PNO-76-024A:on 760217,Region I Informed That Licensee Intends to Complete Design Change for Removal & Capping of Two 4 Inch Recirculation Sys Bypass Lines.Media Interest Expected Because of Pilgrim 2 Hearings
ML20249B165
Person / Time
Site: Pilgrim
Issue date: 02/18/1976
From: Dreher F, Roy G, Thornburg H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PNO-76-024A, PNO-76-24A, NUDOCS 9806220127
Download: ML20249B165 (2)


Text

~77' 4'L f' O K f N wci s. g Q p / d g q ) h j e

,3 '5

  • W e e

.s i

PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE

- - -_ - ~,..

w-u..,

_.o. m m.. o,

_ w. u a.

, c. y February 18, 1976

'j I

PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE

-PNO-76-24A This preliminary notification constitutes EARLY notice of events'of POSSIBLE safety or public interest significance.

The information presented is as initially received without verification or evaluation and is basically all that is known by 01E staff as of 9:30 a.m. on date of this notification.

IT SHOULD-BE SPECIFICALLY NOTED THAT THIS NOTIFICATION MAY CONTAIN INFORMATION THAT LATER IfAY BE DETERMINED TO-SE-INACCURATE OR INCONSISTENT. AN OFFICE OF INSPECTION AND ENFORCEMENT NOTIFICATION OF AN INCIDENT OR OCCURRENCE (BLUE SHEET) SUBSEQUENTLY WILL BE ISSUED IF WARRANTED.

Facility

. Pilgrim I (DN 50-293)

Boston Edison Company Plymouth, Massachusetts Subjects' PRELIMINARY INSERVICE INSPECTION FINDINGS DURING REFUELING OUTAGE The Region I, Philadelphia, office.was informed on February 17 that the licensee intends to complete a design change for removal and capping of the two 4" recirculation system bypass lines. This fix was employed recently by another BWR reactor,(Quad Cities)-to eliminate the 4 inch bypass pipe lines which had experienced recurrent cracks. Although NRR approval for the design change may be required, this issue should not

. affect the outage schedule.

D The Region I specialist in UT has reported that the latest UT work j

performed on the 12 inch recirculation system vessel inlet nozzle j

has determined the ultrasonic amplitude to be lower than originally determined on February 12, 1976.. The latest determinations are based g

on a calibration block of actual vessel material. The licensee is 4

proceeding to further characterize and refine the flaw size measurements o

to determine if significant changes have occurred since the 1974 in-Q service inspection. Preliminary results reported by the licensee indicate that the actual flaw size may be greater than that ireported to and evaluated by.the NRR staff and ACRS in May 1974. ACRS con-sideration and NRR approval will most likely be required prior to the resumption of operations. A formal report on this matter is

.being prepared by the. licensee. This~ issue is an important one that

'could result in an extended shutdown if-a repair to the vessel is.

~

l-

required..or a marked increase in periodic' inservice inspections.

l-Continued

,103

,m

,-u 9906220127.760218 l-POR I6E p,. _,

_ PND-76-024A, PDR l'V

~

%..c

')

Continue Page 2 February 18, 1976 PNO-76-2$&


u..-.m.,,,_-,m

.,,,,,,s.,,n..,,,,,_,,

Media interest is, expected because of the Pilgrim 2 hearings.

Co monwealth of Massachusetts has been informed.

The A press release is not planned.

Contact:

FADreher, IE x27261 GWRoy, IE x27353 HDThornbur8, IE x27541

_ Distribution:

Chairman Anders Commissioner Mason S. J. Chilk, SECY Commissioner Gilinsky Commissioner Rowden G. F. Murphy, JCAE Commissioner Kennedy C. C. Kammerer,.CA L. V. Gossick, EDO J. C. Davis OIE J. A. Harris, PA B. C. Rusche, NRR J. La Fleur ISP T. J. McTiernan, AIA K. R. Chapman, NMSS H. K. Shapar, ELD

^

Transmitted: P Bldg lb g_; H St llh MNBBff w ; Luge k

wj

(

m_.

_ = _,,

PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE M