Category:Graphics incl Charts and Tables
MONTHYEARRA-23-0043, Refuel 33 (R2R33) Inservice Inspection Program Ninety Day Owner'S Activity Report and Analytical Evaluations2023-03-30030 March 2023 Refuel 33 (R2R33) Inservice Inspection Program Ninety Day Owner'S Activity Report and Analytical Evaluations RA-20-0263, Duke Energy Corp. - Request to Use Provision of Later Edition and Addenda of ASME Boiler and Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4)(iv)2020-09-16016 September 2020 Duke Energy Corp. - Request to Use Provision of Later Edition and Addenda of ASME Boiler and Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4)(iv) ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML15352A1922015-12-21021 December 2015 Revised Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood Causing Mechanism Reevaluation ML15268A2982015-10-0505 October 2015 Interim Staff Response Enclosuflooding Tables 1 and 2 ML15239B2612015-09-24024 September 2015 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation ML15226A5252015-09-0303 September 2015 HAhn_8-13-2015 ML15230A0702015-09-0303 September 2015 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10CFR50.54 Information Request - Flood Causing Mechanism Reevaluation ML15238B7232015-08-26026 August 2015 Interim Letter Public Tables (Tables 1 and 2) ML15141A0542015-05-0707 May 2015 Enclosure 6, MNS EAL Wallcharts ONS-2014-164, Revision to Tornado/Helb Mitigation Strategies and Regulatory Commitment 17T2014-12-19019 December 2014 Revision to Tornado/Helb Mitigation Strategies and Regulatory Commitment 17T ML14307B7072014-12-10010 December 2014 Supplemental Information Related to Development of Seismic Risk Evaluations for Information Request Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-T CNS-14-100, Relief Request Serial Number 14-CN-001, Relief Request for Limited Volumetric Examination of Class 1 Welds2014-09-11011 September 2014 Relief Request Serial Number 14-CN-001, Relief Request for Limited Volumetric Examination of Class 1 Welds ML14058A0462014-02-0404 February 2014 NRC Staff Comments to Duke Energy Request for Information Response BSEP 13-0071, Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Supplement to Walkdown Report2013-07-31031 July 2013 Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Supplement to Walkdown Report RA-13-012, Capability to Perform Multi-Unit Dose Assessment2013-06-26026 June 2013 Capability to Perform Multi-Unit Dose Assessment ML12312A0692012-10-17017 October 2012 Table 16.8-1-2 Unit 2 Cpcopds ML12185A0242012-07-25025 July 2012 Incidental Take Limit Met for Green Turtles at Brunswick Steam Electric Plant, Units 1 and 2 ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 ML11347A1932011-12-0808 December 2011 Day Report Pursuant to 10 CFR 50.46, Changes to or Errors in an Evaluation Model ML11207A4572011-07-21021 July 2011 Report Pursuant to 10 CFR 50.46, Changes to or Errors in an ECCS Evaluation Model ML1103500032011-02-0909 February 2011 Correction Letter for License Amendment Nos. 262 and 258, Regarding Technical Specification 3.8.4 DC (Direct Current) Sources - Operating. ML1102105652011-01-20020 January 2011 NFPA 805 Pilot License Amendment Request Review Schedule Update, January 2011 ML1029805882010-10-26026 October 2010 NFPA 805 Pilot License Amendment Request Review Schedule Update, October 2010 ML1025600662010-09-0808 September 2010 Response to Request for Additional Information Related to the License Amendment Request Applicable to Technical Specification (TS) 3.8.4 DC Sources-Operating ML1020401472010-07-22022 July 2010 NFPA 805 Pilot License Amendment Request Review Schedule Update, July 2010 ML1020302882010-07-13013 July 2010 Photograph - Brunswick Graphics and Sample Results ML1020301692010-07-0707 July 2010 Photos ML1020301682010-07-0707 July 2010 North Carolina Split Sample Results ML1013905052010-05-12012 May 2010 Event Timeline ML1019305502010-01-0101 January 2010 10CFR50.75g File: Spreadsheet Groundwater.Xls BSEP Well Samples ML0932400582009-11-19019 November 2009 NFPA 805 Pilot License Amendment Request Review and Infrastructure Update, November, 2009 ML0917603592009-06-25025 June 2009 NFPA 805 Pilot License Amendment Request Review and Infrastructure Update, June 2009 ML0914201292009-05-21021 May 2009 NFPA 805 Pilot License Amendment Request Review and Infrastructure Update, May 2009 ML0909905232009-04-29029 April 2009 Enclosure 2: Shearon Harris Regulatory Audit - Documents Reviewed ML0908403602009-03-25025 March 2009 NFPA 805 Pilot License Amendment Request Review and Infrastructure Update, March, 2009, Revised RNP-RA/08-0124, Response to Request for Additional Information NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2008-12-17017 December 2008 Response to Request for Additional Information NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML0834708362008-12-0808 December 