ML20260D588
From kanterella
Jump to navigation
Jump to search
ML20260D588 | |
Person / Time | |
---|---|
Site: | Crystal River |
Issue date: | 05/25/1977 |
From: | GILBERT/COMMONWEALTH, INC. (FORMERLY GILBERT ASSOCIAT |
To: | FLORIDA POWER CORP. |
References | |
C-318-082, C-318-82, NUDOCS 8007020160 | |
Download: ML20260D588 (1) | |
Similar Documents at Crystal River | |
---|---|
Category:DRAWINGS
MONTHYEARML20266D7291997-12-16016 December 1997
[Table view]Auxiliary Building Support Steel for Es MCC Cabinets 3A3 & 3B2 ML20266D7341997-12-16016 December 1997 Auxiliary Building North Floor Slab El 95 0 Plan ML20266D7401997-12-16016 December 1997 Control Complex Floor Slab Elevation Plans Sections & Details ML20266D7441997-12-16016 December 1997 Control Complex Floor Slab Elevation 164 2 Plans Sections & Details ML20266D7241997-12-16016 December 1997 Miscellaneous Steel Turbine Building Equipment Frames ML20266D7481997-12-16016 December 1997 Hermetic Turbopak Liquid Chilling Systems with Marine Type Water Boxes Model Ht 90 Thru Ht 350 ML20266F0771997-10-0707 October 1997 Nuclear Services Closed Cycle Cooling.Sheet 1 of 5 ML20265A8641996-12-0606 December 1996 Layout Plan Above Reactor Auxiliary & Intermediate Buildings Elev 143 Feet 0 Inches ML20265A8691996-11-15015 November 1996 Layout Longitudinal Section Thru Reactor Bldg & Spent Fuel Pit ML20265A8741996-09-0303 September 1996 Spent Fuel Cooling.Sheet 1 of 3 ML20265A8601996-06-21021 June 1996 Layout Plan Above Reactor Auxiliary & Intermediate Buildings Mezzanine Floor Elev 119 Feet 0 Inches ML20266D7581992-04-0606 April 1992 General Arrangement.Sheet 1 of 1 ML20261B0101990-05-31031 May 1990 FWP-7 Conceptual Design ML20261B0061990-05-31031 May 1990 FWP-7 Conceptual Design ML20265C6161987-12-10010 December 1987 Nuclear Plant Piping Mu System Flow Diagram MAKE-UP & Purification, as-built.Sheet 02 of 05 ML20265C6671987-12-10010 December 1987 Nuclear Piping SW System Flow Diagram Nuclear Services Closed Cycle Cooling. Sheet 03 of 05 ML20265C6581987-12-10010 December 1987 Nuclear Piping SW System Flow Diagram Nuclear Services Closed Cycle Cooling. Sheet 01 of 05 ML20265C7131987-12-10010 December 1987 Nuclear Plant Piping Ws System Flow Diagram Containment Monitoring System, as-built.Sheet 01 of 01 ML20265C5531987-12-10010 December 1987 Turbine Plant Piping Do System Flow Diagram Domestic Water. Sheet 01 of 01 ML20265C6491987-12-0909 December 1987 Turbine Piping IA & SA System Flow Diagram Instrument Air & Station Service Air, as-built.Sheet 02 of 03 ML20265C4691987-12-0909 December 1987 Nuclear Piping CA System Flow Diagram Chemical Addition. Sheet 01 of 01 ML20261D7641987-12-0707 December 1987 Reactor Bldg Reactor Vessel Foundation Plan & Sections ML20265C5251987-11-25025 November 1987 Turbine Plant Piping DF System Flow Diagram Emergency Diesel Generator FUEL-OIL Transfer. Sheet 01 of 01 ML20265C5801987-11-25025 November 1987 Turbine Piping FW System Flow Dia Feedwater, as-built. Sheet 01 of 03 ML20265C4951987-11-13013 November 1987 Nuclear Piping Cg System Chemical Cleaning Steam Generators, as-built.Sheet 01 of 01 ML20265C5371987-11-12012 November 1987 Nuclear Dh System Flow Diagram Decay Removal. Sheet 02 of 03 ML20265C6441987-11-12012 November 1987 Nuclear Piping RW System Flow Diagram Nuclear Services and Decay Heat Sea Water. Sheet 01 of 01 ML20265C6201987-11-12012 November 1987 Nuclear Plant Piping Mu Sytem Flow Diagram MAKE-UP & Purification. Sheet 03 of 05 ML20265C6391987-11-12012 