PNO-76-063:while Reactor Was in Refueling Outage on 760403,RHR Heat Exchanger Leak Occurred Which Released Reactor Water to Plant Effluent Via Heat Exchanger Cooling Water Sys.Region I Investigating Cause of Failure
ML20249B379
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 04/05/1976
From: Dreher F, Roy G, Thompson D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PNO-76-063-01, PNO-76-63-1, NUDOCS 9806220381
Download: ML20249B379 (1)


Text

,

y hf, "Yhy 7, April 5, 1976 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE -PNO-76-63 This prelirtinary notification constitutes EARLY notice of events of

) '

POSSIBLE safety or public interest significance. The information  ;

presented is as initially received without verification or evaluation I and is basically all that is known by OIE staff as of 2:20 p.m. on date of this notification. IT SHOULD BE SPECIFICALLY NOTED THAT THIS NOTIFICATION MAY CONTAIN INFORMATION THAT LATER MAY BE DETERMINED TO BE INACCURATE OR INCONSISTENT. AN OFFICE OF INSPECTION AND ENFORCEMENT NOTIFICATION OF AN INCIDENT OR OCCURRENCE (BLUE SHEET) SUBSEQUENTLY i WILL BE ISSUED IF WARRANTED.

Facility: Peach Bottom 2 (DN 50-277)

Philadelphia Electric Company

Subject:

Residual Heat Removal (RHR) Heat Exchanger Leak While the reactor was in a scheduled refueling outage, on April 3, 1976, at approximately 5:00 a.m., a RHR heat exchanger leak occurred which released 6,000 gallons of reactor water to the plant effluent via the heat exchanger cooling water system over a six minute period. Calcula- -

tions made by the licensee showed the total release to be 4.1 C1, mostly i

1131. The dilution water flow during the time of the release was 1,000,000 gal / min. Subsequent hourly samples taken down stream showed only background activity. ll l

The Technical Specification allowable release rate was exceeded for the l six minute duration of the release. The release was 40% of the total l Quarterly limit. j Region I (Philadelphia) is investigating the cause of the hsat exchanger failure and the details of the release.

i l

Media interest is not expected. The State of Pennsylvania has been

, informed. A press release is not planned.

O Region I, NRC, Philadelphia, PA received notification of this occurrence /

by telephone from the Plant Superintendent at 3:45 p.m. April 3, 1976. /

The information is current as of 11:45 a.m., April 5, 1976.

0 i

Contact:

FADreher, IE x27261 GWRoy, IE x27261 DThompson, IE x27541 2

. Distribution:

! Acting Chairman Rowden Commissioner Mason S. J. Chilk, SECY l Commissioner Gilinsky C. C. Kannerer, CA G. F. Murphy, JCAE

, Commissioner Kennedy i L. V. Cossick, EDO E. Volgenau, OIE J. A. Harris, PA B. C. Rusche, NRR J. La Fleur, ISP T. J. McTiernan, AIA .

K. R. Chapman, NMSS H. K. Shapar, ELD

. l Transmitted: PBldg2,h 9 St 2. dh ; MNBB S h

2.  ;

A; o Luge  ;

W I i

, PRELIMINARY NOTIFICAIl0N - NOT FOR PUBLIC DISCLOSURE

.a v .t 1 9906220381 760405 ..

PDR IliE (

PNO-76-063 PDR - - - - -

V - - - _ _ _ - - . - . - - _ - - - - - -