Person / Time | |
---|---|
Site: | Perry |
Issue date: | 10/18/1979 |
From: | GILBERT/COMMONWEALTH, INC. (FORMERLY GILBERT ASSOCIAT |
To: | CLEVELAND ELECTRIC ILLUMINATING CO. |
Shared Package | |
ML17320B121 | List:
|
References | |
CON-044549-000, CON-44549, RTR-NUREG-0737, RTR-NUREG-737 D-352-105, NUDOCS 8103180229 | |
Download: ML20261D389 (1) | |
Similar Documents at Perry | |
---|---|
Category:DRAWINGS
MONTHYEARML20262E8281993-12-0606 December 1993
[Table view]Shroud and Top Guide Data.Sheet 1 of 2 ML20262E8321993-12-0606 December 1993 Shroud and Top Guide Data.Sheet 2 of 2 ML20261E4961991-11-11011 November 1991 Civil Site STORM Drainage Plan - South Half.Drawing Not Dtd ML20261E5011991-11-11011 November 1991 Civil Site STORM Drainage Plan - North Half.Drawing Not Dtd ML20261J2101986-05-30030 May 1986 Plant Industrial Waste Transformer Basins Plan & Details ML20261B6231985-11-11011 November 1985 Civil Location Plan ML20265A6291985-10-31031 October 1985 Piping System Diagram:E12 Residual Heat Removal System ML20265A6241985-10-31031 October 1985 Piping System Diagram:E12 Residual Heat Removal System ML20262G0101985-09-18018 September 1985 Electrical Lighting Layout Control Complex - East & West - El 654 Ft 6 Inches, as-built ML20262G0151985-09-18018 September 1985 Electrical Lighting Layout Control Complex - Luminous Ceiling - El 654 Ft 6 Inches, as-built ML20262E1781985-07-22022 July 1985 Piping System Diagram:B31 Leak Detection System. No Rev Date ML20261G2621985-05-0909 May 1985 Electrical One Line Diagram:Class 1E DC System, as-built. Rev Date Illegible ML20262E2861985-04-18018 April 1985 Electrical Elementary Diagram:Leak Detection System Sensitive Sump Monitor. Sheet A15 ML20262E2811985-04-18018 April 1985 Electrical Elementary Diagram:Leak Detection System Leakage Flow Monitors. Sheet A08 ML20262E2521985-04-10010 April 1985 Electrical Elementary Diagram:Containment Atmosphere Monitoring Drywell Train a Temperature Process Instrumentation. Sheet 212 ML20262E2671985-04-10010 April 1985 Electrical Elementary Diagram:Containment Atmosphere Monitoring Drywell Train a Temperature Process Instrumentation. Sheet 210 ML20262E2571985-04-10010 April 1985 Electrical Elementary Diagram:Containment Atmosphere Monitoring Drywell Train B Temperature Process Instrumentation. Sheet 213 ML20262E2721985-04-10010 April 1985 Electrical Elementary Diagram:Containment Atmosphere Monitoring Drywell Train B Pressure Process Instrumentation. Sheet 205 ML20262E2621985-04-10010 April 1985 Electrical Elementary Diagram:Containment Atmosphere Monitoring Drywell Train B Temperature Process Instrumentation. Sheet 211 ML20262E2761985-04-10010 April 1985 Electrical Elementary Diagram:Containment Atmosphere Monitoring Drywell Train a Pressure Process Instrumentation. Sheet 204 ML20262E2481985-02-27027 February 1985 Electrical Elementary Diagram:Plant Radiation Monitoring System Drywell - Gas. Sheet 211 ML20261G2711984-12-0606 December 1984 Electrical-Elementary Diagram:Control Room Annunciator Division 3 Diesel DC System Trouble, as-built.Sheet 283 ML20261G2661984-12-0606 December 1984 Electrical-Elementary Diagram:Control Room Annunciator ECCS Benchboard (1H13-P601) Section 16A. Sheet 282 ML20261G2501984-12-0303 December 1984 Electrical-Elementary Diagram:Metal Clad Switchgear 15 & 15 Kv 4.16 Kv Bus EH13 Diesel Brkr EH1301. Sheet 37 ML20261M8331984-09-24024 September 1984 Recirculation Elbow (Welded) Cal Block PY-22-XX2-5S-F ML20261G2541984-09-24024 September 1984 Electrical-Elementary Diagram:Dc Systems Metering & Relaying Bus ED-1-A, as-built.Sheet 14 ML20262E1801984-09-21021 September 1984 Piping System Diagram:D23 Containment Atmosphere Monitoring System ML20261G2581984-09-21021 September 1984 Electrical-Elementary Diagram:Dc Systems Metering & Relaying Bus ED-1-B, as-built.Sheet 15 ML20261M8301984-07-31031 July 1984 Reactor Recirculation Cal Blocks (Welded) ML20265A6071984-07-27027 