanger Isometric:Service Water System Pump Structure Header. Sheet 1.Rev Date Illegible ML20263D4071983-11-21021 November 1983 Hanger Isometric:Auxiliary Feedwater Discharge System Unit 2. Sheet 5.Rev Date Illegible ML20263D6761983-11-21021 November 1983 Hanger Isometric:Make-up and Purification System Unit 1. Sheet 12.Rev Date Illegible ML20263E0521983-11-21021 November 1983 Hanger Isometric:Decay Heat Removal Discharge System B Unit 1. Sheet 6.Rev Date Illegible ML20263D3051983-11-21021 November 1983 Hanger Isometric:Service Water Supply - System a Unit 1 & 2. Sheet 4.Rev Date Illegible ML20263D2001983-11-21021 November 1983 Hanger Isometric:Component Cooling Water Supply System B Unit 1. Sheet 8.Rev Date Illegible ML20263D2911983-11-21021 November 1983 Piping and Instrument Diagram:Heating Ventilation & Air Conditiong Access Control & Computer Area. Rev Date Illegible ML20263D0951983-11-21021 November 1983 Piping and Instrument Diagram:Chilled Water Safeguards Equipment Unit 1. Sheet 2B.Rev Date Illegible ML20263D2591983-11-21021 November 1983 Piping and Instrument Diagram:Miscellaneous Gas Supply Hydrogen Supply System. Sheet 1A.Rev Date Illegible ML20263D5141983-11-21021 November 1983 Piping and Instrumentation Diagram:Heating,Ventilating & Air Conditioning Miscellaneous Structures. Sheet 5.Rev Date Illegible ML20263D7041983-11-21021 November 1983 Hanger Isometric:Make-up and Purification System Unit 1. Sheet 18.Rev Date Illegible ML20263D1591983-11-21021 November 1983 Piping and Instrument Diagram:Evaporator Process Steam to Dow. Sheet 3B.Rev Date Illegible ML20263E0891983-11-21021 November 1983 Hanger Isometric:Decay Heat Removal Discharge System a Unit 2. Sheet 4.Rev Date Illegible ML20263D3891983-11-21021 November 1983 Hanger Isometric:Auxiliary Feedwater Discharge System Unit 1. Sheet 6.Rev Date Illegible ML20263E2371983-11-21021 November 1983 Hanger Drawing:Reactor Bldg Spray System Unit 2 (Reactor Bldg Headers - Plan & Sections). Sheet 1.Rev Date Illegible ML20263D0801983-11-21021 November 1983 Piping & Instrument Diagram:Plant Heating Auxiliary & Reactor Buildings. Sheet 2B.Rev Date Illegible ML20263D9741983-11-21021 November 1983 Hanger Isometric:Make-up and Purification System Unit 2. Sheet 12.Rev Date Illegible ML20263D3761983-11-21021 November 1983 Hanger Isometric:Auxiliary Steam & Turbine Exhaust Unit 1. Sheet 2.Rev Date Illegible ML20263D2561983-11-21021 November 1983 Piping and Instrument Diagram:Heating,Ventilation & Air Conditioning,Reactor Building Unit 2.Rev Date Illegible ML20263D2031983-11-21021 November 1983 Hanger Isometric:Component Cooling Water Return System B Unit 1. Sheet 9.Rev Date Illegible ML20263E0111983-11-21021 November 1983 Stress Isometric:Decay Heat Removal Core Flooding System Unit 1 (Reactor Bldg Decay Heat Return Header). Sheet 2. Rev Date Illegible ML20263D1481983-11-21021 November 1983 Piping & Instrument Diagram:Evaporator Process Steam to Dow. Sheet 2A.Rev Date Illegible ML20263D6251983-11-21021 November 1983 Hanger Isometric:Make-up and Purification System Unit 1 (Reactor Bldg HP Injection). Sheet 2.Rev Date Illegible ML20263D5591983-11-21021 November 1983 Piping & Instrument Diagram:Miscellaneous Instrumentation Reactor Building Unit 2. Sheet 2.Rev Date Illegible ML20263D6181983-11-21021 November 1983 Piping and Instrumentation Diagram:Plant Radiation Monitoring System Liquid Monitors. Sheet 6.Rev Date Illegible 1984-04-02 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20263H968&oldid=3128929"