ML20249B238

From kanterella
Jump to navigation Jump to search
PNO-76-047:on 760319,licensee Reported to Region I Ofc That Planned Inservice Inspections of Tack Welds on Eight Jet Pump Retainer Bolt Keepers Disclosed That 12 Keeper Tack Welds on Eight Jet Pumps Were Broken
ML20249B238
Person / Time
Site: Pilgrim
Issue date: 03/19/1976
From: Dreher F, Roy G, Thompson D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PNO-76-047, PNO-76-47, NUDOCS 9806220217
Download: ML20249B238 (1)


Text

f h $

&p%Al PRELIMINARY 1; NOTIFICATION - NOT FOR PUP.LIC DISCLOSURE

-_ =

_=-_r

.u_.._,.,-,,..n.,,,_,

March 19, 1976 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE

--PNO-76-47 This preliminary notification constitutes _ EARLY notice of events of POSSIBLE cafety or rublic interest significance.

The information presented is as inittally receiv0d without verification or evaluation and is basically all that is knotm by OIE staff as of 4:00 p.m. on date of this notification.

IT SIIO_U_LD, BE SPECIFICALLY NOTED TilAT TilIS NOTIFICAT1011 MAY COiTAli! IliFO:UGTION TiiAT LATER MAY BE DETE10i1NED TO BE INACCURATE OR INCONSISTE:!T. AN OFFICE OF INSPECTION AND ENFORCEM

_NOTIFIC5E0'N OF AN 1;; CIDE JT OR OCCURRENCE (BLUE SilEET) SUBSEQUENTLY WILL LE ISSUED IF WAR"JJiTED.

Facility:

Pilgrim I (DN 50-293)

Subject:

FAILURE OF TACK WELDS ON JET PUMP RETAINER BOLT KEEPERS The licensee reported by telephone to the Region I office, Philadelphia, Pa., that planned inservice inspections of the tack welds on Jet Pump Retainer bolt keepers disclosed that 12 keeper tack welds on eight jet pumps were broken.

The cause appears to be vibration. No evidence of bolts loosening has been visually detected. The licensee stated that a similar inspection previously performed in 1974 had identified no problems with the subject tack we?.ds.

The licensee stated that the scheduled refueling outage now in progress would be extended 10 days in order to make the needed repairs.

Media interest is expected because of prior media attention at Pilgrim and the Pilgrim 2 hearing. The State of Massachusetts has been informed.

A press release is not planned.

NRC, Region I, Philadelphia, Pa. received notification of this occurr-ence by telephone from the licensee at 2:40 PM on 3/19/76.

1

Contact:

FADreher, IE x27261 CWRoy, IE x27261 DThompson, IE x27541 b

/ll Distribution:

Chairman Anders Commissioner Mason S. J. Chilk, SECY

[

t Commissioner Gilinsky.

Commissioner Rowden G. F. Murphy, JCAE Commissioner Kennedy C. C. Kammerer, CA gg L. V. Gossick, J. C. Davis, OIE J. A. Harris, PA B. C. Rusche, NRR J. La Fleur, ISP T. J. McTiernan, AIA K. R. Chapman, NMSS H. K. Shapar, ELD Transmitted:

P Bldg k. b ;

H St Y/ & ; MNBB I:+ ;

Luge PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE t

I 2 0 l.

9906220217 760319

~

r PDR IniE PNO-76-047 PDR

,