Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20262E828 | 6 December 1993 | Shroud and Top Guide Data.Sheet 1 of 2 | |
ML20262E832 | 6 December 1993 | Shroud and Top Guide Data.Sheet 2 of 2 | |
ML20261E496 | 11 November 1991 | Civil Site STORM Drainage Plan - South Half.Drawing Not Dtd | |
ML20261E501 | 11 November 1991 | Civil Site STORM Drainage Plan - North Half.Drawing Not Dtd | |
ML20261J210 | 30 May 1986 | Plant Industrial Waste Transformer Basins Plan & Details | |
ML20261B623 | 11 November 1985 | Civil Location Plan | |
ML20265A629 | 31 October 1985 | Piping System Diagram:E12 Residual Heat Removal System | |
ML20265A624 | 31 October 1985 | Piping System Diagram:E12 Residual Heat Removal System | |
ML20262G010 | 18 September 1985 | Electrical Lighting Layout Control Complex - East & West - El 654 Ft 6 Inches, as-built | |
ML20262G015 | 18 September 1985 | Electrical Lighting Layout Control Complex - Luminous Ceiling - El 654 Ft 6 Inches, as-built | |
ML20262E178 | 22 July 1985 | Piping System Diagram:B31 Leak Detection System. No Rev Date | |
ML20261G262 | 9 May 1985 | Electrical One Line Diagram:Class 1E DC System, as-built. Rev Date Illegible | |
ML20262E286 | 18 April 1985 | Electrical Elementary Diagram:Leak Detection System Sensitive Sump Monitor. Sheet A15 | |
ML20262E281 | 18 April 1985 | Electrical Elementary Diagram:Leak Detection System Leakage Flow Monitors. Sheet A08 | |
ML20262E252 | 10 April 1985 | Electrical Elementary Diagram:Containment Atmosphere Monitoring Drywell Train a Temperature Process Instrumentation. Sheet 212 | |
ML20262E267 | 10 April 1985 | Electrical Elementary Diagram:Containment Atmosphere Monitoring Drywell Train a Temperature Process Instrumentation. Sheet 210 | |
ML20262E257 | 10 April 1985 | Electrical Elementary Diagram:Containment Atmosphere Monitoring Drywell Train B Temperature Process Instrumentation. Sheet 213 | |
ML20262E272 | 10 April 1985 | Electrical Elementary Diagram:Containment Atmosphere Monitoring Drywell Train B Pressure Process Instrumentation. Sheet 205 | |
ML20262E262 | 10 April 1985 | Electrical Elementary Diagram:Containment Atmosphere Monitoring Drywell Train B Temperature Process Instrumentation. Sheet 211 | |
ML20262E276 | 10 April 1985 | Electrical Elementary Diagram:Containment Atmosphere Monitoring Drywell Train a Pressure Process Instrumentation. Sheet 204 | |
ML20262E248 | 27 February 1985 | Electrical Elementary Diagram:Plant Radiation Monitoring System Drywell - Gas. Sheet 211 | |
ML20261G271 | 6 December 1984 | Electrical-Elementary Diagram:Control Room Annunciator Division 3 Diesel DC System Trouble, as-built.Sheet 283 | |
ML20261G266 | 6 December 1984 | Electrical-Elementary Diagram:Control Room Annunciator ECCS Benchboard (1H13-P601) Section 16A. Sheet 282 | |
ML20261G250 | 3 December 1984 | Electrical-Elementary Diagram:Metal Clad Switchgear 15 & 15 Kv 4.16 Kv Bus EH13 Diesel Brkr EH1301. Sheet 37 | |
ML20261M833 | 24 September 1984 | Recirculation Elbow (Welded) Cal Block PY-22-XX2-5S-F | |
ML20261G254 | 24 September 1984 | Electrical-Elementary Diagram:Dc Systems Metering & Relaying Bus ED-1-A, as-built.Sheet 14 | |
ML20262E180 | 21 September 1984 | Piping System Diagram:D23 Containment Atmosphere Monitoring System | |
ML20261G258 | 21 September 1984 | Electrical-Elementary Diagram:Dc Systems Metering & Relaying Bus ED-1-B, as-built.Sheet 15 | |
ML20261M830 | 31 July 1984 | Reactor Recirculation Cal Blocks (Welded) | |
ML20265A607 | 27 July 1984 | Piping System E12 Residual Heat Removal - Auxiliary Building Sections | |
ML20265A619 | 27 July 1984 | Piping System E12 Residual Heat Removal - Auxiliary Building Plan El 568 Ft 4 Inches and 574 Ft 10 Inches (West) | |
ML20265A614 | 27 July 1984 | Piping System E12 Residual Heat Removal - Auxiliary Building El 599 Ft - Plans & Sections | |
ML20262E225 | 4 June 1984 | I&C Location Layout Auxiliary Building Above Elevation 620 Ft 6 Inches West | |
ML20262E170 | 17 May 1984 | Piping System B21,B31 Leak Detection System and Reactor Head Vent Drain Reactor Building - Sections | |
ML20261G470 | 4 May 1984 | Mechanical Details:Pool Swell Deflector Assembly for Valves | |
ML20263P022 | 9 April 1984 | Piping System Diagram E21 Low Pressure Core Spray System. Rev Date Illegible | |
ML20262E216 | 6 April 1984 | Location Layout Reactor Building Above Elevation 642 Ft West | |
ML20262E305 | 27 February 1984 | I&C Instrument Diagram:Drywell Atmosphere Radiation Monitor D17-K670 H51-PC71 | |
ML20262C219 | 24 February 1984 | Piping System E12 Residual Heat Removal System Reactor Bldg Plan El 539 Ft-9 Inches and 574 Ft-10 Inches - East | |
ML20262C215 | 24 February 1984 | Piping System E12,Residual Heat Removal System Reactor Building - Plan El 590 Ft 9 Inches and El 574 Ft 10 Inches West | |
ML20262E291 | 15 February 1984 | I&C Instrument Diagram:Drywell Area Equipment Drain Sump Level Leak Detection | |
ML20262E238 | 8 February 1984 | I&C System D17 Plant Radiation Monitoring K670,K700,K760 | |
ML20262E193 | 7 February 1984 | I&C Location Layout Reactor Building Above Elevation 574 Ft 10 Inches East | |
ML20262E184 | 13 January 1984 | Instrument Diagram:Containment Atmosphere Monitoring and Vacuum Relief Systems B Loop | |
ML20262E229 | 5 January 1984 | I&C Location Layout Intermediate Building Above Elevation 654 Ft 6 Inches North | |
ML20263G928 | 5 January 1984 | Final Plant Layout Plan Above Elev 721 Ft Reactor Building. Rev Date Illegible | |
ML20262E207 | 5 January 1984 | I&C Location Layout Reactor Building Above Elevation 620 Ft 6 Inches East | |
ML20263G932 | 5 January 1984 | Final Plant Layout Section a Unit 1 Auxiliary Building Reactor Building & Fuel Handling Area. Rev Date Illegible | |
ML20263G925 | 5 January 1984 | Final Plant Layout Plan Above Elev 639 Ft 6 Inches Reactor Building Refueling Floor. Rev Date Illegible | |
ML20263G917 | 5 January 1984 | Final Plant Layout Plan Above El 642 Ft Reactor Bldg - Aux Bldg Roof & El 642 Ft 6 Inches Turbine Power Complex. Rev Date Illegible |