July 1984 Piping System E12 Residual Heat Removal - Auxiliary Building Sections ML20265A6191984-07-27027 July 1984 Piping System E12 Residual Heat Removal - Auxiliary Building Plan El 568 Ft 4 Inches and 574 Ft 10 Inches (West) ML20265A6141984-07-27027 July 1984 Piping System E12 Residual Heat Removal - Auxiliary Building El 599 Ft - Plans & Sections ML20262E2251984-06-0404 June 1984 I&C Location Layout Auxiliary Building Above Elevation 620 Ft 6 Inches West ML20262E1701984-05-17017 May 1984 Piping System B21,B31 Leak Detection System and Reactor Head Vent Drain Reactor Building - Sections ML20261G4701984-05-0404 May 1984 Mechanical Details:Pool Swell Deflector Assembly for Valves ML20263P0221984-04-0909 April 1984 Piping System Diagram E21 Low Pressure Core Spray System. Rev Date Illegible ML20262E2161984-04-0606 April 1984 Location Layout Reactor Building Above Elevation 642 Ft West ML20262E3051984-02-27027 February 1984 I&C Instrument Diagram:Drywell Atmosphere Radiation Monitor D17-K670 H51-PC71 ML20262C2191984-02-24024 February 1984 Piping System E12 Residual Heat Removal System Reactor Bldg Plan El 539 Ft-9 Inches and 574 Ft-10 Inches - East ML20262C2151984-02-24024 February 1984 Piping System E12,Residual Heat Removal System Reactor Building - Plan El 590 Ft 9 Inches and El 574 Ft 10 Inches West ML20262E2911984-02-15015 February 1984 I&C Instrument Diagram:Drywell Area Equipment Drain Sump Level Leak Detection ML20262E2381984-02-0808 February 1984 I&C System D17 Plant Radiation Monitoring K670,K700,K760 ML20262E1931984-02-0707 February 1984 I&C Location Layout Reactor Building Above Elevation 574 Ft 10 Inches East ML20262E1841984-01-13013 January 1984 Instrument Diagram:Containment Atmosphere Monitoring and Vacuum Relief Systems B Loop ML20262E2291984-01-0505 January 1984 I&C Location Layout Intermediate Building Above Elevation 654 Ft 6 Inches North ML20263G9281984-01-0505 January 1984 Final Plant Layout Plan Above Elev 721 Ft Reactor Building. Rev Date Illegible ML20262E2071984-01-0505 January 1984 I&C Location Layout Reactor Building Above Elevation 620 Ft 6 Inches East ML20263G9321984-01-0505 January 1984 Final Plant Layout Section a Unit 1 Auxiliary Building Reactor Building & Fuel Handling Area. Rev Date Illegible ML20263G9251984-01-0505 January 1984 Final Plant Layout Plan Above Elev 639 Ft 6 Inches Reactor Building Refueling Floor. Rev Date Illegible ML20263G9171984-01-0505 January 1984 Final Plant Layout Plan Above El 642 Ft Reactor Bldg - Aux Bldg Roof & El 642 Ft 6 Inches Turbine Power Complex. Rev Date Illegible 1993-12-06 Category:DRAWINGS-PIPING & INSTRUMENTATION DIAGRAMS-APPLICANT'S MONTHYEARML20265A6241985-10-31031 October 1985
[Table view]Piping System Diagram:E12 Residual Heat Removal System ML20265A6291985-10-31031 October 1985 Piping System Diagram:E12 Residual Heat Removal System ML20262E1781985-07-22022 July 1985 Piping System Diagram:B31 Leak Detection System. No Rev Date ML20262E1801984-09-21021 September 1984 Piping System Diagram:D23 Containment Atmosphere Monitoring System ML20265A6191984-07-27027 July 1984 Piping System E12 Residual Heat Removal - Auxiliary Building Plan El 568 Ft 4 Inches and 574 Ft 10 Inches (West) ML20265A6141984-07-27027 July 1984 Piping System E12 Residual Heat Removal - Auxiliary Building El 599 Ft - Plans & Sections ML20265A6071984-07-27027 July 1984 Piping System E12 Residual Heat Removal - Auxiliary Building Sections ML20262E1701984-05-17017 May 1984 Piping System B21,B31 Leak Detection System and Reactor Head Vent Drain Reactor Building - Sections ML20263P0221984-04-0909 April 1984 Piping System Diagram E21 Low Pressure Core Spray System. Rev Date Illegible ML20262C2151984-02-24024 February 1984 Piping System E12,Residual Heat Removal System Reactor Building - Plan El 590 Ft 9 Inches and El 574 Ft 10 Inches West ML20262C2191984-02-24024 February 1984 Piping System E12 Residual