November 1987 Nuclear Plant Piping Rc System Flow Diagram Reactor Coolant. Sheet 02 of 03 ML20265C6021987-11-12012 November 1987 Turbine Plant Piping Ms & Rh System Flow Diagram. Sheet 01 of 04 ML20265C6991987-11-12012 November 1987 Nuclear Piping Flow Diagram Wd System Gas Waste Disposal. Sheet 01 of 03 ML20265C6821987-11-12012 November 1987 Nuclear Piping Wd System Flow Dia Liquid Waste Disposal (Misc Waste Subsystem). Sheet 02 of 06 ML20265C4911987-11-12012 November 1987 Nuclear Piping CF System Flow Diagram Core Flooding System. Sheet 01 of 01 ML20265C6341987-11-12012 November 1987 Nuclear Plant Piping Rc System Flow Diagram Reactor Coolant. Sheet 01 of 03 ML20265C6701987-11-12012 November 1987 Nuclear Piping SW System Flow Diagram Nuclear Services Closed Cycle Cooling. Sheet 04 of 05 ML20265C6531987-11-12012 November 1987 Nuclear Plant Piping Sf System Flow Diagram Spent Fuel Cooling. Sheet 01 of 03 ML20265C6871987-11-12012 November 1987 Nuclear Piping Wd System Flow Dia Liquid Waste Disposal (Reactor Coolant Subsystem). Sheet 03 of 06 ML20265C5641987-11-12012 November 1987 Turbine Piping Ef System Flow Diagram Emergency Feedwater. Sheet 01 of 01 ML20265C5121987-11-12012 November 1987 Flow Diagram Building Service Industrial Cooler Water. Sheet 01 of 01 ML20265C5061987-11-12012 November 1987 Building Service Flow Diagram Control Complex EFIC Rooms - El 124 Ft - 0 Inches. Sheet 01 of 01 ML20265C4801987-11-12012 November 1987 Nuclear Piping CA System Flow Diagram POST-ACCIDENT Sampling System. Sheet 01 of 01 ML20265C5011987-11-12012 November 1987 Flow Diagram Building Service Chilled Water. Sheet 01 of 01 ML20265C4851987-11-12012 November 1987 Turbine Piping Cd System Flow Diagram Condensate. Sheet 01 of 03 ML20265C7051987-11-12012 November 1987 Nuclear Piping Flow Diagram Wd System Gas Waste Disposal. Sheet 01 of 03 ML20265C7091987-11-12012 November 1987 Nuclear Piping Wd System Flow Diagram Waste Gas Sampling. Sheet 01 of 01 ML20265C5151987-11-12012 November 1987 Nuclear Piping DC System Flow Dia Decay Heat Closed Cycle Cooling. Sheet 01 of 03 ML20265C6941987-11-12012 November 1987 Nuclear Piping Wd System Flow Dia Liquid Waste Disposal (Reactor Coolant Subsystem). Sheet 04 of 06 ML20265C5311987-11-12012 November 1987 Nuclear Dh System Flow Diagram Decay Heat Removal. Sheet 01 of 03 ML20265C6761987-11-12012 November 1987 Nuclear Piping Wd System Flow Diagram Liquid Waste Disposal (Misc Waste Substation). Sheet 01 of 06 ML20265C5421987-11-12012 November 1987 Diesel Dj System Jacket Coolant Flow Diagram. Sheet 01 of 01 1997-12-16 Category:SCHEMATIC DIAGRAMS-APPLICANT'S FACILITY MONTHYEARML20260D6461977-09-0202 September 1977
[Table view]Nuclear Piping:Chemical Addition Sys Flow Diagram ML20260D5771977-09-0202 September 1977 Turbine Plant Piping:Main Steam & Reheat Steam Sys Flow Diagram ML20260D5811977-09-0202 September 1977 Turbine Plant Piping:Auxiliary Steam Sys Flow Diagram ML20260D5851977-09-0202 September 1977 Turbine Piping:Feedwater Sys Flow Diagram ML20260D6151977-09-0202 September 1977 Nuclear Piping:Steam Water Sys Flow Diagram,Nuclear Svcs Closed Cycle Cooling ML20260D6191977-09-0202 September 1977 Nuclear Piping:Reactor Waste Sys Flow Diagram,Nuclear Svcs & Decay Heat Sea Water ML20260D6231977-09-0202 September 1977 Nuclear Plant Piping:Spent Fuel Sys Flow Diagram,Spent Fuel Cooling ML20260D6321977-09-0202 September 1977 Nuclear:Decay Heat Sys Flow Diagram,Decay Heat Removal ML20260D6361977-09-0202 September 1977 