Forwards Insp Rept 99901335/98-01 for Columbiana Boiler Co on 980511-14 & Notices of Violation & Nonconformance.Insp Team Reviewed Cbc Activities Associated W/Fabrication of U Hexafluoride Cylinders,Models 30B & 48Y
ML20249C679
Person / Time
Issue date: 06/25/1998
From: Shankman S
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Dougherty T
AFFILIATION NOT ASSIGNED
Shared Package
ML20249C680 List:
References
REF-QA-99901335 99901335-98-01, 99901335-98-1, NUDOCS 9807010018
Download: ML20249C679 (2)


Text

_-____-_-_-__--__--- -_- -- - - - - -- - - - - -

f J

p Mouq}

  • 1 UNITED STATES al

,j NUCLEAR REGULATORY COMMISSION

't WASHINGTON, D.C. 20665 4001

\\

          • p June 25, 1998 Columbiana Boiler Company ATTN: Mr. T. Dougherty, President 200 West Railroad Street Columbiana, Ohio 44408

SUBJECT:

NRC INSPECTION REPORT 999-1335/98-01, NOTICE OF VIOLATION, AND NOTICE OF NONCONFORMANCE

Dear Mr. Dougherty:

On May 11-14,1998, the U.S. Nuclear Regulatory Commission (NRC) performed an announced inspection of Columbiana Boiler Company (CBC) at its facility in Columbiana, Ohio.

The enclosed inspectic,n report presents the details of the inspection. Additionalinformation on 10 CFR Part 21 training was transmitted to the NRC by telephone on June 12,1998.

The inspection team reviewed CBC's activities associated with the fabrication of Uranium Hexafluoride (UF.) cylinders, Models 308 and 48Y. The team evaluated CBC's compliance with the requirements of 10 CFR Parts 21 and 71, Certificates of Compliance, and the requirements of American National Standards Institute N14.1-1990, " Uranium Hexafluoride -

Packaging for Transpor1." The inspectors focused on CBC's management and fabrication controls.

The team concluded that CBC's management controls and fabrication controls were generally acceptable and that the UF, cylinders fabricated by CBC will meet their intended safety function. However, the team identified one violation having high safety significance and five nonconformances having low safety significance.

The team was informed that CBC had hired a new Quality Assurance (QA) Manager in March 1998 who is completely updating CBC's QA program to comply with the requirements of 10 CFR Part 71. The team noted that CBC is currently in the process of developing new QA procedures which, when fully implemented, will address the issues identified during this inspection. The implementation of CBC's revised QA program was not addessed during this Inspection. However, the implementation of the updated QA program will be inspected in a

~

future inspection.

Please provide us, within 30 days of the date of this letter, a written statement in accordance with the hstructions specified in the enclosed Notice of Violation and Notice of Nonconformance. We will consider extending the response time if you can show good cause for us to do so.

980701oote 980

,,% g ev m.625..

~

JE MF NMTS WV DJOCS V

c7qjm) y g

l L

l Mr. T. Dougherty in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its enclosures, and your response will be placed in the NRC Public Document Room.

Sincerely, ORIGINAL. SIGNED BY /s/

Susan F. Shankman, Deputy Director Licensing and inspection Directorate j.

Spent Fuel Project Office, NMSS i

Enclosures:

1. NRC Inspection Report No. 999-1335/98-01
2. Notice of Violation
2. Notice of Nonconformance Docket 999-1335 I

Distnbution: Docket 999-1335 -

NRO f/c Public NMSS r/f SFPO r/f l

WKane, SFPO CHaughney, SFPO MHodges, SFPO

_ JLieberman, OE i

WReamer, OGC ELeeds, SFPO FSturz, SFPO RChappell, SFPO CHosey, Ril JMadera, Rill BSpitzberg, RIV TSIS Route i

GCwalina, NRR MMessier, OC :

l R:\\TSISQA\\ Reports \\999-1335.rpt

  • See previous concurrence i

OFC SFPO E

SFPO E

SFP h [

N'AME TMatula*

PEng*

SShhda$

h h 98 DATE 6/6/98 6/24/98 C = COVER E = COVER & ENCLOSURE N = NO COPY 6/25/98::dd 2

-