Heat Removal System Reactor Bldg Plan El 539 Ft-9 Inches and 574 Ft-10 Inches - East ML20262E1841984-01-13013 January 1984 Instrument Diagram:Containment Atmosphere Monitoring and Vacuum Relief Systems B Loop ML20263P0291983-10-28028 October 1983 Piping System Diagram C41 Standby Liquid Control System ML20262L2401983-09-16016 September 1983 Piping System Diagram P87 Post Accident Sampling System. Rev Date Illegible ML20263P0161983-08-24024 August 1983 Piping System Diagram E22 High Pressure Core Spray System ML20263P0351983-08-24024 August 1983 Piping System Diagram E12 Residual Heat Removal System ML20261J6441983-08-23023 August 1983 Piping System E12 Residual Heat Removal System Reactor Bldg Plan El 620 Ft 6 Inches (West). Rev Date Illegible ML20261J6521983-07-26026 July 1983 Piping System E12 Analysis Diagram Low Pressure Coolant Injection Loop C to Reactor ML20261J6491983-07-26026 July 1983 Piping System E12 Analysis Diagram Low Pressure Coolant Injection Loop C to Reactor ML20262E1741983-04-20020 April 1983 Instrument Diagram:Containment Atmosphere Monitoring and Vacuum Relief Systems a Loop ML20262L2371982-10-11011 October 1982 Piping System Diagram P87 Post Accident Sampling System ML20260C7201981-10-0101 October 1981 Main Steam Safety Relief Valve (F041G) Disch to Suppl Pool. Sheet 30 ML20261D4221981-03-13013 March 1981 Piping System Diagram N25 High Pressure Heater Drains and Vents a ML20261D4271981-03-13013 March 1981 Piping System Diagram N25 High Pressure Heater Drains and Vents B ML20261D5211981-01-27027 January 1981 Piping System Diagram R45 HPCS Diesel Generator Fuel Oil System ML20261D5081981-01-0909 January 1981 Piping System Diagram R47 Standby Diesel Generator Lube Oil ML20261D5131981-01-0909 January 1981 Piping System Diagram R46 Standby Diesel Generator Jacket Water ML20261D4961980-12-0202 December 1980 Piping System Diagram P51,P52 Service and Instrument Air Supply ML20261D5171980-12-0202 December 1980 Piping System Diagram R48 Standby Diesel Generator Exhaust, Intake and Crankcase ML20262E1891980-11-20020 November 1980 Piping System Diagram:B31 Leak Detection System ML20263P0391980-11-18018 November 1980 Piping System Diagram E51 Reactor Core Isolation Cooling System ML20261D5391980-11-17017 November 1980 Piping System Diagram G41 Fuel Pool Cooling and Clean-Up System ML20261D5471980-10-0909 October 1980 Piping System Diagram P45 Emergency Service Water System ML20261D5431980-10-0909 October 1980 Piping System Diagram P45 Emergency Service Water System ML20261D5521980-10-0808 October 1980 Piping System Diagram M51 Combustible Gas Control System ML20261D5561980-05-0808 May 1980 System Diagram Containment & Drywell Isolation ML20261D3101980-05-0808 May 1980 System Diagram Containment & Drywell Isolation ML20261D3221980-05-0808 May 1980 System Diagram Containment & Drywell Isolation ML20261D3151980-05-0808 May 1980 System Diagram Containment & Drywell Isolation ML20261D3551980-02-0606 February 1980 Piping System Diagram N27 Feedwater ML20261D3601980-02-0606 February 1980 Piping System Diagram N27 Feedwater ML20261D5341979-11-20020 November 1979 Piping System Diagram P42 Emergency Closed Cooling System ML20261M8001979-10-27027 October 1979 P&ID - Nuclear Boiler Sys. Sheet 2 ML20261D3971979-10-18018 October 1979 Piping System Diagram N23 Condensate Filtration System ML20261D3891979-10-18018 October 1979 Piping System Diagram N23 Condensate Filtration System ML20261D3851979-10-18018 October 1979 Piping System Diagram N23 Condensate Filtration System ML20261D4791979-10-12012 October 1979 Piping System Diagram P33 Turbine Plant Sampling System ML20261D4071979-10-12012 October 1979 Piping System Diagram N24 Condensate Demineralizer System ML20261D4141979-10-12012 October 1979 Piping System Diagram N24 Condensate Demineralizer System ML20261D4191979-10-12012 October 1979 Piping System Diagram N24 Condensate Demineralizer System 1985-07-22 |