Nuclear Plant Piping:Reactor Coolant Sys Flow Diagram ML20260D6391977-09-0202 September 1977 Nuclear Plant Piping:Makeup Sys Flow Diagram,Makeup & Purification ML20260D6431977-09-0202 September 1977 Nuclear Piping:Waste Disposal Sys Flow Diagram,Liquid Waste Disposal ML20260D6541977-09-0202 September 1977 Turbine Plant Piping:Co Nitrogen & Hydrogen Sys Flow Diagram ML20260D6611977-09-0202 September 1977 Nuclear Plant Piping:Ws Sys Flow Diagram,Containment Monitoring Sys ML20260D6651977-09-0202 September 1977 Nuclear Piping:Core Flooding Sys Flow Diagram ML20260D6701977-09-0202 September 1977 Nuclear Piping:Bldg Spray Sys Flow Diagram,Reactor Bldg Spray ML20260D6041977-05-25025 May 1977 Turbine Piping:Instrument Air & Station Svc Air Sys Flow Diagram ML20260D6011977-05-25025 May 1977 Turbine Plant Piping:Domestic Water Sys Flow Diagram ML20260D6261977-05-25025 May 1977 Nuclear Piping:Decay Cycle Sys Flow Diagram,Decay Heat Closed Cycle Cooling ML20260D5911977-05-25025 May 1977 Turbine Piping:Condensate Sys Flow Diagram ML20260D5881977-05-25025 May 1977 Turbine Piping:Emergency Feedwater Sys Flow Diagram ML20260D6521977-05-25025 May 1977 Nuclear Piping:Chemical Addition Sys Flow Diagram,Liquid Sampling ML20260D6751977-05-25025 May 1977 Nuclear Piping:Leak Rate Sys Flow Diagram,Reactor Bldg Leak Rate Testing Sys & Post Accident Hydrogen Purge Sys ML20260D8841976-08-27027 August 1976 Elementary Diagram:Dh Removal Heat Exchange 3B ML20260D8791976-08-27027 August 1976 Elementary Diagram:Decay Heat Removal Heat Exchange ML20260D8821976-08-13013 August 1976 Elementary Diagram:Dh Suction from Reactor Bldg to Dh Pump 3A ML20260D8771976-08-13013 August 1976 Elementary Diagram:Reactor Bldg Spray Hydraulic Inlet Isolation Valve ML20260D8781976-08-13013 August 1976 Elementary Diagram:Reactor Bldg Spray Hydraulic Inlet Isolation Valve BSV-4 ML20260D8801976-08-13013 August 1976 Elementary Diagram:Dh Suction from Reactor Bldg to Dh Pump 3B ML20260D8721976-05-25025 May 1976 Elementary Diagram:Turbine Driven Emergency Feedwater Pump, Inlet Isolation Valve ASV-5 ML20260D8701975-09-22022 September 1975 Elementary Diagram:Motor Driven Emergency Feedwater Pump ML20260D8861975-04-22022 April 1975 Elementary Diagram:Motor Driven Emergency Feedwater Pump 3A,4,160 Volt Es Switchgear Bus 3A ML20260D8871975-04-18018 April 1975 Elementary Diagram:4.16 Kv Es Bus Cross Tie Block & Diesel Generator Parallel Block Interlock ML20260D5961973-07-31031 July 1973 Turbine Piping:Chemical Generators Sys,Chemical Cleaning Steam Generators ML20260D6801973-01-23023 January 1973 Flow Diagram:Bldg Svc,Industrial Cooler Water ML20260D6081971-04-12012 April 1971 Turbine Plant Piping:Diesel Fuel Sys Flow Diagram,Emergency Diesel Generator Fuel-Oil Transfer ML20260D6111971-04-12012 April 1971 Turbine Plant Piping:Emergency Generator Sys Flow Diagram, Emergency Diesel Generator Compressed Starting Air & Engine Exhaust ML20260D6721971-04-12012 April 1971 Nuclear Piping:Bldg Spray Sys Flow Diagram,Reactor Bldg Pressure Sensing & Testing ML20260D6781970-09-21021 September 1970 Fuel Air Handling:Bldg Svc,Reactor Bldg,Fuel Handling Area & Auxiliary Bldg ML20260D5941970-02-12012 February 1970 Turbine Piping:Demineralized Water Sys Flow Diagram, Condensate & Demineralized Water Supply for Nuclear Plant ML20260D6581969-09-10010 September 1969 Nuclear Piping:Waste Disposal Flow Diagram,Gas Waste Disposal 1977-09-02 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20260D588&oldid=3142847"