. J. D. Woodard Southern Nuclear-
, m.
Executive Vr.e President Operating Company,Inc.
40 inverness Center Parkway Post Offee Box 1295 Birrningham, Alabama 35201 Tel 205.992.5086 SOUTHERN h L
COMPANY Energy ro Serve YourWorld*
June 10, 1998 LCV-Il69-E Docket Nos.
50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT-MAY 1918 Enclosed are the May 1998, monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with the Technical j
Specification 5.6.4.
Also enclosed is one revised page only for the April 1998 monthly operating report for VEGP Unit 1. This report was previously submitted in accordance with Technical Specification 5.6.4 by our letter dated May 11,1998 (LCV-ll69-D). Revisions to the Net Electrical Energy Generated was necessary due to an error in transcribing the station service l
for the month. The cumulative carryover effect on the Net Electrical Energy Generated has l
been reflected in the current monthly report to document the operating history of VEGP
/
Unit 1.
Sincerely, J.
Woodard
)
JDW/JLL Enclosures
. El-VEGP Unit 1 Monthly Operating Report - May 1998 E2-VEGP Unit 2 Monthly Operating Report - May 1998
} y 4 ' E3-VEGP Unit 1 Monthly Operating Report - April 1998 (corrected) cc:(See next page)
M al
~.s
7,.
l.
. U. S. Nuclear Regulatory Commission Page 2 LCV.1169-E cc: - Southern Nuclear Ooerating Comnany Mr. J. B. Beasley, Jr.
l; Mr. M. Sheibani SNC Document Managernent U. S. Nuclear Regulatory Commission
' Mr. L. A. Reyes, Regional Administrator Mr. D. Jaffe, Senior Project Manager, NRR Mr. J. Zeiler Senior Resident Inspector, Vogtle k
i 4
r l
+
.___________._.____J
r 4
ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 l
MONTIILY OPERATING REPORT FOR MAY 1998
' TABLE OF CONTENTS
. OPERATING DATA REPORT and CliALLENGES to PORV and SAFETY VALVES
~ Page El-1 UNIT S11UTDOWNS and NARRATIVE REPORT Page El 1 d
(,