2008 Results of MRP-139 Inspections of the Reactor Vessel Nozzle Dissimilar Metal Butt Welds During Refueling Outage 25 ML0834001812008-12-0404 December 2008 NFPA 805 Pilot License Amendment Request Review and Infrastructure Update ML0828300142008-10-0606 October 2008 Response to Request for Additional Information License Amendment Request for Implementation of Alternative Source Term ML0823302222008-08-20020 August 2008 Choice Letter Attachment Q - Pump Strainer Dp Data Analysis ML0821300962008-07-29029 July 2008 Report Pursuant to 10 CFR 50.46, Changes to or Errors in an Evaluation Model ML0812605492008-04-29029 April 2008 Transmittal of a Relief of Request Fourth Ten Year Inservice Inspection Interval ML0812003342008-04-17017 April 2008 NFPA 805 Transition Pilot Plant FAQ Log - April 2008 ML1019404992008-04-16016 April 2008 Email from Turkal, Mark to Heather Gepford; Subject: FW: Monthly Brunswick Tritium Conference Call; Attachments: Sampling Locations Data Updated 4-15-08.pdf; Updated 4-15-08 Well Pictures with Data and Graphs.Pdf ML1019505172008-03-13013 March 2008 Email from Grzeck, Lee to Heather Gepford: Attachments Sampling Locations Data Updated 3-11-08.pdf; Updated 3-11-08 Well Pictures with Data and Graps.Pdf ML1019505742008-01-11011 January 2008 Email from Randy Musser to Heather Gepford; Subject: Fwd: Emailing: Updated 01_8_08 Well Pictures with Data and Graphs. Pdf ML1019505752008-01-11011 January 2008 Email from Randy Musser to Heather Gepford; Subject: Fwd: Sampling Locations Data Updated 1-8-08.ppt; Attachments: Sampling Locations Data Updated 1-8-08.ppt ML0729200822007-10-19019 October 2007 Index of References - Shearon Harris SEIS License Renewal ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists 2023-03-30
[Table view] Category:Letter type:RA
MONTHYEARRA-24-0012, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report2024-02-0505 February 2024 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report RA-24-0015, Submittal of 2023 Sea Turtle Annual Report2024-01-10010 January 2024 Submittal of 2023 Sea Turtle Annual Report RA-23-0242, Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2)2024-01-10010 January 2024 Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2) RA-23-0325, Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX2024-01-0808 January 2024 Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX RA-23-0295, Delay of Planned End Date for Fourth 10-Year Inservice Testing (1ST) Program Interval2024-01-0404 January 2024 Delay of Planned End Date for Fourth 10-Year Inservice Testing (1ST) Program Interval RA-24-0006, 10 CFR 50.54(q) Evaluation2024-01-0404 January 2024 10 CFR 50.54(q) Evaluation RA-23-0313, Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation2023-12-14014 December 2023 Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation RA-23-0320, Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency2023-12-14014 December 2023 Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency RA-23-0306, Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of.2023-12-12012 December 2023 Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of. RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0404 December 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0182, Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test Frequency2023-11-16016 November 2023 Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test Frequency RA-23-0288, End of Cycle 27 (C1 R27) Steam Generator Tube Inspection Report2023-11-16016 November 2023 End of Cycle 27 (C1 R27) Steam Generator Tube Inspection Report RA-23-0304, Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 32 (Revision 0)2023-11-14014 November 2023 Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 32 (Revision 0) RA-23-0276, Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specific2023-11-0606 November 2023 Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specific RA-23-0279, Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power2023-11-0202 November 2023 Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes2023-11-0101 November 2023 Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes RA-23-0275, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)2023-10-12012 October 2023 Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) RA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area2023-10-0505 October 2023 License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area RA-23-0268, Transmittal of Sixth 10-Year Inservice Testing Interval Program Plan2023-09-29029 September 2023 Transmittal of Sixth 10-Year Inservice Testing Interval Program Plan RA-23-0234, Update to the Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations for Oconee Nuclear Station (ONS)2023-09-28028 September 2023 Update to the Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations for Oconee Nuclear Station (ONS) RA-23-0230, Refuel 27 (C1 R27) Inservice Inspection (ISI) Report2023-09-25025 September 2023 Refuel 27 (C1 R27) Inservice Inspection (ISI) Report RA-23-0218, Review Request for the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals2023-09-21021 September 2023 Review Request for the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes2023-09-20020 September 2023 Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes RA-23-0228, Registration for Use of General License Spent Fuel Cask Number 1752023-09-14014 September 2023 Registration for Use of General License Spent Fuel Cask Number 175 RA-22-0290, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology2023-08-30030 August 2023 License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology RA-23-0215, Independent Spent Fuel Storage Installation (ISFSI) ISFSI Docket Number 72-45 Registration of Spent Fuel Storage Casks2023-08-28028 August 2023 Independent Spent Fuel Storage Installation (ISFSI) ISFSI Docket Number 72-45 Registration of Spent Fuel Storage Casks RA-23-0223, Registration for Use of General License Spent Fuel Cask Numbers 173 and 1742023-08-23023 August 2023 Registration for Use of General License Spent Fuel Cask Numbers 173 and 174 RA-23-0222, On-Shift Staffing Analysis (Ossa), Revision 12023-08-23023 August 2023 On-Shift Staffing Analysis (Ossa), Revision 1 RA-23-0216, Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks2023-08-22022 August 2023 Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks RA-23-0199, Response to Request for Additional Information (RAI) Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner2023-08-18018 August 2023 Response to Request for Additional Information (RAI) Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner RA-23-0211, Reply to a Notice of Violation (NOV) 05000270/2023010-022023-08-17017 August 2023 Reply to a Notice of Violation (NOV) 05000270/2023010-02 RA-23-0122, License Amendment Request to Revise the 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to .2023-08-17017 August 2023 License Amendment Request to Revise the 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to . RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0195, Notice of Intentions Regarding Apparent Violation Response; (EA-23-060)2023-07-20020 July 2023 Notice of Intentions Regarding Apparent Violation Response; (EA-23-060) RA-23-0186, Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 31 (Revision 3)2023-07-18018 July 2023 Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 31 (Revision 3) RA-23-0141, Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule2023-07-12012 July 2023 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule RA-23-0184, Registration for Use of General License Spent Fuel Cask Numbers 171 and 1722023-07-10010 July 2023 Registration for Use of General License Spent Fuel Cask Numbers 171 and 172 RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require2023-07-0707 July 2023 Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require RA-23-0127, 10 CFR 50.55a(g)(4)(iv) Request to Use a Subsequent Edition of ASME Section XI Referenced in 10 CFR 50.SSa(a) for ISI Code of Record2023-06-28028 June 2023 10 CFR 50.55a(g)(4)(iv) Request to Use a Subsequent Edition of ASME Section XI Referenced in 10 CFR 50.SSa(a) for ISI Code of Record RA-23-0045, Inservice Inspection Program Owner'S Activity Report for Unit 2 Refueling Outage 262023-06-28028 June 2023 Inservice Inspection Program Owner'S Activity Report for Unit 2 Refueling Outage 26 RA-23-0146, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)2023-06-20020 June 2023 Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) RA-18-0007, License Amendment Application to Revise Control Room Cooling Technical Specifications2023-06-19019 June 2023 License Amendment Application to Revise Control Room Cooling Technical Specifications RA-23-0145, Independent Spent Fuel Storage Installation (Isfsi), Registration for Use of General License Spent Fuel Casks2023-06-15015 June 2023 Independent Spent Fuel Storage Installation (Isfsi), Registration for Use of General License Spent Fuel Casks RA-23-0135, Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory2023-06-0707 June 2023 Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory RA-23-0139, Registration for Use of General License Spent Fuel Casks2023-06-0606 June 2023 Registration for Use of General License Spent Fuel Casks RA-23-0120, Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.22023-05-31031 May 2023 Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 RA-23-0005, License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications2023-05-31031 May 2023 License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications RA-23-0041, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-30030 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations 2024-02-05
[Table view] |